Federal Contractor Profile
Redstone Defense Systems
$912M obligated·660 awards·1 agencies·2 NAICS
Federal Contracts
Showing contracts 51–100 of 621 total. Sorted by action date, most recent first. Excludes $0 modifications.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Nov 28, 2018 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0124 | 336413 | THE PROTOTYPE INTEGRATION FACILITY (PIF) REQUIRES SUPPORT TO CONDUCT OPERATIONS IN THE PIF AIRCRAFT HANGER LOCATED AT BUILDING 4803, REDSTONE ARMY AIRFIELD. | $165K |
| Nov 27, 2018 | Department of DefenseW6QK ACC-RSA | 0624 | 336413 | IGF::OT::IGF ORDER 0624 PROGRAM MANAGEMENT, ENGINEERING DEVELOPMENT AND OR COMMERCIAL SOLUTION SELECTION, INTEGRATION, TEST AND EVALUATION, AND INSTALLATION OF A FEDERAL AVIATION ADMINISTRATION FAA APPROVED SUPPLEMENTAL TYPE CERTIFICATED STC FOR AUTOMATIC DEPENDENT SURVEILLANCE BROADCAST ADSB INTO THE US ARMY UH 72A LAKOTA. | $240K |
| Nov 26, 2018 | Department of DefenseW6QK ACC-RSA | W58RGZ18F0044 | 336413 | THE PURPOSE OF THIS STATEMENT OF WORK (SOW) IS TO DEFINE THE EFFORT REQUIRED TO OBTAIN AN AIRWORTHINESS RELEASE (AWR) FOR THE UNITED STATES CUSTOMS AND BORDER PROTECTION (CBP) H-60 AIRCRAFT FLEET MODIFIED WITH AN AUTOMATIC DEPENDENT SURVEILLANCE-BROADCAST (ADS-B) OUT SOLUTION. | $329K |
| Nov 26, 2018 | Department of DefenseW6QK ACC-RSA | 0315 | 336413 | IGF::OT::IGF INTEGRATION/QUALIFICATION FOR THE H-60L DIGITAL COCKPIT UPGRADE KIT, W58RGZ-12-D-0089, TASK ORDER 0315 (ORDER EXECUTION PLAN 16231) . | $1.7M |
| Nov 8, 2018 | Department of DefenseW6QK ACC-RSA | 0572 | 336413 | IGF::OT::IGF , TO 572, "UAE APACHE REDUCED SIZE CRASHWORTHY EXTERNAL FUEL SYSTEM (RCEFS)/MULTIFUNCTION SYSTEM PROCESSOR UNIT (MSPU) KIT INSTALLS&MAIN ROTOR HEAD (MRH) CONTAINER ASSEMBLIES" | $81K |
| Nov 7, 2018 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0079 | 336413 | THE MISSILE DEFENSE AGENCY REQUESTS THE PROTOTYPE INTEGRATION FACILITY (PIF) TO FABRICATE AND INTEGRATE THE TERMINAL HIGH ALTITUDE AREA DEFENSE (THAAD) REMOTE LAUNCHER BEYOND LINE OF SITE (RLBLOS) COMMUNICATIONS PACKAGE. | $1.1M |
| Oct 11, 2018 | Department of DefenseW6QK ACC-RSA | 0773 | 336413 | THE CONTRACTOR SHALL PROVIDE 45 FANS INSTALLATION KITS IN ACCORDANCE WITH (IAW) THE GOVERNMENT FURNISHED DRAWINGS PACKAGE 1068784. INSTALLATION KITS SHALL CONTAIN A-KIT, AND THE B-KITS SHALL BE DELIVERED SEPARATELY. TWENTY KITS (20) SHALL BE DELIVERED NO LATER THAN NOVEMBER 2018, AND TWENTY-FIVE (25) KITS NO LATER THAN FEBRUARY 2019. THE CONTRACTOR SHALL PROVIDE THREE (3) NAVIGATIONAL DATABASE LOADERS. THE CONTRACTOR SHALL PROVIDE TWO (2) YEARS OF MONTHLY NAVIGATIONAL DATABASE UPDATES FOR EACH FANS B-KIT DELIVERED AS PART OF THIS EFFORT. THE DATABASE UPDATES SHALL BE ACTIVATED UPON INSTALLATION INTO THE AIRCRAFT. | $995K |
