Home/Contractors/Kubricky Construction Corp

Federal Contractor Profile

Kubricky Construction Corp

Federal contracting record: $54M obligated across 4 awards from 2 agencies, FY 20162025.

$54M
Total Obligated
4
Award Records
2
Agencies Served
2
NAICS Codes

Company Profile

UEI (Unique Entity Identifier)

DL36KLS1F8S5

CAGE Code

1BNC8

Parent Organization

D. A. Collins Construction CO., INC.

Address

269 BALLARD RD, GANSEVOORT, NY, 128311357

First Federal Award

Feb 19, 2016

Most Recent Award

May 8, 2025

Federal Sales Analytics

Toggle between trend, agency drilldown, and treemap. Use the period selector to focus the time window.

Hover any bar for YoY change + award count. Current fiscal year shown at reduced opacity (partial year).

Top Federal Agencies

  • Department of Defense

    74.1% of total obligations

    $40M
  • Department of Transportation

    25.9% of total obligations

    $14M

Top NAICS Activity

  • 237310

    HIGHWAY, STREET, AND BRIDGE CONSTRUCTION

    1 awards

    $40M
  • 237990

    OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION

    3 awards

    $14M

Recent Federal Awards

DateAgencyNAICSDescriptionAmount
Apr 3, 2025Department of Transportation6923G5 GREAT LAKES ST LAWRENCE SWY DEV. CORP.237990SNELL LOCK DIFFUSER REPLACEMENT.$50K
Feb 22, 2024Department of Transportation6923G5 GREAT LAKES ST LAWRENCE SWY DEV. CORP.237990SNELL LOCK DIFFUSER REPLACEMENT.$16K
Jan 29, 2024Department of Transportation6923G5 GREAT LAKES ST LAWRENCE SWY DEV. CORP.237990SNELL LOCK DIFFUSER REPLACEMENT.$90K
Jan 23, 2024Department of Transportation6923G5 GREAT LAKES ST LAWRENCE SWY DEV. CORP.237990SNELL LOCK DIFFUSER REPLACEMENT.$20K
Mar 1, 2023Department of Transportation6923G5 GREAT LAKES ST LAWRENCE SWY DEV. CORP.237990SNELL LOCK DIFFUSER REPLACEMENT.$11K
Feb 13, 2023Department of Transportation6923G5 GREAT LAKES ST LAWRENCE SWY DEV. CORP.237990SNELL LOCK DIFFUSER REPLACEMENT.$15K
Nov 10, 2022Department of Transportation6923G5 GREAT LAKES ST LAWRENCE SWY DEV. CORP.237990SNELL LOCK DIFFUSER REPLACEMENT.$7.5M
Mar 7, 2022Department of Transportation6923G5 GREAT LAKES ST LAWRENCE SWY DEV. CORP.237990DESIGN AND CONSTRUCTION FOR REPLACEMENT OF DIFFUSER STRUCTURES AT LOCK.$72K
Aug 24, 2021Department of DefenseW7N4 USPFO ACTIVITY VT ARNG237310IGF::OT::IGF PROJECT NUMBER CURZ152809 TAXIWAY F&NORTH ARM/PAD, CURZ152810 TAXIWAY D&NORTH ARM/PAD, CURZ152811 AIRFIELD PAVEMENTS AT THE 158TH FIGHTER WING, SOUTH BURLINGTON, VERMONT. APRON WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 64,000 SQUARE YARDS (SY) OF PORTLAND CEMENT CONCRETE (PCC) AND ASPHALT CEMENT CONCRETE (ACC) ON THE NORTH AND SOUTH APRON WITH SLIP-FORM PCC PAVING WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN APRON AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY D WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 33,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY F WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 62,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW.$20K
Feb 17, 2021Department of Transportation6923G5 GREAT LAKES ST LAWRENCE SWY DEV. CORP.237990DESIGN AND CONSTRUCTION FOR REPLACEMENT OF DIFFUSER STRUCTURES AT LOCK.$49K
Nov 30, 2020Department of Transportation6923G5 GREAT LAKES ST LAWRENCE SWY DEV. CORP.237990DESIGN AND CONSTRUCTION FOR REPLACEMENT OF DIFFUSER STRUCTURES AT LOCK.$6.2M
Nov 30, 2020Department of Transportation6923G5 GREAT LAKES ST LAWRENCE SWY DEV. CORP.237990DESIGN AND CONSTRUCTION FOR REPLACEMENT OF DIFFUSER STRUCTURES AT LOCK.$7K
Oct 17, 2018Department of DefenseW7N4 USPFO ACTIVITY VT ARNG237310IGF::OT::IGF PROJECT NUMBER CURZ152809 TAXIWAY F&NORTH ARM/PAD, CURZ152810 TAXIWAY D&NORTH ARM/PAD, CURZ152811 AIRFIELD PAVEMENTS AT THE 158TH FIGHTER WING, SOUTH BURLINGTON, VERMONT. APRON WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 64,000 SQUARE YARDS (SY) OF PORTLAND CEMENT CONCRETE (PCC) AND ASPHALT CEMENT CONCRETE (ACC) ON THE NORTH AND SOUTH APRON WITH SLIP-FORM PCC PAVING WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN APRON AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY D WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 33,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY F WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 62,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW.$151K
