Home/Contractors/Eaton Corporation/contracts

Federal Contractor Profile

Eaton Corporation

$1.1B obligated·22,236 awards·25 agencies·173 NAICS

Federal Contracts

Showing award actions 1–50 of 2,703 funded award actions, most recent first.

Contracts with positive obligations
22,236
Funded award actions shown
2,703
Obligations shown
$1.1B
Awarding agencies
25

This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.

Award data as of August 27, 2026. Source: USAspending federal award records.

DateAgencyPIIDNAICSDescriptionAmount
Aug 27, 2026Department of CommerceDEPT OF COMMERCE NOAA1333MF26P0104811210EATON UPS WARRANTY AND PREVENTATIVE MAINTENANCE: FLEX: 8 HOUR RESPONSE, 7X24 COVERAGE ONLY, AFTER HOURS (7X24) W/ PARTS & LABOR, 8 HR RESPONSE TIME, 1X UPS PREVENTIVE MAINTENANCE, 5X8,1 PM PER YEAR,1X SEAL BATTERY PREVENTIVE MAINTENANCE, ANY TIME$6K
Aug 26, 2026Department of EnergyWESTERN-SIERRA NEVADA REGION89503326FWA4002435612101 YEAR MAINTENANCE & ON-CALL SUPPORT FOR TWO (2) UPS UNITS$20K
Aug 24, 2026Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH26F00265335999TO PURCHASE 2 UPS SYSTEMS FOR FK7 ATCBI AND GDT ATCBI.$20K
Aug 24, 2026Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH26F01308335999**IN SUPPORT OF RSR. UPS EQUIPMENT PURCHASE. JCN:21001007, LOC:MCC ASR, SACRAMENTO, CA. COST FOR EATON EQUIPMENT AT MCCLELLAN (SACRAMENTO), CA (MCC) ASR - UPS ESTABLISHMENT PROJECT. NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER.$146K
Aug 24, 2026Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH26F01309335999**IN SUPPORT OF RSR. UPS EQUIPMENT PURCHASE. JCN:18065587, LOC:MXF ASR, MAXWELL AFB, AL. COST FOR EATON EQUIPMENT AT MAXWELL AFB, AL (MXF) ASR - UPS ESTABLISHMENT PROJECT. NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER.$99K
Aug 12, 2026Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH26F01248811210F11 (ZME) ARTCC - 9395 AND 9390 UPS SERVICE LIFE EXTENSION PER EATON QUOTE POBU-26-P-095, DATED 7/16/26$857K
Aug 11, 2026Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH26F01221335999IIJA UPS EQUIPMENT PURCHASE. JCN:24009654, LOC:CUMB PCS, CUMBERLAND ME. COST FOR EATON EQUIPMENT AT CUMBERLAND, ME (CUMB PCS ASR) UPS REPLACEMENT PROJECT. NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER.$65K
Aug 11, 2026Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH26F01222335999UPS EQUIPMENT PURCHASE. JCN:18061134, LOC:QHY ATCBI, HIGBY, WV. COST FOR EATON EQUIPMENT AT HIGBY, WV (QHY) ATCBI UPS REPLACEMENT PROJECT. NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER.$125K
Aug 11, 2026Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH26F01223335999IIJA UPS EQUIPMENT PURCHASE. JCN:23001151, LOC:QKW PCS, MAKAH WA. COST FOR EATON EQUIPMENT AT MAKAH UPS REPLACEMENT PROJECT. NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER.$121K
Aug 11, 2026Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH26F01226335999PURCHASE AN EATON 80KW GEN 2 UPS, 40 STRING VRLA UPS BATTERIES, MAINTENANCE BYPASS PANEL (MBP), 80KVA UPS LOAD BANK, AND AUXILIARY EQUIPMENT FOR GSP ATCT AND TRACON. THE SURGE PROTECTIVE DEVICES (SPDS) ARE ALSO INCLUDED WITH THIS PURCHASE. JOSEP$204K
Aug 11, 2026Department of EnergyWESTERN-UPPER GREAT PLAINS REGION89503426PWA002334811210MAINTENANCE OF THE WTO UNIT SUB SWITCH GEAR$22K