| Sep 28, 2018 | Department of DefenseW6QK ACC-RSA | 0719 | 336413 | IGF::OT::IGF NEW TO THE CONTRACTOR SHALL NOTIFY THE IPT OF ALL PMI-1 MAINTENANCE, SERVICE BULLETINS, AND TECHNICAL DIRECTIVES REQUIRED DURING AIRCRAFT MAINTENANCE/MODIFICATION. THE CONTRACTOR SHALL PERFORM AIRCRAFT MODERNIZATION AND ANY NEW TECHNICAL DIRECTIVE AS CALLED OUT IN PLANNED MAINTENANCE INTERVAL (PMI) REQUIREMENTS SPECIFICATION, DATED 15 JUNE 2016, WHEN AUTHORIZED IN WRITING BY THE PIF COR. THE CONTRACTOR SHALL NOTIFY THE PIF COR OF ALL REPAIRS, UPGRADE, TEST AND MAINTENANCE FLIGHTS REQUIRED BY MAINTENANCE PROCEDURES, SERVICE BULLETINS, OR AIRWORTHINESS DIRECTIVES. THE GOVERNMENT WILL PROVIDE PILOTS FOR FLIGHTS AS NEEDED. THE CONTRACTOR SHALL PROVIDE GROUND SUPPORT FOR ALL FLIGHTS. FUNDING FOR SCHEDULED MAINTENANCE, SERVICE BULLETINS, AIRWORTHINESS DIRECTIVES, AND GROUND FLIGHT SUPPORT SHALL BE TRACKED AS A SEPARATE WBS ON THE COST REPORT. AIRCRAFT DISCREPANCIES, DEFECTS, AND AIRCRAFT SYSTEM FAILURES DISCOVERED DURING THE PMI EVENT (BUT NOT PART OF A SPECIFIC PMI INSPECTION REQUIREMENT) SHALL BE IDENTIFIED BY THE CONTRACTOR AND REPORTED AS AN EXAMINER AND EVALUATOR DISCREPANCY REPORT IAW DI-MISC-80508B-2. THE CONTRACTOR SHALL PREPARE THIS REPORT FOR DISCREPANCY CLASSIFICATION (IN-SERVICE REPAIR, O-LEVEL, OR UNSCHEDULED COMPONENT REPAIR), DEFECT CLASSIFICATION (CRITICAL, MAJOR, MINOR, AND NOTED BUT NOT CORRECTED [NBNC]), AND TASK RESOLUTION. THE CONTRACTOR SHALL NOTIFY THE GOVERNMENT UPON BECOMING AWARE OF ANY ISSUE WITH THE TYPE, AREA, AND NATURE OF DISCREPANCY AND DEFECT. THE CONTRACTOR SHALL PROVIDE A PROPOSED RESOLUTION TO THE GOVERNMENT, BUT SHALL NOT EXECUTE ANY REPAIRS, MAINTENANCE, OR CHANGES UNTIL RECEIPT OF THE WRITTEN APPROVAL OF THE PIF COR. THE CONTRACTOR SHALL NOTIFY THE PIF COR OF ALL TEST AND MAINTENANCE FLIGHTS REQUIRED BY MAINTENANCE PROCEDURES. THE GOVERNMENT WILL PROVIDE PILOTS FOR FLIGHTS AS NEEDED. THE CONTRACTOR SHALL PROVIDE GROUND SUPPORT FOR ALL FLIGHTS. FUNDING FOR UNSCHEDULED MAINTENANCE SHALL BE TRACKED AS A SEPARATE WBS ON THE COST REPORT. | $24K |
| Sep 28, 2018 | Department of DefenseW6QK ACC-RSA | W58RGZ18F0188 | 336413 | CH-47F SAUDI SPECIAL TOOLS AND TEST EQUIPMENT SUPPORT. | $1.3M |
| Sep 27, 2018 | Department of DefenseW6QK ACC-RSA | W58RGZ18F0048 | 336413 | 3.1. KIT FABRICATION 3.1.1. (BASE) THE CONTRACTOR SHALL PROVIDE ONE (1) KIT, IAW THE UH-60V MECHANICAL KIT BILL OF MATERIAL, AS DETAILED IN APPENDIX B (CPFF). THE CONTRACTOR SHALL PROVIDE TWO (2) KITS, IAW THE UH-60V MECHANICAL KIT BILL OF MATERIAL, AS DETAILED IN APPENDIX B (FFP). 3.1.2. (OPTION 1) THE CONTRACTOR SHALL PROVIDE A MINIMUM QUANTITY OF TEN (10) UP TO A MAXIMUM QUANTITY OF FORTY (40) KITS, IAW THE UH-60V MECHANICAL KIT BILL OF MATERIAL, AS DETAILED IN APPENDIX B. 3.1.3. (OPTION 2) THE CONTRACTOR SHALL PROVIDE A MINIMUM QUANTITY OF TEN (10) UP TO A MAXIMUM QUANTITY OF FORTY (40) KITS, IAW THE UH-60V MECHANICAL KIT BILL OF MATERIAL, AS DETAILED IN APPENDIX B. 3.1.4. (OPTION 3) ENGINEERING SUPPORT THE CONTRACTOR SHALL PROVIDE ENGINEERING SUPPORT DURING THE FIRST YEAR OF LOW RATE INITIAL PRODUCTION (LRIP). SUPPORT SHALL INCLUDE ENGINEERING SUPPORT TO THE PRODUCTION LINE AT CORPUS CHRISTI ARMY DEPOT (CCAD) AND UPDATING DOCUMENTATION TO INCLUDE ENGINEERING CHANGE PROPOSALS (ECP) FOR EXISTING DRAWINGS AND/OR WORK PACKAGES AND ON AIRCRAFT ACTIVITIES AT REDSTONE ARSENAL. | $4.9M |
