DateAgencyPIIDNAICSDescriptionAmount
Aug 13, 2018Department of DefenseW6QK ACC-RSA0725336413IGF::OT::IGF NEW ORDER 0725 IN ACCORDANCE WITH THE SOW, DATED 19 SEPTEMBER 2017, THE PROTOTYPE INTEGRATION FACILITY (PIF) DEFINES THE REQUIREMENT TO PROVIDE FORTY-FIVE (45) AURS MK112 MOD2S IN ACCORDANCE WITH (IAW) DRAWING NUMBER 8242774 AND FORTY-FIVE (45) AURS MK112 MOD2S CA 717 CABLE ASSEMBLIES IAW DRAWING NUMBER 5408717. THE CONTRACTOR SHALL PROVIDE AN ADDITIONAL THIRTY-SIX (36) AURS MK112 MOD2S IN ACCORDANCE WITH (IAW) DRAWING NUMBER 8242774. THE CONTRACTOR SHALL PROVIDE EIGHT (8) DLBCS IN ACCORDANCE WITH (IAW) DRAWING NUMBER 7615651 AND THREE (3) VPT CABLES IAW DRAWING NUMBER 8242800. THE CONTRACTOR SHALL PERFORM PRODUCT VERIFICATION INSPECTIONS AND PREPARE PRODUCT VERIFICATION INSPECTION REPORTS FOR ALL CONFIGURATION ITEMS IAW DI-MISC-80508/T.$1.7M
Aug 13, 2018Department of DefenseW6QK ACC-RSA0755336413THIS STATEMENT OF WORK (SOW) ADDRESSES THE REQUIREMENTS FOR THE PATRIOT ADVANCED CAPABILITY-3 (PAC-3) MISSILE SEGMENT ENHANCEMENT (MSE) ROUND TRAINER AND PATRIOT T-BOXES. THE CONTRACTOR SHALL BASELINE THE TOOLING RATE ASSEMBLY TECHNICAL DATA PACKAGE (TDP).$20M
Aug 10, 2018Department of DefenseW6QK ACC-RSAW58RGZ18F0058336413THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO SUPPORT NAVAIR PMA-275 FOR THE PROVISION, KITTING, AND DELIVERY OF MULTIPLE V-22 IRIDIUM SATELLITE PHONE ANTENNA KITS. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS.$55K
Aug 10, 2018Department of DefenseW6QK ACC-RSA0774336413THE PROTOTYPE INTEGRATION FACILITY (PIF) HAS A REQUIREMENT IN SUPPORT OF THE LITTORAL COMBAT SHIP (LCS) PROGRAM EXECUTIVE OFFICE (PEO) FOR THE PROCUREMENT OF ROLL-ON/ROLL-OF (RO/RO) CONTAINERS TO SUPPORT UH-60 SEAHAWK EMPLOYMENTS ON THE LCS.$1.7M
Aug 9, 2018Department of DefenseW6QK ACC-RSAW58RGZ18F0045336413THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED FOR THE REPAIR, REFURBISHMENT, FABRICATION, INTEGRATION, TECHNICAL AND FIELD SUPPORT TO THE LOWER TIER PROJECT OFFICE (LTPO) AND LETTERKENNY ARMY DEPOT (LEAD). BOTH LTPO AND LEAD REQUIRE UPGRADES TO PATRIOT RELATED HARDWARE AND TESTING STATIONS. IN ADDITION, FIELD SUPPORT IS REQUIRED TO UPDATE CURRENTLY FIELDED ASSETS.$2.2M
Aug 9, 2018Department of DefenseW6QK ACC-RSA0744336413PROVIDE AVIATION GROUND SUPPORT EQUIPMENT (AGSE) IDENTIFIED IN APPENDIX C IN SUPPORT OF FOREIGN MILITARY SALES (FMS) CASES TURKEY (TK-B-VCQ), SOUTH KOREA (KS-B-ZDF, KS-B-ZCF), AND CROATIA (HR-B-IAB).$7.3M
Aug 8, 2018Department of DefenseW6QK ACC-RSA0758336413THE PURPOSE OF THIS STATEMENT OF WORK (SOW) IS TO DEFINE THE EFFORT REQUIRED TO PROVIDE SAUDI FMS CASE SR-B-ZAD WITH A FIELDING SUPPORT PACKAGE. THE FIELDING SUPPORT PACKAGE SHALL CONSIST OF UH-60M DEPLOYMENT SUPPORT KIT (MDSK), FAST ROPE INSERTION EXTRACTION SYSTEM(FRIES), BLADE FOLD KITS, AIR TRANSPORT KITS, AND TOW BRIDLE KITS.$1.4M