Aug 7, 2026Department of AgricultureMRPBS MINNEAPOLIS MN12639526P0225811310POWER FACTOR CORRECTION TROUBLESHOOTING AND EVALUATION$5K
Aug 4, 2026Department of the InteriorALASKA REGIONAL OFFICE(97000)140P9724P0078811210UPS SUPPORT SERVICE - ANCHORAGE AK$7K
Aug 3, 2026Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH26F00671335999JCN: 25015989 F11 CPDS FUNDING FOR UPS SIDECARE COMPONENTS AND EQUIPMENT AT WARRENTON COMMAND CENTER (DCC) VENDOR: EATON CORPORATION$47K
Aug 3, 2026Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH26F01125335999IIJA UPS EQUIPMENT PURCHASE. JCN:23007904, LOC:MEM CPDS, MEMPHIS TN. COST FOR EATON EQUIPMENT AT MEMPHIS, TN (MEM) ATCT-CPDS UPS REPLACEMENT PROJECT. NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER.$91K
Aug 3, 2026Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH26F01134335999IIJA UPS EQUIPMENT PURCHASE. JCN:20008137, LOC:QSR ARSR, BORON CA. COST FOR EATON EQUIPMENT AT BORON, CA (QSR) ARSR UPS REPLACEMENT PROJECT. NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER.$48K
Aug 3, 2026Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH26F01137335999UPS EQUIPMENT PURCHASE. JCN:18065744, LOC:GSP ASR, GREER, SC. COST FOR EATON EQUIPMENT AT GREER, SC (GSP) ASR - UPS REPLACEMENT PROJECT. NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER.$51K
Aug 3, 2026Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH26F01138335999UPS EQUIPMENT PURCHASE. JCN:26003725, LOC:EGE ATCBI, EAGLE, CO. COST FOR EATON EQUIPMENT AT EAGLE, CO (EGE) ATCBI - UPS ESTABLISHMENT PROJECT. NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER.$125K
Aug 3, 2026Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH26F01139335999UPS EQUIPMENT PURCHASE. JCN:26003727, LOC:JAC ATCBI, JACKSON, WY. COST FOR EATON EQUIPMENT AT JACKSON HOLE, WY (JAC) ATCBI - UPS ESTABLISHMENT PROJECT. NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER.$130K
Aug 3, 2026Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH26F01140335999UPS EQUIPMENT PURCHASE. JCN:26003724, LOC:BZN ATCBI, BOZEMAN, MT. COST OF EATON EQUIPMENT AT BOZEMAN, MT (BZN) ATCBI - UPS ESTABLISHMENT PROJECT. NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER.$130K
Aug 3, 2026Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH26F01141335999UPS EQUIPMENT PURCHASE. JCN:26003726, LOC:QFV ATCBI, FREMONT VALLE, CA. COST OF EATON EQUIPMENT AT FREMONT VALLEY, CA (QFV) ATCBI - UPS ESTABLISHMENT PROJECT. NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER.$127K
Aug 3, 2026Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH26F01142335999UPS EQUIPMENT PURCHASE. JCN:26003731, LOC:SAC ATCBI, SACRAMENTO, CA. COST OF EATON EQUIPMENT AT SACRAMENTO, CA (SAC) ATCBI - UPS ESTABLISHMENT PROJECT. NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER.$125K
Jul 30, 2026Department of Veterans Affairs262-NETWORK CONTRACT OFFICE 22 (36C262)36C26226P1351811210**EMERGENCY** IR UPS REPAIR$26K
Jul 27, 2026Department of Veterans AffairsSAC FREDERICK (36C10X)36C10X21F0010238210THIS CONTRACT PROVIDES SERVICE TO UNINTERRUPTIBLE POWER SUPPLY SYSTEMS, INPUT/OUTPUT ELECTRICAL SWITCHGEAR, VALVE-REGULATED LEAD-ACID BATTERIES, AND BATTERY MANAGEMENT SYSTEM AT THE AUSTIN INFORMATION TECHNOLOGY CENTER.$195K