| Sep 27, 2018 | Department of DefenseW6QK ACC-RSA | W58RGZ18F0093 | 336413 | SUPPORT THE CARGO PROGRAM MANAGEMENT OFFICE (PMO) THROUGH THE FABRICATION AND INTEGRATION OF THE CH-47F PARTIAL HYBRID ENHANCED BALLISTIC PROTECTION SYSTEM (HEBPS). THE HEBPS INCLUDES THREE MAJOR COMPONENTS THE CABIN AFT AND FORWARD, VERTICAL PASSENGER PANEL (PAX) AND THE ASSEMBLY ARMOR COCKPIT SECTION KIT. THE HEBPS PROVIDES A FRAMED TRANSPARENT BALLISTIC AREA/ OVERALL OF THE AIRCRAFT AND PROTECTION FROM 7.62 MM BALLISTIC ROUNDS. THE ASSEMBLY ARMOR COCKPIT SECTION KIT PROVIDES THE VERTICAL BALLISTIC ARMOR SECTIONS, RAILS/BRACKETS, AND INSTALLATION HARDWARE FOR THE COCKPIT FLOOR. | $1.5M |
| Sep 27, 2018 | Department of DefenseW6QK ACC-RSA | W58RGZ18F0175 | 336413 | THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO PROVIDE EIGHTY-SEVEN (87) AVR-2A AFT SENSOR MOUNTS PN 4290363-501 AND EIGHTY-SEVEN (87) AVR-2A AFT SENSOR MOUNTS PN 4290363-502. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS. | $428K |
| Sep 27, 2018 | Department of DefenseW6QK ACC-RSA | 0714 | 336413 | IGF::OT::IGF NEW ORDER 0714 SOW:NAVO NP3 CM/MO SUPPORT THE OCEANOGRAPHIC DEPARTMENT, CODE NP3, WITHIN THE NAVAL OCEANOGRAPHIC OFFICE (NAVO), PROVIDES SOLUTIONS TO COMPLEX OCEANOGRAPHIC PROBLEMS FOR THE US NAVY. THE OCEANOGRAPHIC DEPARTMENT USES A VARIETY OF OCEANOGRAPHIC SYSTEMS TO COLLECT THE DATA REQUIRED TO SOLVE THESE PROBLEMS. NP3 PERFORMS ALL THE NECESSARY ENGINEERING AND LOGISTICAL FUNCTIONS REQUIRED TO MAINTAIN THESE SYSTEMS AT A HIGH LEVEL OF READINESS. | $52K |
| Sep 27, 2018 | Department of DefenseW6QK ACC-RSA | W58RGZ18F0173 | 336413 | PROCUREMENT, MANUFACTURING, DESIGN, ENGINEERING, KITTING, AND SHIPPING OF THE US FORCES KOREA FIELDING PACKAGE | $5.3M |
| Sep 26, 2018 | Department of DefenseW6QK ACC-RSA | 0652 | 336413 | US ARMY UC31 CURRENT UTILIZE THE UNIVERSITY UNS-1ESPEW WHITE MANAGEMENT SYSTEM AND MULTIPLE AVA COMPONTS THROUGH THE AIRSPACE TO MEET ARMY TRANSPORT REQUIREMENTS. PURPOSE OF THE EFFECT IS TO ADSB OUT OPERATIONS | $1.9M |
| Sep 26, 2018 | Department of DefenseW6QK ACC-RSA | 0774 | 336413 | THE PROTOTYPE INTEGRATION FACILITY (PIF) HAS A REQUIREMENT IN SUPPORT OF THE LITTORAL COMBAT SHIP (LCS) PROGRAM EXECUTIVE OFFICE (PEO) FOR THE PROCUREMENT OF ROLL-ON/ROLL-OF (RO/RO) CONTAINERS TO SUPPORT UH-60 SEAHAWK EMPLOYMENTS ON THE LCS. | $100K |
| Sep 26, 2018 | Department of DefenseW6QK ACC ANAD | 0034 | 336992 | IGF::OT::IGF. VARIOUS SUPPORT SERVICES FOR THE CABLE BUILD FOR THE JOINT ASSAULT BREACHER (JAB) PROGRAM. | $495K |
| Sep 25, 2018 | Department of DefenseW6QK ACC-RSA | 0556 | 336413 | IGF::OT::IGF NAVO REMUS AUV SUPPORT | $70K |
