Showing award actions 1–50 of 2,703 funded award actions, most recent first.
- Contracts with positive obligations
- 22,236
- Funded award actions shown
- 2,703
- Obligations shown
- $1.1B
- Awarding agencies
- 25
This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.
Award data as of August 27, 2026. Source: USAspending federal award records.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Aug 27, 2026 | Department of CommerceDEPT OF COMMERCE NOAA | 1333MF26P0104 | 811210 | EATON UPS WARRANTY AND PREVENTATIVE MAINTENANCE: FLEX: 8 HOUR RESPONSE, 7X24 COVERAGE ONLY, AFTER HOURS (7X24) W/ PARTS & LABOR, 8 HR RESPONSE TIME, 1X UPS PREVENTIVE MAINTENANCE, 5X8,1 PM PER YEAR,1X SEAL BATTERY PREVENTIVE MAINTENANCE, ANY TIME | $6K |
| Aug 26, 2026 | Department of EnergyWESTERN-SIERRA NEVADA REGION | 89503326FWA400243 | 561210 | 1 YEAR MAINTENANCE & ON-CALL SUPPORT FOR TWO (2) UPS UNITS | $20K |
| Aug 24, 2026 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH26F00265 | 335999 | TO PURCHASE 2 UPS SYSTEMS FOR FK7 ATCBI AND GDT ATCBI. | $20K |
| Aug 24, 2026 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH26F01308 | 335999 | **IN SUPPORT OF RSR. UPS EQUIPMENT PURCHASE. JCN:21001007, LOC:MCC ASR, SACRAMENTO, CA. COST FOR EATON EQUIPMENT AT MCCLELLAN (SACRAMENTO), CA (MCC) ASR - UPS ESTABLISHMENT PROJECT. NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER. | $146K |
| Aug 24, 2026 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH26F01309 | 335999 | **IN SUPPORT OF RSR. UPS EQUIPMENT PURCHASE. JCN:18065587, LOC:MXF ASR, MAXWELL AFB, AL. COST FOR EATON EQUIPMENT AT MAXWELL AFB, AL (MXF) ASR - UPS ESTABLISHMENT PROJECT. NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER. | $99K |
| Aug 12, 2026 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH26F01248 | 811210 | F11 (ZME) ARTCC - 9395 AND 9390 UPS SERVICE LIFE EXTENSION PER EATON QUOTE POBU-26-P-095, DATED 7/16/26 | $857K |
| Aug 11, 2026 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH26F01221 | 335999 | IIJA UPS EQUIPMENT PURCHASE. JCN:24009654, LOC:CUMB PCS, CUMBERLAND ME. COST FOR EATON EQUIPMENT AT CUMBERLAND, ME (CUMB PCS ASR) UPS REPLACEMENT PROJECT. NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER. | $65K |
| Aug 11, 2026 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH26F01222 | 335999 | UPS EQUIPMENT PURCHASE. JCN:18061134, LOC:QHY ATCBI, HIGBY, WV. COST FOR EATON EQUIPMENT AT HIGBY, WV (QHY) ATCBI UPS REPLACEMENT PROJECT. NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER. | $125K |
| Aug 11, 2026 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH26F01223 | 335999 | IIJA UPS EQUIPMENT PURCHASE. JCN:23001151, LOC:QKW PCS, MAKAH WA. COST FOR EATON EQUIPMENT AT MAKAH UPS REPLACEMENT PROJECT. NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER. | $121K |
| Aug 11, 2026 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH26F01226 | 335999 | PURCHASE AN EATON 80KW GEN 2 UPS, 40 STRING VRLA UPS BATTERIES, MAINTENANCE BYPASS PANEL (MBP), 80KVA UPS LOAD BANK, AND AUXILIARY EQUIPMENT FOR GSP ATCT AND TRACON. THE SURGE PROTECTIVE DEVICES (SPDS) ARE ALSO INCLUDED WITH THIS PURCHASE. JOSEP | $204K |
| Aug 11, 2026 | Department of EnergyWESTERN-UPPER GREAT PLAINS REGION | 89503426PWA002334 | 811210 | MAINTENANCE OF THE WTO UNIT SUB SWITCH GEAR | $22K |
| Aug 7, 2026 | Department of AgricultureMRPBS MINNEAPOLIS MN | 12639526P0225 | 811310 | POWER FACTOR CORRECTION TROUBLESHOOTING AND EVALUATION | $5K |