Jul 27, 2026Department of Transportation692M15 ACQUISITION & GRANTS, AAQ600692M1526P00072334111EATON POWER URGENT REPAIR OF CONDITIONED POWER (COP) ROOM UNINTERRUPTIBLE POWER SUPPLY$28K
Jul 23, 2026Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH26F01135811210ZOA - PERFORM LIMITED SLEP FOR KATOLIGHT EG 5 AND 6$115K
Jul 22, 2026Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH26F01089335999UPS EQUIPMENT PURCHASE. JCN:26003716, LOC:HNB ATCBI, HUNTINGBURG IN. COST FOR EATON EQUIPMENT AT HUNTINGBURG, IN (HNB) UPS REPLACEMENT PROJECT. *NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER.$125K
Jul 22, 2026Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH26F01090335999DLH ATCT 12NNGL81922$99K
Jul 22, 2026Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH26F01095335999UPS EQUIPMENT PURCHASE. JCN:26003961, LOC:LFK ATCBI, LUFKIN, TX. COST FOR EATON EQUIPMENT AT LUFKIN, TX UPS REPLACEMENT PROJECT. NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER.$126K
Jul 22, 2026Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH26F01096335999UPS EQUIPMENT PURCHASE. JCN:18065680, LOC:CHA ASR, CHATTANOOGA, TN. COST FOR EATON EQUIPMENT AT CHATTANOOGA, TN UPS REPLACEMENT PROJECT. NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER.$54K
Jul 22, 2026Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH26F01097335999UPS EQUIPMENT PURCHASE. JCN:26003722, LOC:QMO ATCBI, MONROE, OR. COST FOR EATON EQUIPMENT AT MONROE, OR (QMO) ATCBI UPS REPLACEMENT PROJECT. NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER.$134K
Jul 22, 2026Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH26F01101335999TO PROVIDE FUNDING FOR POWER SERVICES PROGRAM AND INVENTORY MANAGEMENT SUPPORT.$796K
Jul 22, 2026Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH26F01102335999IIJA UPS EQUIPMENT PURCHASE. JCN:23001464, LOC:QYD PCS, CARIBOU ME. COST FOR EATON EQUIPMENT AT CARIBOU, ME (QYD) UPS REPLACEMENT PROJECT. NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER.$102K
Jul 15, 2026Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH26F01033335999UPS EQUIPMENT PURCHASE. JCN:26003719, LOC:QPB ATCBI, SAMBURG TN. EQUIPMENT COSTS: ESTABLISH (BNATCS) A UPS/PCS AT SAMBURG, TN (QPB) ATCBI PLANNED FOR 2026. **NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER.$125K
Jul 15, 2026Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH26F01088335999IIJA UPS EQUIPMENT PURCHASE. JCN:18064824, LOC:QRW PCS, MOUNT LAGUNA CA. COST FOR EATON EQUIPMENT AT MOUNT LAGUNA, CA (QRW) ARSR UPS REPLACEMENT PROJECT. NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER.$57K
Jul 15, 2026Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH26F01091335999UPS EQUIPMENT PURCHASE. JCN:26003891, LOC:RFD ASR, ROCKFORD, IL. COST FOR EATON EQUIPMENT AT ROCKFORD, IL (RFD) UPS REPLACEMENT PROJECT. *NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER.$54K
Jul 15, 2026Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH26F01092335999UPS EQUIPMENT PURCHASE. JCN:26003889, LOC:AZO ASR, KALAMAZOO, MI. COST FOR EATON EQUIPMENT AT KALAMAZOO, MI (AZO) UPS REPLACEMENT PROJECT. NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER.$54K
Jul 15, 2026Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH26F01093335999UPS EQUIPMENT PURCHASE. JCN:26003720, LOC:QYC ATCBI, SKOWHEGAN, ME. COST FOR EATON EQUIPMENT AT SKOWHEGAN, ME (QYC) UPS REPLACEMENT PROJECT. NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER.$127K