| Sep 12, 2018 | Department of DefenseW6QK ACC-RSA | 0683 | 336413 | IGF::OT::IGF THE CONTRACTOR SHALL PERFORM SCHEDULED MAINTENANCE, SERVICE BULLETINS, AND AIRWORTHINESS DIRECTIVES ON TWENTY-FOUR (24) UH-72A AIRCRAFT PER MASTER SERVICE MANUAL 05-11-00 AND 05-12-00 WHEN AUTHORIZED IN WRITING BY THE PIF COR. THE CONTRACTOR SHALL NOTIFY THE PROTOTYPE INTEGRATION FACILITY (PIF) CONTRACTING OFFICERS REPRESENTATIVE (COR) OF ALL SCHEDULED AND UNSCHEDULED MAINTENANCE, SERVICE BULLETINS, AND AIRWORTHINESS DIRECTIVES REQUIRED DURING AIRCRAFT MODIFICATION. THE CONTRACTOR SHALL SUBMIT A WORK REQUEST TO THE PIF COR OF ALL UNSCHEDULED MAINTENANCE REQUIRED DURING AIRCRAFT MODIFICATION IAW DI-MISC-80508/T. FOR WORK REQUESTS LESS THAN OR EQUAL TO $3,500, THE CONTRACTOR SHALL PERFORM UNSCHEDULED MAINTENANCE FOLLOWING SUBMISSION OF THE WORK REQUEST TO THE PIF COR. FOR WORK REQUESTS GREATER THAN $3,500, THE CONTRACTOR SHALL PERFORM UNSCHEDULED MAINTENANCE UPON WRITTEN APPROVAL OF THE PIF COR. THE GOVERNMENT ANTICIPATES OVERTIME WILL BE REQUIRED TO SUPPORT MAINTENANCE ACTIVITIES. THE GOVERNMENT ANTICIPATES UP TO 2200 HOURS WILL BE REQUIRED DURING THE EXECUTION OF UNSCHEDULED MAINTENANCE EVENTS. | $1.9M |
| Sep 12, 2018 | Department of DefenseW6QK ACC-RSA | 0691 | 336413 | IGF::OT::IGF THE PURPOSE OF THIS STATEMENT OF WORK (SOW) IS TO DEFINE THE EFFORTS REQUIRED TO INTEGRATE THE DE-ICE CONTROL INDICATING UNIT (DCIU) ONTO THE HH/UH-60M. THE DCIU IS A SINGLE LINE REPLACEMENT UNIT (LRU) THAT REPLACES THE THREE LEGACY LRUS (CONTROL PANEL, ICE RATE METER, AND TEST PANEL). THIS EFFORTS WILL RESULT IN AN ENGINEERING CHANGE PROPOSAL (ECP) AND TECHNICAL MANUAL UPDATES FOR BOTH THE HH/UH-60M AIRCRAFT. | $40K |
| Sep 7, 2018 | Department of DefenseW6QK ACC-RSA | 0753 | 336413 | AVIATION GROUND SUPPORT EQUIPMENT (AGSE) IDENTIFIED IN APPENDIX C IN SUPPORT OF AFGHAN FOREIGN MILITARY SALES (FMS) CASE W5-B-UAQ. | $19M |
| Aug 30, 2018 | Department of DefenseW6QK ACC-RSA | W58RGZ18F0109 | 336413 | THIS STATEMENT OF WORK (SOW) ADDRESSES THE REQUIREMENTS FOR THE PATRIOT ADVANCED CAPABILITY-3 (PAC-3) MISSILE SEGMENT ENHANCEMENT (MSE) STACK FRAME PART NUMBER (13682326) AND SKID ASSEMBLY PART NUMBER (13682383) AND ASSOCIATED TOOLING. | $1.2M |
| Aug 28, 2018 | Department of DefenseW6QK ACC-RSA | 0694 | 336413 | IGF::OT::IGF NEW ORDER BASE SUSTAINMENT, ASSESSMENTS, TRAINING, AND OTHER SUPPORT ASSOCIATED WITH THE FIELDED MK18 MOD 2 INCREMENT 0 ASSETS. OPTION 1 PROCUREMENT OF NEW MK18 MOD2 INCREMENT 0 ASSETS. OPTION 2 PROCUREMENT OF NEW MK18 MOD2 INCREMENT 0 ASSETS. OPTION 3 PROCUREMENT OF NEW MK18 MOD2 INCREMENT 0 ASSETS. OPTION 4 PROCUREMENT OF NEW MK18 MOD2 INCREMENT 0 ASSETS. OPTION 5 PROCUREMENT OF NEW MK18 MOD2 INCREMENT 0 ASSETS. OPTION 6 REFURBISHMENT FIELDED MK18 MOD 2 INCREMENT 0 RIGID HULL INFLATABLE BOATS, 11M RHIB. OPTION 7 REFURBISHMENT FIELDED MK18 MOD 2 INCREMENT 0 SPARE PARTS AND REPAIR PARTS. OPTION 8 PROCUREMENT OF NEW MK18 MOD2 INCREMENT 0 ASSETS. OPTION 9 ADDITIONAL COLLABORATIVE ASSESSMENT ENVIRONMENTS AND USER EVALUATIONS. | $2.3M |
| Aug 23, 2018 | Department of DefenseW6QK ACC-RSA | W58RGZ18F0003 | 336413 | PROVIDE TECHNICAL SUPPORT TO THE PRECISION FIRES ROCKET AND MISSILE SYSTEMS (PFRMS) PROJECT OFFICE (PO) TO UPGRADE UNITED ARAB EMIRATES (UAE) HIGH MOBILITY ARTILLERY ROCKET SYSTEMS (HIMARS) LAUNCHERS WITH DRIVERS VISION ENHANCER (DVE), CREW CHIEF RESTRAINT SYSTEM (CCRS), AND SAPPHIRE GLASS / TRANSPARENT ARMOR RETROFIT KIT. | $958K |