| Aug 4, 2026 | Department of the InteriorALASKA REGIONAL OFFICE(97000) | 140P9724P0078 | 811210 | UPS SUPPORT SERVICE - ANCHORAGE AK | $7K |
| Aug 3, 2026 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH26F00671 | 335999 | JCN: 25015989 F11 CPDS FUNDING FOR UPS SIDECARE COMPONENTS AND EQUIPMENT AT WARRENTON COMMAND CENTER (DCC) VENDOR: EATON CORPORATION | $47K |
| Aug 3, 2026 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH26F01125 | 335999 | IIJA UPS EQUIPMENT PURCHASE. JCN:23007904, LOC:MEM CPDS, MEMPHIS TN. COST FOR EATON EQUIPMENT AT MEMPHIS, TN (MEM) ATCT-CPDS UPS REPLACEMENT PROJECT. NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER. | $91K |
| Aug 3, 2026 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH26F01134 | 335999 | IIJA UPS EQUIPMENT PURCHASE. JCN:20008137, LOC:QSR ARSR, BORON CA. COST FOR EATON EQUIPMENT AT BORON, CA (QSR) ARSR UPS REPLACEMENT PROJECT. NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER. | $48K |
| Aug 3, 2026 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH26F01137 | 335999 | UPS EQUIPMENT PURCHASE. JCN:18065744, LOC:GSP ASR, GREER, SC. COST FOR EATON EQUIPMENT AT GREER, SC (GSP) ASR - UPS REPLACEMENT PROJECT. NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER. | $51K |
| Aug 3, 2026 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH26F01138 | 335999 | UPS EQUIPMENT PURCHASE. JCN:26003725, LOC:EGE ATCBI, EAGLE, CO. COST FOR EATON EQUIPMENT AT EAGLE, CO (EGE) ATCBI - UPS ESTABLISHMENT PROJECT. NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER. | $125K |
| Aug 3, 2026 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH26F01139 | 335999 | UPS EQUIPMENT PURCHASE. JCN:26003727, LOC:JAC ATCBI, JACKSON, WY. COST FOR EATON EQUIPMENT AT JACKSON HOLE, WY (JAC) ATCBI - UPS ESTABLISHMENT PROJECT. NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER. | $130K |
| Aug 3, 2026 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH26F01140 | 335999 | UPS EQUIPMENT PURCHASE. JCN:26003724, LOC:BZN ATCBI, BOZEMAN, MT. COST OF EATON EQUIPMENT AT BOZEMAN, MT (BZN) ATCBI - UPS ESTABLISHMENT PROJECT. NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER. | $130K |
| Aug 3, 2026 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH26F01141 | 335999 | UPS EQUIPMENT PURCHASE. JCN:26003726, LOC:QFV ATCBI, FREMONT VALLE, CA. COST OF EATON EQUIPMENT AT FREMONT VALLEY, CA (QFV) ATCBI - UPS ESTABLISHMENT PROJECT. NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER. | $127K |
| Aug 3, 2026 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH26F01142 | 335999 | UPS EQUIPMENT PURCHASE. JCN:26003731, LOC:SAC ATCBI, SACRAMENTO, CA. COST OF EATON EQUIPMENT AT SACRAMENTO, CA (SAC) ATCBI - UPS ESTABLISHMENT PROJECT. NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER. | $125K |
| Jul 30, 2026 | Department of Veterans Affairs262-NETWORK CONTRACT OFFICE 22 (36C262) | 36C26226P1351 | 811210 | **EMERGENCY** IR UPS REPAIR | $26K |
| Jul 27, 2026 | Department of Veterans AffairsSAC FREDERICK (36C10X) | 36C10X21F0010 | 238210 | THIS CONTRACT PROVIDES SERVICE TO UNINTERRUPTIBLE POWER SUPPLY SYSTEMS, INPUT/OUTPUT ELECTRICAL SWITCHGEAR, VALVE-REGULATED LEAD-ACID BATTERIES, AND BATTERY MANAGEMENT SYSTEM AT THE AUSTIN INFORMATION TECHNOLOGY CENTER. | $195K |