Aug 8, 2018Department of DefenseW6QK ACC-RSA0444336413IGF::OT::IGF MC-130J DEFENSIVE SYSTEM UPGRADE$169K
Aug 8, 2018Department of DefenseW6QK ACC ANAD0012336992TALON IV LOGISTICS MANAGEMENT INFO AWARD$318K
Aug 7, 2018Department of DefenseW6QK ACC-RSA0058336413NOT TO EXCEED ORDER FOR RECOVERY OF AIRBASE DENIED BY ORDNANCE IN SUPPORT OF THE AIR FORCE$205K
Aug 7, 2018Department of DefenseW6QK ACC-RSA0677336413IGF::OT::IGF THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO SUPPORT THE REPAIR OF THE ARC-231 MULTI-MODE AVIATION RADIO REPAIR PROGRAM FOR THE RECEIVER, TRANSMITTER (RT), RT-1808A FOR LUH. THIS EFFORT INCLUDES A BASE EFFORT AND ONE (1) OPTION.$599K
Aug 3, 2018Department of DefenseW6QK ACC-RSA0771336413THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO PROVIDE AIRCRAFT WIRE HARNESSES FOR THE MH-65 DOLPHIN IMPROVEMENT PROGRAM. THE U.S. COAST GUARD (USCG) AVIATION LOGISTICS CENTER (ALC) HAS A REQUIREMENT TO FABRICATE AIRCRAFT WIRE HARNESSES FOR THE MH-65 DOLPHIN SHORT RANGE RECOVERY AIRCRAFT. THE REQUIREMENT WILL BE TO PROVIDE ENGINEERING, DESIGN, AND FABRICATION SUPPORT FOR THE ALC MH-65 IMPROVEMENT AND MODERNIZATION EFFORTS$2.0M
Aug 1, 2018Department of DefenseW6QK ACC-RSA0741336413THIS SOW DEFINES THE EFFORT REQUIRED TO PROVIDE 60 KVA GENERATOR KITS IAW DRAWING NUMBER 1071704.$16M
Aug 1, 2018Department of DefenseW6QK ACC-RSA0549336413IGF::OT::IGF NEW TASK ORDER$375K
Jul 31, 2018Department of DefenseW6QK ACC-RSA0637336413IGF::OT::IGF THE SCOPE OF THIS STATEMENT OF WORK (SOW) DEFINES THE PERSONNEL, MATERIALS,, AND SERVICES REQUIRED TO MODIFY, VERIFY, DOCUMENT, AND DELIVER FOUR UH-60M AIRCRAFT IN TWO UNIQUE SLOVAK REPUBLIC CONFIGURATIONS.$3.3M
Jul 25, 2018Department of DefenseW6QK ACC-RSA0682336413"PROVIDE FMS TWINAX TOOL KITS. THE KITS WILL BE USED TO SUPPORT CRITICAL GROUND MAINTENANCE TASKS."$118K
Jul 25, 2018Department of DefenseW6QK ACC-RSA0762336413THE PURPOSE OF THIS STATEMENT OF WORK (SOW) IS TO DEFINE THE EFFORT FOR THE PROCUREMENT, FABRICATION, KITTING, AND TECHNICAL DOCUMENTATION FOR THE H-60 UNIVERSAL AIR TRANSPORTABILITY KIT (UATK).$1.4M
Jul 25, 2018Department of DefenseW6QK ACC-RSA0760336413THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED FOR THE CONTRACTOR TO PROVIDE, DESIGN, DEVELOP, INTEGRATE, AND DELIVER MODELED FIRE CONTROL RADAR TRAINING DEVICES THAT WILL MEET TRAINING SHORTCOMINGS. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS.$1.2M
Jul 24, 2018Department of DefenseW6QK ACC-RSA0763336413THIS SOW DEFINES THE EFFORT REQUIRED TO PROVIDE H-60M TAIL LIGHT SWITCH KITS IAW DRAWING NUMBERS 1078891-101 AND 1078891-103.$1.2M
Jul 23, 2018Department of DefenseW6QK ACC-RSA0757336413THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED FOR INSTALLATION OF REMOTE WEAPON SYSTEM (RWS) OPERATOR WORKSTATIONS AND DELTA-KITS ONTO COUGAR MINE RESISTANT AMBUSH PROTECTED (MRAP) VEHICLES. INCLUDED ARE THE INTEGRATION AND ASSOCIATED PROGRAM MANAGEMENT SUPPORT REQUIREMENTS.$717K
