Z--Provide Replacement of Heating, Ventilation, & Air
INTERIOR, DEPARTMENT OF THE
Notice type
Solicitation
Solicitation #
140P5126R0002
NAICS
238220
PSC
Z2QA
Set-aside
Service-Disabled Veteran-Owned Small Business Set Aside
Posted
June 15, 2026
Response due
June 22, 2026
Place of performance
Charleston, SC
What this opportunity is
The Department of the Interior is seeking proposals for the replacement of heating, ventilation, and air conditioning systems under NAICS code 238220. This opportunity is set aside for Service-Disabled Veteran-Owned Small Businesses, making it suitable for qualified small firms in this category. The solicitation has been extended, with proposals now due by June 22, 2026, at 1:00 PM EDT, which allows interested parties additional time to prepare their submissions.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
-- 1 of 448 --
VOLUME 2 OF 2
FOSU – 316098 TABLE OF CONTENTS - 1
TABLE OF CONTENTS
DIVISION, SECTION & PARAGRAPH NUMBERING
The numbering and lettering of sections and paragraphs in this Project Manual are merely for identification.
Sections included are listed in this Table of Contents together with the number of pages in each section.
The Contractor shall check their copies of the Project Manual against this Table of Contents and confirm
there are no missing pages or sections.
NUMBER TITLE NO. OF PAGES
00 01 10 Table of Contents ............................................................................................................. 3
DIVISION 02 – EXISTING CONDITIONS
02 05 00 General Site Construction Requirements ......................................................................... 2
02 41 00 Demolition & Abandonment............................................................................................ 4
DIVISION 05 – METALS
05 12 00 Structural Steel Framing ................................................................................................ 11
05 14 00 Louvers and Vents ........................................................................................................... 6
05 43 00 Slotted Channel Framing ................................................................................................. 4
05 50 00 Metal Fabrications ........................................................................................................... 6
DIVISION 07 – THERMAL MOISTURE & PROTECTION
07 15 00 Sheet Metal Water Proofing............................................................................................. 5
07 21 13 Fiberglass Batt Insulation ................................................................................................ 4
07 84 00 Firestopping ..................................................................................................................... 6
07 90 00 Joint Sealers ..................................................................................................................... 5
DIVISION 09 – FINISHES
09 29 00 Gypsum Board Assemblies .............................................................................................. 6
09 51 10 Suspended Acoustical Ceilings ........................................................................................ 4
09 90 00 Paints & Coatings ............................................................................................................ 8
DIVISION 23 – HEATING, VENTILATING, & AIR CONDITIONING (HVAC)
23 01 30.51 HVAC Air Duct Cleaning................................................................................................ 6
23 01 60.71 Refrigerant Recovery/Recycling...................................................................................... 2
23 05 00 Common Work Results for HVAC ................................................................................ 13
23 05 05 Selective Demolition for HVAC ...................................................................................... 4
23 05 13 Common Motor Requirements for HVAC Equipment .................................................... 3
23 05 23 General Duty Valves for HVAC Piping....................... ................................................... 8
-- 2 of 448 --
FOSU – 316098 TABLE OF CONTENTS - 2
23 05 29 Hangers & Supports for HVAC Piping & Equipment ................................................... 10
23 05 33 Heat Tracing for HVAC Piping ....................................................................................... 9
23 05 48 Vibration & Seismic Controls for HVAC...................................................................... 17
23 05 53 Identification for HVAC Piping & Equipment ................................................................ 7
23 05 93 Testing, Adjusting, & Balancing for HVAC ................................................................. 22
23 07 00 HVAC Insulation ........................................................................................................... 26
23 07 13 Ductwork Insulation ........................................................................................................ 5
23 07 19 HVAC Piping Insulation ................................................................................................ 12
23 08 00 Commissioning of HVAC ............................................................................................... 6
23 09 13 Instrumentation & Control Devices for HVAC ............................................................... 5
23 09 23 Direct Digital Control Systems for HVAC .................................................................... 11
23 11 23 Facility Natural Gas Piping.............................................................................................. 8
23 21 13 Hydronic Piping ............................................................................................................... 7
23 21 16 Hydronic Piping Specialties............................................................................................. 4
23 21 23 Hydronic Pumps .............................................................................................................. 7
23 25 00 HVAC Water Treatment .................................................................................................. 5
23 31 00 HVAC Ducts & Casings ................................................................................................ 15
23 31 13 Metal Ducts .................................................................................................................... 15
23 31 13.19 Metal Duct Fittings .......................................................................................................... 6
23 33 00 Air Duct Accessories .................................................................................................…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 238220)
N--George Washington Birthplace National Monument- RE
INTERIOR, DEPARTMENT OF THE · Solicitation · due June 26, 2026
RFQ - RFQ - 19ZA6026Q0004 - FAC NEC CHILLER MAINTENANCE- FAC NEC CHILLER MAINTENANCE
STATE, DEPARTMENT OF · Solicitation · due July 20, 2026
Installation of an Engineered Fire Suppression System
DEPT OF DEFENSE · Solicitation · due June 25, 2026
J045--High Pressure Steam Piping Replacement
VETERANS AFFAIRS, DEPARTMENT OF · Combined Synopsis/Solicitation · due July 6, 2026
1698- CE Chiller Maintenance/Service Recompete
DEPT OF DEFENSE · Solicitation · due June 22, 2026
VGLZ 252018 - Repair HVAC Building 303
DEPT OF DEFENSE · Presolicitation