| Jul 27, 2026 | Department of Transportation692M15 ACQUISITION & GRANTS, AAQ600 | 692M1526P00072 | 334111 | EATON POWER URGENT REPAIR OF CONDITIONED POWER (COP) ROOM UNINTERRUPTIBLE POWER SUPPLY | $28K |
| Jul 23, 2026 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH26F01135 | 811210 | ZOA - PERFORM LIMITED SLEP FOR KATOLIGHT EG 5 AND 6 | $115K |
| Jul 22, 2026 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH26F01089 | 335999 | UPS EQUIPMENT PURCHASE. JCN:26003716, LOC:HNB ATCBI, HUNTINGBURG IN. COST FOR EATON EQUIPMENT AT HUNTINGBURG, IN (HNB) UPS REPLACEMENT PROJECT. *NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER. | $125K |
| Jul 22, 2026 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH26F01090 | 335999 | DLH ATCT 12NNGL81922 | $99K |
| Jul 22, 2026 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH26F01095 | 335999 | UPS EQUIPMENT PURCHASE. JCN:26003961, LOC:LFK ATCBI, LUFKIN, TX. COST FOR EATON EQUIPMENT AT LUFKIN, TX UPS REPLACEMENT PROJECT. NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER. | $126K |
| Jul 22, 2026 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH26F01096 | 335999 | UPS EQUIPMENT PURCHASE. JCN:18065680, LOC:CHA ASR, CHATTANOOGA, TN. COST FOR EATON EQUIPMENT AT CHATTANOOGA, TN UPS REPLACEMENT PROJECT. NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER. | $54K |
| Jul 22, 2026 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH26F01097 | 335999 | UPS EQUIPMENT PURCHASE. JCN:26003722, LOC:QMO ATCBI, MONROE, OR. COST FOR EATON EQUIPMENT AT MONROE, OR (QMO) ATCBI UPS REPLACEMENT PROJECT. NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER. | $134K |
| Jul 22, 2026 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH26F01101 | 335999 | TO PROVIDE FUNDING FOR POWER SERVICES PROGRAM AND INVENTORY MANAGEMENT SUPPORT. | $796K |
| Jul 22, 2026 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH26F01102 | 335999 | IIJA UPS EQUIPMENT PURCHASE. JCN:23001464, LOC:QYD PCS, CARIBOU ME. COST FOR EATON EQUIPMENT AT CARIBOU, ME (QYD) UPS REPLACEMENT PROJECT. NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER. | $102K |
| Jul 15, 2026 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH26F01033 | 335999 | UPS EQUIPMENT PURCHASE. JCN:26003719, LOC:QPB ATCBI, SAMBURG TN. EQUIPMENT COSTS: ESTABLISH (BNATCS) A UPS/PCS AT SAMBURG, TN (QPB) ATCBI PLANNED FOR 2026. **NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER. | $125K |
| Jul 15, 2026 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH26F01088 | 335999 | IIJA UPS EQUIPMENT PURCHASE. JCN:18064824, LOC:QRW PCS, MOUNT LAGUNA CA. COST FOR EATON EQUIPMENT AT MOUNT LAGUNA, CA (QRW) ARSR UPS REPLACEMENT PROJECT. NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER. | $57K |
| Jul 15, 2026 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH26F01091 | 335999 | UPS EQUIPMENT PURCHASE. JCN:26003891, LOC:RFD ASR, ROCKFORD, IL. COST FOR EATON EQUIPMENT AT ROCKFORD, IL (RFD) UPS REPLACEMENT PROJECT. *NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER. | $54K |
| Jul 15, 2026 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH26F01092 | 335999 | UPS EQUIPMENT PURCHASE. JCN:26003889, LOC:AZO ASR, KALAMAZOO, MI. COST FOR EATON EQUIPMENT AT KALAMAZOO, MI (AZO) UPS REPLACEMENT PROJECT. NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER. | $54K |
| Jul 15, 2026 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH26F01093 | 335999 | UPS EQUIPMENT PURCHASE. JCN:26003720, LOC:QYC ATCBI, SKOWHEGAN, ME. COST FOR EATON EQUIPMENT AT SKOWHEGAN, ME (QYC) UPS REPLACEMENT PROJECT. NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER. | $127K |