Jul 23, 2018Department of DefenseW6QK ACC-RSA0659336413IGF::OT::IGF ORDER 0659 THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED FOR THE MANAGEMENT, PROCUREMENT, TESTING AND INTEGRATION OF THE AERIAL RECONNAISSANCE WEATHER OFFICER (ARWO) COMPUTER ON WC-130J AIRCRAFT AND AT FIXED GROUND BASED STATIONS (GBS). INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND AIRCRAFT INTEGRATION SUPPORT PLANNING REQUIREMENTS.$733K
Jul 19, 2018Department of DefenseW6QK ACC-RSA0622336413IGF::OT::IGF ORDER 0622 THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED FOR THE PROTOTYPE INTEGRATION FACILITY TO PROVIDE TECHNICAL AND ENGINEERING SUPPORT TO THE PRECISION FIRES ROCKET AND MISSILE SYSTEMS (PFRMS) PROJECT OFFICE CONCERNING HUMAN FACTORS AND ERGONOMICS (HFE) ISSUES FOR THE M270A1 IMPROVED ARMORED CAB (IAC) PROGRAM. THE M270A1 IAC IS DESIGNED TO INCREASE CREW SURVIVABILITY AGAINST IMPROVISED EXPLOSIVE DEVICES (IEDS), ARTILLERY FRAGMENTATION AND SMALL ARMS FIRE. IAC UPGRADES HAVE INVOLVED NUMEROUS DESIGN CHANGES TO THE M270A1 CAB AND IN SOME CASES HAVE CAUSED HFE.$596K
Jul 19, 2018Department of DefenseW6QK ACC-RSA0737336413THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO PROVIDE APACHE SUPPORT KITS FOR FOREIGN MILITARY SALE (FMS) SAUDI MINISTRY OF NATIONAL GUARD CUSTOMER. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS.$6.0M
Jul 18, 2018Department of DefenseW6QK ACC-RSA0654336413IGF::OT::IGF THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO PROVIDE AH-64E APR-39 DV2 A-KITS. THE APR-39 DV2 RADAR WARNING RECEIVER (RWR)/ELECTRONIC WARFARE MANAGEMENT SYSTEM (EWMS) IS BEING DESIGNED TO MAXIMIZE SURVIVABILITY BY IMPROVING AIRCREW SITUATIONAL AWARENESS VIA INTERACTIVE MANAGEMENT OF ALL ONBOARD SENSORS AND COUNTERMEASURES. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS. THE APR-39 DV2 IS CURRENTLY IN THE DEVELOPMENT PHASE. THE CONTRACTOR SHALL PROVIDE, KIT AND SHIP TWENTY-EIGHT (28) AH-64E APR-39 DV2 A-KITS IN ACCORDANCE WITH (IAW) THE GOVERNMENT FURNISHED PRELIMINARY TDP. THE CONTRACTOR SHALL PROVIDE TWENTY-EIGHT (28) COCKPIT UTILITY RELAY BOXES (PN 7-611B25001-107). THE CONTRACTOR SHALL PROVIDE FIVE (5) TOOL SETS IAW THE GOVERNMENT FURNISHED PRELIMINARY TDP.$3.6M
Jul 12, 2018Department of DefenseW6QK ACC-RSA0733336413SOW: FUTURE LAUNCHER DEMONSTRATION UNITS THIS STATEMENT OF WORK (SOW) IDENTIFIES REQUIREMENTS TO BE ACCOMPLISHED BY THE CONTRACTOR IN SUPPORT OF THE PROTOTYPE INTEGRATION FACILITY (PIF) FUTURE LAUNCHER DEMONSTRATION UNITS DEVELOPMENT. THE FUTURE LAUNCHER IS A PALLETIZED LAUNCHER CAPABLE OF FIRING THE MULTIPLE LAUNCH ROCKET SYSTEM (MLRS) FAMILY OF MUNITIONS (MFOM), TWO (2) PODS LOAD OUT, WITH AZIMUTH AND ELEVATION CAPABILITY. THE DRAWING PACKAGE FOR THE FUTURE LAUNCHER DEMONSTRATION UNITS IS UNDER DEVELOPMENT BY THE GOVERNMENT AND WILL BE PROVIDED TO THE