| Aug 23, 2018 | Department of DefenseW6QK ACC-RSA | 0766 | 336413 | THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED FOR THE PROCUREMENT, INTEGRATION, PROVISIONING, KITTING, AND DELIVERY OF MULTIPLE APACHE MISSION ESSENTIAL PACKAGES (MEPS), MODIFICATION KITS AND APACHE PARTS. THIS INCLUDES APACHE MISSION SUPPORT MATERIAL COMPRISING OF AIRCRAFT SURVIVABILITY PRODUCT IMPROVEMENT (ASPI) KITS, HIGH PERFORMANCE SHOCK STRUTS (HPSS), AIRCRAFT COMPONENTS/HARDWARE, AND INSPECTION/REPAIR OF AIRCRAFT PARTS. ADDITIONALLY, THE CONTRACTOR WILL VERIFY THE APACHE MODIFICATION KIT CONFIGURATIONS, TECHNICAL DATA PACKAGES, DEVELOPMENT/SUSTAINMENT OF MODIFICATION WORK ORDER (MWO) AND OTHER SUPPORT DOCUMENTS FOR INSTALLATION ACTIVITIES. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS. | $2.1M |
| Aug 22, 2018 | Department of DefenseW6QK ACC-RSA | 0648 | 336413 | IGF::OT::IGF THE STATEMENT OF WORK DEFINES THE EFFORT REQUIRED FOR TEARDOWN, DEPOPULATION OF CRASH DAMAGED AIRCRAFT (CDA) AND SHIPMENT AS REQUIRED, REPAIR OF APACHE AIRCRAFT AND PROCUREMENT/REPAIR/SUPPORT OF EQUIPMENT SYSTEMS AND PECULIAR GROUND SUPPORT EQUIPMENT (PGSE). MODELING OF AIRCRAFT PART/SYSTEM DATA CAPTURE AND ANALYSIS TO INCLUDE 3D PRINTING/MODELED OF AH-64 AIRFRAME, SENSOR, SIGHTING, ELECTRICAL, DRIVETRAIN COMPONENTS AND ENGINE COMPONENTS, POINT CLOUD DATA CAPTURE AND POST PROCESSING AS DIRECTED WILL BE REQUIRED. MODERNIZED SIGNAL PROCESSING UNIT (MSPU) SOFTWARE DEVELOPMENT, FABRICATING OR PROCURING OF PARTS, KITS, SPECIAL TOOLS, PROVIDING DESIGNATED ENGINEERING SUPPORT FOR APACHE TRAINING SYSTEMS, SUSTAINMENT SUPPORT OF NEW EQUIPMENT TRAINING TEAM (NETT) TRAILER, DATABASE MANAGEMENT OF GFE, GFI, CDA PARTS, AND SUPPORT FOR ALL ASSOCIATED TRAVEL REQUIREMENTS. ADDITIONAL TASKS WILL BE ON SIGHT WEIGHING OF COMPLETED TRAINING DEVICES AND WEIGHT AND BALANCE FORM GENERATION. | $975K |
| Aug 22, 2018 | Department of DefenseW6QK ACC-RSA | W58RGZ18F0076 | 336413 | REQUIREMENT FOR AUDIO WIRE KITS TO BE USED IN CONJUNCTION WITH MAINTENANCE WORK ORDER (MWO) 1-1520-271-50-44 ON THE CH-47F. THE KITS WILL BE USED TO PROVIDE A NEEDED REPAIR OF THE INTER COMMUNICATIONS SYSTEM (ICS) FOR STATUS AUDIO FROM THE COMMON MISSILE WARNING SYSTEM (CMWS) TO THE ICS. | $121K |
| Aug 22, 2018 | Department of DefenseW6QK ACC-RSA | 0431 | 336413 | IGF::OT::IGF FMS QATAR AND INDONESIA APACHE SUPPORT KITS | $224K |
| Aug 20, 2018 | Department of DefenseW6QK ACC-RSA | 0694 | 336413 | IGF::OT::IGF NEW ORDER BASE SUSTAINMENT, ASSESSMENTS, TRAINING, AND OTHER SUPPORT ASSOCIATED WITH THE FIELDED MK18 MOD 2 INCREMENT 0 ASSETS. OPTION 1 PROCUREMENT OF NEW MK18 MOD2 INCREMENT 0 ASSETS. OPTION 2 PROCUREMENT OF NEW MK18 MOD2 INCREMENT 0 ASSETS. OPTION 3 PROCUREMENT OF NEW MK18 MOD2 INCREMENT 0 ASSETS. OPTION 4 PROCUREMENT OF NEW MK18 MOD2 INCREMENT 0 ASSETS. OPTION 5 PROCUREMENT OF NEW MK18 MOD2 INCREMENT 0 ASSETS. OPTION 6 REFURBISHMENT FIELDED MK18 MOD 2 INCREMENT 0 RIGID HULL INFLATABLE BOATS, 11M RHIB. OPTION 7 REFURBISHMENT FIELDED MK18 MOD 2 INCREMENT 0 SPARE PARTS AND REPAIR PARTS. OPTION 8 PROCUREMENT OF NEW MK18 MOD2 INCREMENT 0 ASSETS. OPTION 9 ADDITIONAL COLLABORATIVE ASSESSMENT ENVIRONMENTS AND USER EVALUATIONS. | $398K |
