Z1DA--578-26-004: IDIQ ACM Abatement Base
VETERANS AFFAIRS, DEPARTMENT OF
Notice type
Solicitation
Solicitation #
36C25226B0020
NAICS
562910
PSC
Z1DA
Posted
June 17, 2026
Response due
July 20, 2026
Description
U.S. Department
Of Veterans Affairs
Specifications
Edward Hines, Jr. VA Hospital
5000 South 5th Avenue, Hines, Illinois 60141
Project # 578-26-008
Hines Abatement - Task Order E
Design Date
October 2, 2025
36C25220B0020
ATT7.2 - Specifications
Project 578-26-008: Abatement TO-E Bldgs 1_200 Page 1 of 260
-- 1 of 260 --
Section 00 01 10
Hines Abatement – Task Order E 1 Project #578-26-008
TABLE OF CONTENTS
Section 00 01 10
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 10-25
01 32 16.15 Project Schedules 10-25
01 33 00 Submittal Register (Example, For Contractor
Reference)
10-25
01 33 23 Shop Drawings, Product Data, and Samples 10-25
01 35 26 Safety Requirements 10-25
01 42 19 Reference Standards 10-25
01 57 19 Temporary Environmental Controls 10-25
01 58 16 Temporary Interior Signage 10-25
01 74 19 Construction Waste Management 10-25
01 81 13 Sustainable Construction Requirements 10-25
DIVISION 02 – EXISTING CONDITIONS
02 82 11 Traditional Asbestos Abatement 10-25
02 82 13.13 Glovebag Asbestos Abatement 10-25
02 83 33.13 Lead-Based Paint Removal and Disposal 10-25
36C25220B0020
ATT7.2 - Specifications
Project 578-26-008: Abatement TO-E Bldgs 1_200 Page 2 of 260
-- 2 of 260 --
SECTION 01 00 00
Hines Abatement – Task Order E 1 Project #578-26-008
OOSECTION 01 00 00
GENERAL REQUIREMENTS
TABLE OF CONTENTS
1.1 SAFETY REQUIREMENTS......................................... 3
1.2 GENERAL INTENTION.......................................... 3
1.3 STATEMENT OF BID ITEM(S)................................... 3
1.4 DOCUMENTS FOR CONTRACTOR................................... 4
1.5 LOGISTICS PLAN REQUIREMENTS................................ 4
1.6 CONSTRUCTION SECURITY REQUIREMENTS......................... 6
1.7 OPERATIONS AND STORAGE AREAS............................... 8
1.8 ALTERATIONS............................................... 14
1.9 RESTORATION............................................... 16
1.10 DISPOSAL AND RETENTION................................... 17
1.11 SUBMITTAL REGISTRY....................................... 17
1.12 REQUESTS FOR INFORMATION................................. 18
1.13 PROFESSIONAL SURVEYING SERVICES.......................... 19
1.14 LAYOUT OF WORK........................................... 19
1.15 AS-BUILT DRAWINGS........................................ 20
1.16 USE OF ROADWAYS.......................................... 20
1.17 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,
UTILITIES AND IMPROVEMENTS............................... 21
1.18 TEMPORARY USE OF MECHANICAL AND ELECTRIAL EQUIPMENT...... 21
1.19 TEMPORARY USE OF EXISTING ELEVATORS...................... 23
1.20 TEMPORARY TOILETS........................................ 23
1.21 AVAILABILITY AND USE OF UTILITY SERVICES................. 23
1.22 GOVERNMENT-FURNISHED PROPERTY............................ 25
1.23 RELOCATED EQUIPMENT...................................... 26
1.24 PHOTOGRAPHIC DOCUMENTATION............................... 27
36C25220B0020
ATT7.2 - Specifications
Project 578-26-008: Abatement TO-E Bldgs 1_200 Page 3 of 260
-- 3 of 260 --
SECTION 01 00 00
Hines Abatement – Task Order E 2 Project #578-26-008
1.25 HISTORIC PRESERVATION.................................... 28
36C25220B0020
ATT7.2 - Specifications
Project 578-26-008: Abatement TO-E Bldgs 1_200 Page 4 of 260
-- 4 of 260 --
SECTION 01 00 00
Hines Abatement – Task Order E 3 Project #578-26-008
SECTION 01 00 00
GENERAL REQUIREMENTS
1.1 SAFETY REQUIREMENTS
Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection
control requirements.
1.2 GENERAL INTENTION
A. Contractor shall furnish labor and materials and perform work for the
Abatement of Rooms at Hines VA Medical Center as required by this
procurement package.
B. Visits to the site by Bidders may be made only by appointment with the
Contracting Officer’s Representative (COR) and through coordination
with the Contracting Specialist (CS) assigned to the project by the
Contracting Officer (CO).
C. Before placement and installation of work subject to tests by testing
laboratory retained by Department of Veterans Affairs, the Contractor
shall notify the COR in sufficient time to enable testing laboratory
personnel to be present at the site in time for proper taking and
testing of specimens and field inspection. Such prior notice shall be
not less than three workdays unless otherwise designated by the COR.
D. All employees of general contractor and subcontractors shall comply
with VA security management program and obtain permission of the VA
police, be identified by project and employer, and restricted from
unauthorized access. Refer to the Contractor Badging Instructions
included with the Statement of Work (SOW).
1.3 STATEMENT OF BID ITEM(S)
A. All work, services, testing, materials, labor, supervision, safety,
security, manuals, and instructions necessary to complete this project
as indicated in the procurement package, Statement of Work, Drawings,
and/or specifications shall be the responsibility of the Contractor to
provide unless expressly stated otherwise.
B. GENERAL CONSTRUCTION: Work includes all general conditions, management,
demolition, construction, and trade work necessary to successfully
complete this project as outlined in the Statement of Work.
36C25220B0020
ATT7.2 - Specifications
Project 578-26-008: Abatement TO-E Bldgs 1_200 Page 5 of 260
-- 5 of 260 --
SECTION 01 00 00
Hines Abatement – Task Order E 4 Project #578-26-008
1.4 DOCUMENTS FOR CONTRACTOR
A. Drawings, contract documents, attachments, and reference documents may
be obtained from the website where the solicitation is posted or
available upon request when noted. Additional copies will be at
Contractor's expense.
1.5 LOGISTICS PLAN REQUIREMENTS
Before any work is started, the Contractor shall submit and receive
approval for an accepted Logistics Plan. The Logistics Plan will include
(but is not limited to) the following:
A. An Organizational Ch…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 562910)
AMENDMENT 0002, SOLICITATION Notice; FA890326R0007 - Environmental Construction Optimization Services (ECOS)
DEPT OF DEFENSE · Solicitation · due July 6, 2026
Spokane VA Asbestos Testing & Abatement Services
VETERANS AFFAIRS, DEPARTMENT OF · Combined Synopsis/Solicitation · due June 24, 2026
F--North Penn – Area 7 (03X1) (RAF/DES)
ENVIRONMENTAL PROTECTION AGENCY · Special Notice · due July 8, 2026
Environmental Remediation Services (ERS) Single Award Task Order Contract (SATOC) for the Shaw Air Force Base Optimized Remediation Contract (ORC)
DEPT OF DEFENSE · Award Notice
Emergency Indoor Air Quality Remediation
AGRICULTURE, DEPARTMENT OF · Combined Synopsis/Solicitation · due June 19, 2026
RACMAC - Limited Munitions Surface Clearance, Nomans Land Island, Chilmark, MA
DEPT OF DEFENSE · Solicitation · due June 22, 2026