CONTRACTOR. THE LAUNCHER DESIGN WILL BE BASED ON THE FUTURE LAUNCHER INTEGRATION TEST UNITS DESIGN, TWO OF WHICH WERE FABRICATED UNDER TASK ORDER 0649 OF THIS CONTRACT, BUT WILL HAVE SIGNIFICANT DIFFERENCES IN FORM, FIT, AND FUNCTION. TWO M270 TURRET GEAR BEARINGS WILL BE PROVIDED TO THE CONTRACTOR FOR RE-UTILIZATION IN ORDER TO REDUCE COST AND SCHEDULE RISK. ACTIVITIES INCLUDE DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TEST, AND CHECKOUT OF MECHANICAL AND ELECTRICAL COMPONENTS ASSOCIATED WITH THE DEVELOPMENT OF TWO FUTURE LAUNCHER DEMONSTRATION UNITS WHICH WILL FACILITATE TESTING OF FUTURE LAUNCHER FUNCTIONALITY$3.0M
Jul 11, 2018Department of DefenseW6QK ACC-RSA0773336413THE CONTRACTOR SHALL PROVIDE 45 FANS INSTALLATION KITS IN ACCORDANCE WITH (IAW) THE GOVERNMENT FURNISHED DRAWINGS PACKAGE 1068784. INSTALLATION KITS SHALL CONTAIN A-KIT, AND THE B-KITS SHALL BE DELIVERED SEPARATELY. TWENTY KITS (20) SHALL BE DELIVERED NO LATER THAN NOVEMBER 2018, AND TWENTY-FIVE (25) KITS NO LATER THAN FEBRUARY 2019. THE CONTRACTOR SHALL PROVIDE THREE (3) NAVIGATIONAL DATABASE LOADERS. THE CONTRACTOR SHALL PROVIDE TWO (2) YEARS OF MONTHLY NAVIGATIONAL DATABASE UPDATES FOR EACH FANS B-KIT DELIVERED AS PART OF THIS EFFORT. THE DATABASE UPDATES SHALL BE ACTIVATED UPON INSTALLATION INTO THE AIRCRAFT.$4.2M
Jul 5, 2018Department of DefenseW6QK ACC-RSA0726336413SUPPORT THE INTERNATIONAL APACHE OFFICE - ISRAEL WITH AH-64D MAINTENANCE PROVISIONING REQUIREMENTS. THIS SOW DEFINES THE EFFORT REQUIRED FOR THE PROCUREMENT, INTEGRATION, KITTING, DELIVERY, AND INSTALLATION FOR THE MODIFICATION OF THE AH-64D MODERNIZED SIGNAL PROCESSOR UNIT (MSPU) PROGRAM. ADDITIONALLY, THE CONTRACTOR WILL VERIFY THE MSPU KIT CONFIGURATIONS, TECHNICAL DATA PACKAGES, DEVELOPMENT /SUSTAINMENT OF MODIFICATION WORK ORDER (MWO) AND OTHER SUPPORT DOCUMENTS FOR INSTALLATION ACTIVITIES.$980K
Jul 5, 2018Department of DefenseW6QK ACC-RSA0767336413THIS STATEMENT OF WORK SOW DEFINES THE EFFORT REQUIRED FOR THE PROGRAM MANAGEMENT, DEVELOPMENT, LOGISTICAL PLANNING, ACQUIRING HARDWARE, KITTING, DOCUMENTATION, DESIGN, INTEGRATION, SYSTEM INTEGRATION, STORAGE, TRANSPORTATION, FIELDING, PROVISIONING, AND PROVIDING TECHNICAL DATA ASSOCIATED WITH PROVISIONING OF THE UNMANNED AIR SYSTEMS GENERAL MECHANICS TOOL KIT UGMTK. THE UGMK WILL BE ADDED TO THE CATS FAMILY OF TOOL KITS.$5.1M
Jul 3, 2018Department of DefenseW6QK ACC-RSA0764336413THIS SOW DEFINES THE EFFORT REQUIRED TO PROVIDE SIXTEEN (16) CENTER CELL ACCESS PORT (CCAP), AND AN OPTION FOR AN ADDITIONAL TWENTY (20) CENTER CELL ACCESS PORT (CCAP).$4.2M
Jul 2, 2018Department of DefenseW6QK ACC-RSA0759336413APPLICABLE TOP LEVEL DOCUMENTS ARE CONTAINED IN THE DOCUMENT SUMMARY LIST (DSL), ATTACHMENT A. THE DOCUMENT VERSIONS SPECIFIED ON THE DSL TAKE PRECEDENCE OVER THE GENERIC REFERENCES (WITHOUT REVISION LETTERS) CITED IN THE SOW.$717K