| Aug 20, 2018 | Department of DefenseW6QK ACC-RSA | 0761 | 336413 | THE PROTOTYPE INTEGRATION FACILITY (PIF) HAS A REQUIREMENT TO ISSUE ORDER 0761 AGAINST CONTRACT W58RGZ-12D-0089 TO THE INTEGRATION OF TEN (10) APACHE LOT IV MODIFICATIONS. THIS INCLUDES APACHE FIELD SUPPORT MATERIAL COMPRISED OF AH-64E (IMPROVED) KITS, AIRCRAFT COMPONENTS/HARDWARE, AND INSPECTION/REPAIR OF AIRCRAFT PARTS. ADDITIONALLY, THE CONTRACTOR WILL VERIFY THE APACHE MODIFICATION KIT CONFIGURATIONS, TECHNICAL DATA PACKAGES, DEVELOPMENT/SUSTAINMENT OF MODIFICATION WORK ORDER (MWO) AND OTHER SUPPORT DOCUMENTS FOR INSTALLATION ACTIVITIES. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS. | $3.9M |
| Aug 16, 2018 | Department of DefenseW6QK ACC-RSA | W58RGZ18F0049 | 336413 | THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED FOR THE PROCUREMENT, MANUFACTURING, INTEGRATION, KITTING, AND DELIVERY OF MULTIPLE APACHE MISSION ESSENTIAL PACKAGES (MEPS), MODIFICATION KITS, AND APACHE PARTS. | $11M |
| Aug 15, 2018 | Department of DefenseW6QK ACC-RSA | 0460 | 336413 | IGF::OT::IGF, ORDER 0460 TO SUPPORT THE SWICE PROGRAM. | $1.5M |
| Aug 15, 2018 | Department of DefenseW6QK ACC-RSA | 0768 | 336413 | THE PROTOTYPE INTEGRATION FACILITY (PIF) HAS A REQUIREMENT TO ISSUE ORDER 0768 AGAINST CONTRACT W58RGZ-12-D-0089. THIS EFFORT WILL PROVIDE THIRTY (30) ALL UP ROUND BALLASTS, GRADE B (AURBB) AND AN OPTION FOR AN ADDITIONAL TWENTY (20) AURBB. | $9.6M |
| Aug 15, 2018 | Department of DefenseW6QK ACC-RSA | 0678 | 336413 | IGF::OT::IGF THE CONTRACTOR SHALL PROVIDE TWO (2) AIRFIELD PROTECTION TEST ASSETS IAW THE GOVERNMENT FURNISHED PRELIMINARY TDP. | $1.6M |
| Aug 15, 2018 | Department of DefenseW6QK ACC-RSA | 0675 | 336413 | IGF::OT::IGF ORDER 0675 THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED FOR THE PROGRAM MANAGEMENT, DEVELOPMENT, LOGISTICAL PLANNING, ACQUIRING HARDWARE, KITTING, DOCUMENTATION, DESIGN, INTEGRATION, SYSTEM INTEGRATION, STORAGE, TRANSPORTATION, FIELDING, PROVISIONING, AND PROVIDING TECHNICAL DATA ASSOCIATED WITH PROVISIONING OF THE AIRCRAFT ARMAMENT TOOL KIT (AARTK). THE IMPLEMENTATION OF THIS CAPABILITY IS VIA A MODIFICATION WORK ORDER (MWO) TO THE CURRENT INDIVIDUAL AIRCRAFT ARMAMENT REPAIRMEN TOOL SET (IAARTS) TO THE NEW AARTK. THE MODIFIED AARTK WILL BE ADDED TO THE CATS FAMILY OF TOOL KITS. | $1.8M |
| Aug 15, 2018 | Department of DefenseW6QK ACC-RSA | W58RGZ18F0075 | 336413 | THE PROTOTYPE INTEGRATION FACILITY (PIF) HAS A REQUIREMENT IN SUPPORT OF THE LITTORAL COMBAT SHIP (LCS) PROGRAM EXECUTE OFFICE (PEO) PMS 505 AND THE MISSION PACKAGE SUPPORT FACILITY (MPSF) IN DEPLOYMENT OF HIGH QUALITY HARDWARE ON TIME AND ON BUDGET, ALLOWING INTEGRATION OF THIS HARDWARE INTO A JOINT OPERATIONAL ENVIRONMENT. THIS SHALL INCLUDE ACQUISITION, SUSTAINMENT, ENGINEERING AND PERFORMANCE MANAGEMENT AND MEASUREMENT PROCESS SUPPORT. | $1.5M |