| Jul 15, 2026 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH26F01094 | 335999 | UPS EQUIPMENT PURCHASE. JCN:26003717, LOC:QOO ATCBI, ANSON, TX. COST FOR EATON EQUIPMENT AT ANSON, TX UPS REPLACEMENT PROJECT. NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER. | $126K |
| Jul 9, 2026 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH26F01032 | 335999 | UPS EQUIPMENT PURCHASE. JCN:26003715, LOC:EGV ATCBI, EAGLE RIVER WI. EQUIPMENT COSTS: ESTABLISH (BNATCS) UPS/PCS AT EAGLE RIVER, WI (EGV) ATCBI PLANNED FOR 2027. **NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER. | $127K |
| Jul 9, 2026 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH26F01034 | 335999 | UPS EQUIPMENT PURCHASE. JCN:26003721, LOC:PVU ATCBI, PROVO UT. EQUIPMENT COSTS: ESTABLISH (BNATCS) A UPS/PCS AT PROVO, UT (PVU) ATCBI PLANNED FOR 2027. **NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER. | $131K |
| Jul 9, 2026 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH26F01056 | 811210 | ZJX EG 3 AND 4 SLEP | $350K |
| Jul 9, 2026 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH26F01057 | 335999 | UPS SHIPPING. BULK FUNDING FOR SHIPPING FOR THE RSR UPS ESTABLISHMENT PROJECTS. 37 SITES AT $8000 EACH. TOTAL: $296,000. JCNS COVERED: 26003715, 18065578, 26003719, 26003721, 26003716, 26003891, 18065744, 18065587, 26003722, 26003889, 26003720, 21 | $296K |
| Jul 1, 2026 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH26F00671 | 335999 | JCN: 25015989 F11 CPDS FUNDING FOR UPS SIDECARE COMPONENTS AND EQUIPMENT AT WARRENTON COMMAND CENTER (DCC) VENDOR: EATON CORPORATION | $21K |
| Jul 1, 2026 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH26F01014 | 335999 | UPS EQUIPMENT PURCHASE. JCN:21006280, LOC:RNOA PCS, RENO NV. EQUIPMENT COSTS: REPLACE UPS (T2) AT RENO, NV (RNOA) ASR-11 PCS LAST INSTALLED IN 2005. | $60K |
| Jul 1, 2026 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH26F01015 | 335999 | UPS EQUIPMENT PURCHASE. JCN:22009279, LOC:LCHE PCS, LAKE CHARLES LA. EQUIPMENT COSTS: REPLACE UPS AT LAKE CHARLES, LA (LCHE) PCS ARSR LAST REPLACED IN 2011. *$8000 TO BE CHARGED AGAINST FREIGHT T.O. | $79K |
| Jul 1, 2026 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH26F01016 | 335999 | UPS EQUIPMENT PURCHASE. JCN:23001459, LOC:NEN PCS, WHITEHOUSE FL. COST FOR EATON EQUIPMENT AT WHITEHOUSE (NEN) UPS REPLACEMENT PROJECT. *NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER. | $64K |
| Jul 1, 2026 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH26F01021 | 335999 | JCN:25016389 F11 CPDS FUNDING FOR UPS MBP REPLACEMENT EQUIPMENT AT FT. LAUDERDALE FL FLL ATCT VENDOR: EATON CORPORATION | $14K |
| Jul 1, 2026 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH26F01025 | 335999 | IIJA UPS EQUIPMENT PURCHASE. JCN:20008126, LOC:AMA ARSR, AMARILLO TX. EQUIPMENT COSTS: AREPLACE UPS (T1) AT AMARILLO, TX (AMA/AMAC) ARSR-FPS, 120KVA INSTALLED IN 2009. $8000 TO BE CHARGED AGAINST FREIGHT T.O. | $79K |
| Jul 1, 2026 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH26F01026 | 335999 | UPS EQUIPMENT PURCHASE. JCN:18065578, LOC:ACY ASR, ATLANTIC CITY NJ. EQUIPMENT COST FOR ESTABLISHING (BNATCS) UPS/PCS AT ACY ASR ATLANTIC CITY NJ. NOTE $8,000.00 WILL BE CHARGED TO THE FREIGHT TASK ORDER. | $100K |