Jul 2, 2018Department of DefenseW6QK ACC-RSA0755336413THIS STATEMENT OF WORK (SOW) ADDRESSES THE REQUIREMENTS FOR THE PATRIOT ADVANCED CAPABILITY-3 (PAC-3) MISSILE SEGMENT ENHANCEMENT (MSE) ROUND TRAINER AND PATRIOT T-BOXES. THE CONTRACTOR SHALL BASELINE THE TOOLING RATE ASSEMBLY TECHNICAL DATA PACKAGE (TDP).$8.4M
Jul 2, 2018Department of DefenseW6QK ACC-RSA0451336413IGF::OT::IGF MODIFICATION OF TWO (2) UH-60M AIRCRAFT WITH UNIQUE MISSION EQUIPMENT FOR THE U.S. FEDERAL BUREAU OF INVESTIGATIONS (FBI).$119K
Jul 2, 2018Department of DefenseW6QK ACC-RSA0652336413US ARMY UC31 CURRENT UTILIZE THE UNIVERSITY UNS-1ESPEW WHITE MANAGEMENT SYSTEM AND MULTIPLE AVA COMPONTS THROUGH THE AIRSPACE TO MEET ARMY TRANSPORT REQUIREMENTS. PURPOSE OF THE EFFECT IS TO ADSB OUT OPERATIONS$7.3M
Jun 29, 2018Department of DefenseW6QK ACC-RSA0658336413IGF::OT::IGF, TO 658, OEP 19288, "PROVIDE AVIATION GROUND SUPPORT EQUIPMENT (AGSE) IN SUPPORT OF FOREIGN MILITARY SALES (FMS) CASES LO-B-UCI AND KS-B-ZCV FOR SLOVAKIA AND KOREA."$87K
Jun 28, 2018Department of DefenseW6QK ACC-RSA0719336413IGF::OT::IGF NEW TO THE CONTRACTOR SHALL NOTIFY THE IPT OF ALL PMI-1 MAINTENANCE, SERVICE BULLETINS, AND TECHNICAL DIRECTIVES REQUIRED DURING AIRCRAFT MAINTENANCE/MODIFICATION. THE CONTRACTOR SHALL PERFORM AIRCRAFT MODERNIZATION AND ANY NEW TECHNICAL DIRECTIVE AS CALLED OUT IN PLANNED MAINTENANCE INTERVAL (PMI) REQUIREMENTS SPECIFICATION, DATED 15 JUNE 2016, WHEN AUTHORIZED IN WRITING BY THE PIF COR. THE CONTRACTOR SHALL NOTIFY THE PIF COR OF ALL REPAIRS, UPGRADE, TEST AND MAINTENANCE FLIGHTS REQUIRED BY MAINTENANCE PROCEDURES, SERVICE BULLETINS, OR AIRWORTHINESS DIRECTIVES. THE GOVERNMENT WILL PROVIDE PILOTS FOR FLIGHTS AS NEEDED. THE CONTRACTOR SHALL PROVIDE GROUND SUPPORT FOR ALL FLIGHTS. FUNDING FOR SCHEDULED MAINTENANCE, SERVICE BULLETINS, AIRWORTHINESS DIRECTIVES, AND GROUND FLIGHT SUPPORT SHALL BE TRACKED AS A SEPARATE WBS ON THE COST REPORT. AIRCRAFT DISCREPANCIES, DEFECTS, AND AIRCRAFT SYSTEM FAILURES DISCOVERED DURING THE PMI EVENT (BUT NOT PART OF A SPECIFIC PMI INSPECTION REQUIREMENT) SHALL BE IDENTIFIED BY THE CONTRACTOR AND REPORTED AS AN EXAMINER AND EVALUATOR DISCREPANCY REPORT IAW DI-MISC-80508B-2. THE CONTRACTOR SHALL PREPARE THIS REPORT FOR DISCREPANCY CLASSIFICATION (IN-SERVICE REPAIR, O-LEVEL, OR UNSCHEDULED COMPONENT REPAIR), DEFECT CLASSIFICATION (CRITICAL, MAJOR, MINOR, AND NOTED BUT NOT CORRECTED [NBNC]), AND TASK RESOLUTION. THE CONTRACTOR SHALL NOTIFY THE GOVERNMENT UPON BECOMING AWARE OF ANY ISSUE WITH THE TYPE, AREA, AND NATURE OF DISCREPANCY AND DEFECT. THE CONTRACTOR SHALL PROVIDE A PROPOSED RESOLUTION TO THE GOVERNMENT, BUT SHALL NOT EXECUTE ANY REPAIRS, MAINTENANCE, OR CHANGES UNTIL RECEIPT OF THE WRITTEN APPROVAL OF THE PIF COR. THE CONTRACTOR SHALL NOTIFY THE PIF COR OF ALL TEST AND MAINTENANCE FLIGHTS REQUIRED BY MAINTENANCE PROCEDURES. THE GOVERNMENT WILL PROVIDE PILOTS FOR FLIGHTS AS NEEDED. THE CONTRACTOR SHALL PROVIDE GROUND SUPPORT FOR ALL FLIGHTS. FUNDING FOR UNSCHEDULED MAINTENANCE SHALL BE TRACKED AS A SEPARATE WBS ON THE COST REPORT.$142K