| Aug 15, 2018 | Department of DefenseW6QK ACC-RSA | 0604 | 336413 | IGF::OT::IGF THIS SOW DEFINES THE EFFORT REQUIRED TO PROVIDE AND INTEGRATE UH-60L AIRCRAFT WITH THE EXTERNAL STORES SUPPORT SYSTEM (ESSS) MOUNTED RESCUE HOIST (EMRH). THE INTEGRATION OF THE EMRH WILL RESOLVE INTERFERENCE ISSUES WITH MEDEVAC MISSION KITS. | $769K |
| Aug 15, 2018 | Department of DefenseW6QK ACC-RSA | 0651 | 336413 | IGF::OT::IGF ORDER 0651 STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO PROVIDE AN EVALUATION OF THE CRITICAL COMPONENTS WITHIN THE TOPOGRAPHIC SUPPORT SET (TSS) AND ITS ANCILLARY EQUIPMENT WITH RESPECT TO OBSOLESCENCE, REPAIR REQUIREMENTS, AND SUPPORTABILITY, AS WELL AS TO REPAIR A SUBSET OF THE EVALUATED COMPONENTS USING RESIDUAL GOVERNMENT FURNISHED MATERIAL (GFM) INVENTORIES AND RETURN THEM TO SERVICE. IN 2007, THE NAVAL AIR SYSTEMS COMMAND (NAVAIR) PARTNERED WITH THE AVIATION&MISSILE RESEARCH DEVELOPMENT AND ENGINEERING CENTER (AMRDEC) PROTOTYPE INTEGRATION FACILITY (PIF) TO BUILD A LIMITED QUANTITY OF TOPOGRAPHIC SUPPORT SET (TSS) SYSTEMS FOR THEIR SPECIAL FORCES. SINCE 2007, THE NAVAIR HAS TRANSITIONED CONTROL OF THE ASSET TO THE NAVAL SUPPLY SYSTEMS COMMAND (NAVSUP), AND PROTOTYPE AND INTEGRATION FACILITY (PIF) HAS PROVIDED PERIODIC SUPPORT FOR DAMAGE ASSESSMENT AND REPAIR DUE TO THEIR UNIQUE KNOWLEDGE OF THE SYSTEM. TODAY, MANY OF THE TSS COMPONENTS HAVE BECOME OBSOLETE AND THE SOURCES OF SUPPLY ARE NO LONGER AVAILABLE, YET THE NAVY MUST CONTINUE TO MAINTAIN THE SYSTEM UNTIL THE REPLACEMENT SYSTEM IS QUALIFIED AND FIELDED, WHICH IS NOT EXPECTED UNTIL 2022. | $389K |
| Aug 15, 2018 | Department of DefenseW6QK ACC-RSA | W58RGZ18F0047 | 336413 | THE CONTRACTOR SHALL PROVIDE, INTEGRATE, AND DELIVER CMWS PARTS IN ACCORDANCE WITH (IAW) GOVERNMENT FUNISHED DRAWINGS LISTED IN PARAGRAPH 4 AND QUANTITIES LISTED IN APPENDIX C. | $2.4M |
| Aug 15, 2018 | Department of DefenseW6QK ACC-RSA | 0722 | 336413 | IGF::OT::IGF THIS SOW DEFINES THE EFFORT REQUIRED TO PROVIDE THIRTY (30) PATRIOT DUAL TELEMETRY KITS. | $1.6M |
| Aug 15, 2018 | Department of DefenseW6QK ACC-RSA | W58RGZ18F0086 | 336413 | THE UNITED STATES MARINE CORPS (USMC) HAS A REQUIREMENT TO INSPECT THE CLEVISES AND REMOVE/REPLACE THE ELEVATION PIVOT BOLTS ON THE ENTIRE FLEET OF HIGH MOBILITY ARTILLERY ROCKET SYSTEMS (HIMARS) VEHICLES. IN THE FALL OF 2014, CRACKS WERE DISCOVERED ON THREE ARMY LAUNCHERS. AN INVESTIGATION LED BY PRECISION FIRES ROCKET AND MISSILE SYSTEMS (PFRMS) WAS CONDUCTED THROUGH THE REMAINDER OF 2014 AND INTO 2015. THE INVESTIGATION TEAM INCLUDED THE PROTOTYPE INTEGRATION FACILITY (PIF) AND THE HIMARS MANUFACTURER, LOCKHEED MARTIN. THE ROOT CAUSE OF THE CRACKING WAS DETERMINED AND A PIF DESIGN MODIFICATION TO THE PIVOT BOLT IS BEING IMPLEMENTED TO CORRECT THE ISSUE. THE PIF HAS BEEN ASKED TO INSPECT AND RETROFIT THE USMC LAUNCHER FLEET. | $569K |