Jul 15, 2026Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH26F01094335999UPS EQUIPMENT PURCHASE. JCN:26003717, LOC:QOO ATCBI, ANSON, TX. COST FOR EATON EQUIPMENT AT ANSON, TX UPS REPLACEMENT PROJECT. NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER.$126K
Jul 9, 2026Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH26F01032335999UPS EQUIPMENT PURCHASE. JCN:26003715, LOC:EGV ATCBI, EAGLE RIVER WI. EQUIPMENT COSTS: ESTABLISH (BNATCS) UPS/PCS AT EAGLE RIVER, WI (EGV) ATCBI PLANNED FOR 2027. **NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER.$127K
Jul 9, 2026Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH26F01034335999UPS EQUIPMENT PURCHASE. JCN:26003721, LOC:PVU ATCBI, PROVO UT. EQUIPMENT COSTS: ESTABLISH (BNATCS) A UPS/PCS AT PROVO, UT (PVU) ATCBI PLANNED FOR 2027. **NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER.$131K
Jul 9, 2026Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH26F01056811210ZJX EG 3 AND 4 SLEP$350K
Jul 9, 2026Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH26F01057335999UPS SHIPPING. BULK FUNDING FOR SHIPPING FOR THE RSR UPS ESTABLISHMENT PROJECTS. 37 SITES AT $8000 EACH. TOTAL: $296,000. JCNS COVERED: 26003715, 18065578, 26003719, 26003721, 26003716, 26003891, 18065744, 18065587, 26003722, 26003889, 26003720, 21$296K
Jul 1, 2026Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH26F00671335999JCN: 25015989 F11 CPDS FUNDING FOR UPS SIDECARE COMPONENTS AND EQUIPMENT AT WARRENTON COMMAND CENTER (DCC) VENDOR: EATON CORPORATION$21K
Jul 1, 2026Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH26F01014335999UPS EQUIPMENT PURCHASE. JCN:21006280, LOC:RNOA PCS, RENO NV. EQUIPMENT COSTS: REPLACE UPS (T2) AT RENO, NV (RNOA) ASR-11 PCS LAST INSTALLED IN 2005.$60K
Jul 1, 2026Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH26F01015335999UPS EQUIPMENT PURCHASE. JCN:22009279, LOC:LCHE PCS, LAKE CHARLES LA. EQUIPMENT COSTS: REPLACE UPS AT LAKE CHARLES, LA (LCHE) PCS ARSR LAST REPLACED IN 2011. *$8000 TO BE CHARGED AGAINST FREIGHT T.O.$79K
Jul 1, 2026Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH26F01016335999UPS EQUIPMENT PURCHASE. JCN:23001459, LOC:NEN PCS, WHITEHOUSE FL. COST FOR EATON EQUIPMENT AT WHITEHOUSE (NEN) UPS REPLACEMENT PROJECT. *NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER.$64K
Jul 1, 2026Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH26F01021335999JCN:25016389 F11 CPDS FUNDING FOR UPS MBP REPLACEMENT EQUIPMENT AT FT. LAUDERDALE FL FLL ATCT VENDOR: EATON CORPORATION$14K
Jul 1, 2026Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH26F01025335999IIJA UPS EQUIPMENT PURCHASE. JCN:20008126, LOC:AMA ARSR, AMARILLO TX. EQUIPMENT COSTS: AREPLACE UPS (T1) AT AMARILLO, TX (AMA/AMAC) ARSR-FPS, 120KVA INSTALLED IN 2009. $8000 TO BE CHARGED AGAINST FREIGHT T.O.$79K
Jul 1, 2026Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH26F01026335999UPS EQUIPMENT PURCHASE. JCN:18065578, LOC:ACY ASR, ATLANTIC CITY NJ. EQUIPMENT COST FOR ESTABLISHING (BNATCS) UPS/PCS AT ACY ASR ATLANTIC CITY NJ. NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER.$100K

Get Alerted Before Eaton Corporation's Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.

Start Free