Jun 19, 2018Department of DefenseW6QK ACC-RSA0556336413IGF::OT::IGF NAVO REMUS AUV SUPPORT$100K
Jun 14, 2018Department of DefenseW6QK ACC-RSA0733336413SOW: FUTURE LAUNCHER DEMONSTRATION UNITS THIS STATEMENT OF WORK (SOW) IDENTIFIES REQUIREMENTS TO BE ACCOMPLISHED BY THE CONTRACTOR IN SUPPORT OF THE PROTOTYPE INTEGRATION FACILITY (PIF) FUTURE LAUNCHER DEMONSTRATION UNITS DEVELOPMENT. THE FUTURE LAUNCHER IS A PALLETIZED LAUNCHER CAPABLE OF FIRING THE MULTIPLE LAUNCH ROCKET SYSTEM (MLRS) FAMILY OF MUNITIONS (MFOM), TWO (2) PODS LOAD OUT, WITH AZIMUTH AND ELEVATION CAPABILITY. THE DRAWING PACKAGE FOR THE FUTURE LAUNCHER DEMONSTRATION UNITS IS UNDER DEVELOPMENT BY THE GOVERNMENT AND WILL BE PROVIDED TO THE CONTRACTOR. THE LAUNCHER DESIGN WILL BE BASED ON THE FUTURE LAUNCHER INTEGRATION TEST UNITS DESIGN, TWO OF WHICH WERE FABRICATED UNDER TASK ORDER 0649 OF THIS CONTRACT, BUT WILL HAVE SIGNIFICANT DIFFERENCES IN FORM, FIT, AND FUNCTION. TWO M270 TURRET GEAR BEARINGS WILL BE PROVIDED TO THE CONTRACTOR FOR RE-UTILIZATION IN ORDER TO REDUCE COST AND SCHEDULE RISK. ACTIVITIES INCLUDE DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TEST, AND CHECKOUT OF MECHANICAL AND ELECTRICAL COMPONENTS ASSOCIATED WITH THE DEVELOPMENT OF TWO FUTURE LAUNCHER DEMONSTRATION UNITS WHICH WILL FACILITATE TESTING OF FUTURE LAUNCHER FUNCTIONALITY$900K
Jun 5, 2018Department of DefenseW6QK ACC-RSA0315336413IGF::OT::IGF INTEGRATION/QUALIFICATION FOR THE H-60L DIGITAL COCKPIT UPGRADE KIT, W58RGZ-12-D-0089, TASK ORDER 0315 (ORDER EXECUTION PLAN 16231) .$6.0M
Jun 5, 2018Department of DefenseW6QK ACC-RSA0342336413IGF::OT::IGF MULTI MISSION LAUNCHER ORDER 0342/OEP 16413$2.0M
May 22, 2018Department of DefenseW6QK ACC-RSA0315336413IGF::OT::IGF INTEGRATION/QUALIFICATION FOR THE H-60L DIGITAL COCKPIT UPGRADE KIT, W58RGZ-12-D-0089, TASK ORDER 0315 (ORDER EXECUTION PLAN 16231) .$366K
May 22, 2018Department of DefenseW6QK ACC-RSA0315336413IGF::OT::IGF INTEGRATION/QUALIFICATION FOR THE H-60L DIGITAL COCKPIT UPGRADE KIT, W58RGZ-12-D-0089, TASK ORDER 0315 (ORDER EXECUTION PLAN 16231) .$4.1M
May 22, 2018Department of DefenseW6QK ACC-RSA0753336413AVIATION GROUND SUPPORT EQUIPMENT (AGSE) IDENTIFIED IN APPENDIX C IN SUPPORT OF AFGHAN FOREIGN MILITARY SALES (FMS) CASE W5-B-UAQ.$9.4M
May 22, 2018Department of DefenseW6QK ACC-RSA0769336413THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO OBTAIN TECHNICAL, OPERATIONAL, AND LOGISTICAL SUPPORT AND ASSISTANCE TO INTEGRATE A MODERN SATELLITE COMMUNICATIONS (SATCOM) SYSTEM INTO US MARINE CORPS M142 HIGH MOBILITY ARTILLERY ROCKET SYSTEM (HIMARS) LAUNCHERS.$235K