Aug 30, 2018Department of DefenseW7N4 USPFO ACTIVITY VT ARNG237310IGF::OT::IGF PROJECT NUMBER CURZ152809 TAXIWAY F&NORTH ARM/PAD, CURZ152810 TAXIWAY D&NORTH ARM/PAD, CURZ152811 AIRFIELD PAVEMENTS AT THE 158TH FIGHTER WING, SOUTH BURLINGTON, VERMONT. APRON WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 64,000 SQUARE YARDS (SY) OF PORTLAND CEMENT CONCRETE (PCC) AND ASPHALT CEMENT CONCRETE (ACC) ON THE NORTH AND SOUTH APRON WITH SLIP-FORM PCC PAVING WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN APRON AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY D WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 33,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY F WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 62,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW.$105K
Jan 11, 2018Department of DefenseW7N4 USPFO ACTIVITY VT ARNG237310IGF::OT::IGF PROJECT NUMBER CURZ152809 TAXIWAY F&NORTH ARM/PAD, CURZ152810 TAXIWAY D&NORTH ARM/PAD, CURZ152811 AIRFIELD PAVEMENTS AT THE 158TH FIGHTER WING, SOUTH BURLINGTON, VERMONT. APRON WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 64,000 SQUARE YARDS (SY) OF PORTLAND CEMENT CONCRETE (PCC) AND ASPHALT CEMENT CONCRETE (ACC) ON THE NORTH AND SOUTH APRON WITH SLIP-FORM PCC PAVING WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN APRON AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY D WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 33,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY F WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 62,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW.$49K
Jan 3, 2018Department of DefenseW7N4 USPFO ACTIVITY VT ARNG237310IGF::OT::IGF PROJECT NUMBER CURZ152809 TAXIWAY F&NORTH ARM/PAD, CURZ152810 TAXIWAY D&NORTH ARM/PAD, CURZ152811 AIRFIELD PAVEMENTS AT THE 158TH FIGHTER WING, SOUTH BURLINGTON, VERMONT. APRON WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 64,000 SQUARE YARDS (SY) OF PORTLAND CEMENT CONCRETE (PCC) AND ASPHALT CEMENT CONCRETE (ACC) ON THE NORTH AND SOUTH APRON WITH SLIP-FORM PCC PAVING WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN APRON AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY D WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 33,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY F WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 62,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW.$11K
Nov 14, 2017Department of DefenseW7N4 USPFO ACTIVITY VT ARNG237310IGF::OT::IGF PROJECT NUMBER CURZ152809 TAXIWAY F&NORTH ARM/PAD, CURZ152810 TAXIWAY D&NORTH ARM/PAD, CURZ152811 AIRFIELD PAVEMENTS AT THE 158TH FIGHTER WING, SOUTH BURLINGTON, VERMONT. APRON WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 64,000 SQUARE YARDS (SY) OF PORTLAND CEMENT CONCRETE (PCC) AND ASPHALT CEMENT CONCRETE (ACC) ON THE NORTH AND SOUTH APRON WITH SLIP-FORM PCC PAVING WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN APRON AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY D WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 33,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY F WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 62,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW.$30K
Sep 23, 2016Department of DefenseW7N4 USPFO ACTIVITY VT ARNG237310IGF::OT::IGF PROJECT NUMBER CURZ152809 TAXIWAY F&NORTH ARM/PAD, CURZ152810 TAXIWAY D&NORTH ARM/PAD, CURZ152811 AIRFIELD PAVEMENTS AT THE 158TH FIGHTER WING, SOUTH BURLINGTON, VERMONT. APRON WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 64,000 SQUARE YARDS (SY) OF PORTLAND CEMENT CONCRETE (PCC) AND ASPHALT CEMENT CONCRETE (ACC) ON THE NORTH AND SOUTH APRON WITH SLIP-FORM PCC PAVING WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN APRON AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY D WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 33,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY F WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 62,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW.$40M

Related Contractors

Other companies active in NAICS 237310HIGHWAY, STREET, AND BRIDGE CONSTRUCTION.

Track Kubricky Construction Corp Recompetes Before They Post

Mindy monitors Kubricky Construction Corp's active contracts and alerts you 12 months before they expire — so you can position to compete on recompete.

Get Free Recompete Alerts