| Aug 15, 2018 | Department of DefenseW6QK ACC-RSA | W58RGZ18F0087 | 336413 | THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORTS FOR THE CONTRACTOR TO PROVIDE TECHNICAL AND ENGINEERING SUPPORT OF THREE (3) LOWER TIER PROJECT OFFICE PATRIOT LAUNCHER STATIONS, ONE (1) VIRTUAL LAUNCHER STATION; ASSIST IN DEVELOPING AND MAINTAINING THREAT SIMULATION MODELING FOR THE PATRIOT SIMULATION COMMUNITY; PROVIDE TECHNICAL SUPPORT FOR LAUNCHER STATION TEST SET (LSTS) ETHERNET INTERFACE; AND SUPPORT MODIFICATIONS AND TEST TO PATRIOT FIELDING EQUIPMENT. | $125K |
| Aug 15, 2018 | Department of DefenseW6QK ACC-RSA | 0684 | 336413 | THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO BUILD/FABRICATE, INTEGRATE, KIT AND SHIP H-1 LIGHTING KITS AND SPARES. THE CURRENT UH-1Y AND AH-1Z HELICOPTERS REQUIRE AN UPGRADE TO THE EXTERNAL LIGHTING SYSTEM. THE UPGRADED LIGHTING SYSTEM WILL ADD DUAL-FUNCTION VISIBLE/INFRA-RED (IR) LIGHT EMITTING DIODE (LED) ANTI-COLLISION, BLADE-TIP, POSITION LIGHTS AND UPDATE THE LIGHTING CONTROL PANEL TO ENSURE SELECTABLE INTENSITIES AND CONCURRENT IR/OVERT SELECTION ARE AVAILABLE. | $7.8M |
| Aug 14, 2018 | Department of DefenseW6QK ACC-RSA | 0700 | 336413 | SOW:HH-60L CONVERSION WINDOW KITS THE STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO PROVIDE UTILITY HELICOPTERS PROJECT OFFICE (UHPO) CONVERSION CREW CHIEF WINDOW KITS IN SUPPORT OF HH-60L CONVERSION INTEGRATION EFFO | $663K |
| Aug 14, 2018 | Department of DefenseW6QK ACC-RSA | 0754 | 336413 | PROVIDE CH-47F MODEL SPECIAL TOOLS&TEST EQUIPMENT (STTE) TO SUPPORT THE PERFORMANCE AND MAINTENANCE OF THIS AIRCRAFT FOR TURKISH ARMY FIELD OPERATIONS. | $917K |
| Aug 14, 2018 | Department of DefenseW6QK ACC-RSA | W58RGZ18F0044 | 336413 | THE PURPOSE OF THIS STATEMENT OF WORK (SOW) IS TO DEFINE THE EFFORT REQUIRED TO OBTAIN AN AIRWORTHINESS RELEASE (AWR) FOR THE UNITED STATES CUSTOMS AND BORDER PROTECTION (CBP) H-60 AIRCRAFT FLEET MODIFIED WITH AN AUTOMATIC DEPENDENT SURVEILLANCE-BROADCAST (ADS-B) OUT SOLUTION. | $2.0M |
| Aug 14, 2018 | Department of DefenseW6QK ACC-RSA | 0625 | 336413 | IGF::OT::IGF V-22 OSPREY MISSION COMPUTER OBSOLESCENCE THIS EFFORT IS REQUIRED TO SUPPORT PMA-275 FOR THE PROCUREMENT, MANUFACTURING, INTEGRATION, KITTING, DELIVERY, AND INSTALLATION OF MISSION COMPUTER OBSOLESCENCE INITIATIVE (MCOI) RETROFIT KITS AND COMMON AIRCRAFT PORTABLE REPROGRAMMING EQUIPMENT (CAPRE) GBE FILLPORT KITS. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS. | $3.5M |
| Aug 14, 2018 | Department of DefenseW6QK ACC-RSA | 0727 | 336413 | THIS SOW DEFINES THE EFFORT REQUIRED FOR THE NON-RECURRING ENGINEERING (NRE), FABRICATION, ASSEMBLY, AND KITTING OF 225 CH-47F AN/AVR-2B A-KITS | $1.1M |
| Aug 13, 2018 | Department of DefenseW6QK ACC-RSA | W58RGZ18F0026 | 336413 | THIS SOW DEFINES THE EFFORT REQUIRED TO PROVIDE 100 H-60M OUTBOARD STABILATOR BUSHING INSERTER AND REMOVER SETS. | $764K |
| Aug 13, 2018 | Department of DefenseW6QK ACC-RSA | W58RGZ18F0051 | 336413 | THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO PROVIDE TEST ASSETS FOR AMRDEC SECURITY INITIATIVES. | $649K |
Get Alerted Before Redstone Defense Systems's Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free