May 22, 2018Department of DefenseW6QK ACC-RSA0756336413THE PROTOTYPE INTEGRATION FACILITY (PIF) HAS A REQUIREMENT TO BUILD AND INTEGRATE AUTONOMOUS UNDERWATER VEHICLE (AUV) SYSTEM COMPONENTS TO SUPPORT THE RESEARCH AND DEVELOPMENT OF A NEXT GENERATION AUV SYSTEM.$53K
May 22, 2018Department of DefenseW6QK ACC-RSA0730336413THIS STATEMENT OF WORK (SOW) DEFINES THE REQUIREMENT FOR VERIFICATION INSTALLATION OF APACHE AH-64E SOLDIER RADIO WAVEFORM (SRW) MODIFICATION WORK ORDER (MWO). THE CONTRACTOR WILL VERIFY THE GOVERNMENT FURNISHED EQUIPMENT (GFE) KIT CONFIGURATIONS, TECHNICAL DATA PACKAGES, DEVELOPMENT/SUSTAINMENT OF MODIFICATION WORK ORDER (MWO) AND OTHER SUPPORT DOCUMENTS FOR INSTALLATION ACTIVITIES. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS.$200K
May 22, 2018Department of DefenseW6QK ACC-RSA0728336413BASE EFFORT THE CONTRACTOR SHALL DE-MODIFY THE FOLLOWING EQUIPMENT FROM FOUR EACH HH-60L AIRCRAFT IN ACCORDANCE WITH THE APPLICABLE TECHNICAL MANUALS OR DRAWINGS. THE CONTRACTOR SHALL PROVIDE ONE EACH A-KIT FOR EACH OF THE FOUR AIRCRAFT IN THE TABLE LISTED BELOW. THE CONTRACTOR SHALL INSTALL THE FOLLOWING MODIFICATIONS ON THE FOUR EACH HH-60L AIRCRAFT IN ORDER TO BRING THEM INTO A MODIFIED HH-60L CONFIGURATION. THE GOVERNMENT ANTICIPATES OVERTIME WILL BE REQUIRED TO SUPPORT INTEGRATION ACTIVITIES. MODIFICATIONS SHALL BE PERFORMED IAW THE APPLICABLE TECHNICAL MANUALS OR DRAWINGS. THE CONTRACTOR SHALL MAKE ANY NECESSARY DESIGN CHANGES TO THE A-KITS PROVIDED AS GOVERNMENT FURNISHED EQUIPMENT IN ORDER TO ACHIEVE FORM, FIT, AND FUNCTION ON THE FOUR AIRCRAFT. THE CONTRACTOR SHALL PROVIDE OR REWORK THE NECESSARY A-KIT PARTS IAW THE REDLINED OR MODIFIED DRAWINGS AND INSTALL A-KIT PARTS IAW THE REDLINED OR MODIFIED INSTALLATION DRAWINGS. OPTION 1 THE CONTRACTOR SHALL DE-MODIFY THE FOLLOWING EQUIPMENT FROM TWO EACH HH-60L AIRCRAFT IN ACCORDANCE WITH THE APPLICABLE TECHNICAL MANUALS OR DRAWINGS LISTED. THE CONTRACTOR SHALL PROVIDE ONE EACH A-KIT FOR EACH OF THE TWO AIRCRAFT IN THE TABLE LISTED BELOW. THE CONTRACTOR SHALL INSTALL THE FOLLOWING MODIFICATIONS ON THE TWO EACH HH-60L AIRCRAFT IN ORDER TO BRING THEM INTO A MODIFIED HH-60L CONFIGURATION IAW THE APPLICABLE TECHNICAL MANUALS OR DRAWINGS. OPTION 2 THE CONTRACTOR SHALL DE-MODIFY THE FOLLOWING EQUIPMENT FROM TWO EACH HH-60L AIRCRAFT IN ACCORDANCE WITH THE APPLICABLE TECHNICAL MANUALS OR DRAWINGS LISTED. THE CONTRACTOR SHALL PROVIDE ONE EACH A-KIT FOR EACH OF THE TWO AIRCRAFT IN THE TABLE LISTED BELOW. THE CONTRACTOR SHALL INSTALL THE FOLLOWING MODIFICATIONS ON THE TWO EACH HH-60L AIRCRAFT IN ORDER TO BRING THEM INTO A MODIFIED HH-60L CONFIGURATION IAW THE APPLICABLE TECHNICAL MANUALS OR DRAWINGS.$5.2M
May 22, 2018Department of DefenseW6QK ACC-RSA0739336413THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED FOR THE PROCUREMENT, MANUFACTURING, INTEGRATION, PROVISIONING, KITTING, AND DELIVERY OF MULTIPLE APACHE MISSION ESSENTIAL PACKAGES (MEPS), MODIFICATION KITS AND APACHE PARTS.$14M
May 22, 2018Department of DefenseW6QK ACC-RSA0652336413US ARMY UC31 CURRENT UTILIZE THE UNIVERSITY UNS-1ESPEW WHITE MANAGEMENT SYSTEM AND MULTIPLE AVA COMPONTS THROUGH THE AIRSPACE TO MEET ARMY TRANSPORT REQUIREMENTS. PURPOSE OF THE EFFECT IS TO ADSB OUT OPERATIONS$1.8M
May 21, 2018Department of DefenseW6QK ACC-RSA0719336413IGF::OT::IGF NEW TO THE CONTRACTOR SHALL NOTIFY THE IPT OF ALL PMI-1 MAINTENANCE, SERVICE BULLETINS, AND TECHNICAL DIRECTIVES REQUIRED DURING AIRCRAFT MAINTENANCE/MODIFICATION. THE CONTRACTOR SHALL PERFORM AIRCRAFT MODERNIZATION AND ANY NEW TECHNICAL DIRECTIVE AS CALLED OUT IN PLANNED MAINTENANCE INTERVAL (PMI) REQUIREMENTS SPECIFICATION, DATED 15 JUNE 2016, WHEN AUTHORIZED IN WRITING BY THE PIF COR. THE CONTRACTOR SHALL NOTIFY THE PIF COR OF ALL REPAIRS, UPGRADE, TEST AND MAINTENANCE FLIGHTS REQUIRED BY MAINTENANCE PROCEDURES, SERVICE BULLETINS, OR AIRWORTHINESS DIRECTIVES. THE GOVERNMENT WILL PROVIDE PILOTS FOR FLIGHTS AS NEEDED. THE CONTRACTOR SHALL PROVIDE GROUND SUPPORT FOR ALL FLIGHTS. FUNDING FOR SCHEDULED MAINTENANCE, SERVICE BULLETINS, AIRWORTHINESS DIRECTIVES, AND GROUND FLIGHT SUPPORT SHALL BE TRACKED AS A SEPARATE WBS ON THE COST REPORT. AIRCRAFT DISCREPANCIES, DEFECTS, AND AIRCRAFT SYSTEM FAILURES DISCOVERED DURING THE PMI EVENT (BUT NOT PART OF A SPECIFIC PMI INSPECTION REQUIREMENT) SHALL BE IDENTIFIED BY THE CONTRACTOR AND REPORTED AS AN EXAMINER AND EVALUATOR DISCREPANCY REPORT IAW DI-MISC-80508B-2. THE CONTRACTOR SHALL PREPARE THIS REPORT FOR DISCREPANCY CLASSIFICATION (IN-SERVICE REPAIR, O-LEVEL, OR UNSCHEDULED COMPONENT REPAIR), DEFECT CLASSIFICATION (CRITICAL, MAJOR, MINOR, AND NOTED BUT NOT CORRECTED [NBNC]), AND TASK RESOLUTION. THE CONTRACTOR SHALL NOTIFY THE GOVERNMENT UPON BECOMING AWARE OF ANY ISSUE WITH THE TYPE, AREA, AND NATURE OF DISCREPANCY AND DEFECT. THE CONTRACTOR SHALL PROVIDE A PROPOSED RESOLUTION TO THE GOVERNMENT, BUT SHALL NOT EXECUTE ANY REPAIRS, MAINTENANCE, OR CHANGES UNTIL RECEIPT OF THE WRITTEN APPROVAL OF THE PIF COR. THE CONTRACTOR SHALL NOTIFY THE PIF COR OF ALL TEST AND MAINTENANCE FLIGHTS REQUIRED BY MAINTENANCE PROCEDURES. THE GOVERNMENT WILL PROVIDE PILOTS FOR FLIGHTS AS NEEDED. THE CONTRACTOR SHALL PROVIDE GROUND SUPPORT FOR ALL FLIGHTS. FUNDING FOR UNSCHEDULED MAINTENANCE SHALL BE TRACKED AS A SEPARATE WBS ON THE COST REPORT.$636K
May 21, 2018Department of DefenseW6QK ACC-RSA0655336413DEVELOPMENT OF THE A-KIT NECESSARY FOR ADAPTING THE COMMON INFRARED COUNTERMEASURE SYSTEM ONTO THE CH-47F ROTARY WING AIRCRAFT WHICH HAVE HAD THE Q-24 SYSTEM INSTALLED AS PART OF A JOINT OPERATIONAL NEEDS STATEMENT (JUONS) EFFORT AND TO ACHIEVE A SAFETY OF FLIGHT (SOF) AIRWORTHINESS RELEASE (AWR) FOR A LIMITED NUMBER OF AIRCRAFT TO BE FIELDED. THE COMMON INFRARED COUNTERMEASURE (CIRCM) SYSTEM WILL REPLACE THE GUARDIAN LASER TRACKER ASSEMBLY (GLTA) FROM THE JUONS MODIFIED AIRCRAFT. IGF::OT::IGF$3.7M