Federal Contractor Profile
Redstone Defense Systems
$912M obligated·660 awards·1 agencies·2 NAICS
Federal Contracts
Showing contracts 401–450 of 621 total. Sorted by action date, most recent first. Excludes $0 modifications.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Nov 28, 2016 | Department of DefenseW6QK ACC-RSA | 0431 | 336413 | IGF::OT::IGF FMS QATAR AND INDONESIA APACHE SUPPORT KITS | $39K |
| Nov 17, 2016 | Department of DefenseW6QK ACC-RSA | 0540 | 336413 | IGF::OT::IGF NEW TASK ORDER FOR UC-35 ENGINE TREND MONITORING SYSTEM (ETMS) REPLACEMENT | $363K |
| Nov 17, 2016 | Department of DefenseW6QK ACC-RSA | 0605 | 336413 | IGF::OT::IGF ORDER 0605 HE EFFORT FOR THE CONTRACTOR TO PROVIDE PATRIOT AIR MISSILE DEFENSE SYSTEM HARDWARE FOR THE FOREIGN MILITARY SALES CUSTOMER OF QATAR. THE GOVERNMENT REQUIRES MANUFACTURING OF PATRIOT HARDWARE FOR THE PATRIOT ENGAGEMENT CONTROL STATION (ECS) AND LAUNCHER STATION (LS). THE PRIMARY GOAL IS TO SUPPORT ARMY AVIATION, MISSILE, DOD AND TECHNOLOGY ACTIVITIES THROUGH THE DEVELOPMENT, FABRICATION, INTEGRATION, TEST AND QUALIFICATION OF TACTICAL AND GROUND SUPPORT SYSTEMS, SUBSYSTEMS AND COMPONENTS. | $2.2M |
| Nov 15, 2016 | Department of DefenseW6QK ACC-RSA | 0315 | 336413 | IGF::OT::IGF INTEGRATION/QUALIFICATION FOR THE H-60L DIGITAL COCKPIT UPGRADE KIT, W58RGZ-12-D-0089, TASK ORDER 0315 (ORDER EXECUTION PLAN 16231) . | $7.3M |
| Nov 14, 2016 | Department of DefenseW6QK ACC-RSA | 0380 | 336413 | WASP | $134K |
| Nov 9, 2016 | Department of DefenseW6QK ACC-RSA | 0570 | 336413 | IGF::OT::IGF:, REQUIREMENT IS FOR THE INSTALLATION OF MULTIPLE MISSION ESSENTIAL KITS AND COMPONENTS FOR THE APACHE AIRCRAFT. | $8.4M |
| Nov 9, 2016 | Department of DefenseW6QK ACC-RSA | 0444 | 336413 | IGF::OT::IGF MC-130J DEFENSIVE SYSTEM UPGRADE | $813K |
| Nov 9, 2016 | Department of DefenseW6QK ACC-RSA | 0434 | 336413 | IGF::OT::IGF INCREMENTALLY FUNDED | $395K |
| Nov 7, 2016 | Department of DefenseW6QK ACC-RSA | 0564 | 336413 | IGF::OT::IGF PATRIOT MSE/MRT/ERT | $1.6M |
| Oct 31, 2016 | Department of DefenseW6QK ACC-RSA | 0607 | 336413 | IGF::OT::IGF THIS SOW DEFINES THE EFFORT REQUIRED FOR THE MANUFACTURING AND DELIVERY OF 101 UH60M PALLETS, PN: 1010296-004 WITH THE OPTION TO MANUFACTURE AND DELIVER 30 ADDITIONAL PALLETS. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS. | $311K |
| Oct 20, 2016 | Department of DefenseW6QK ACC-RSA | 0315 | 336413 | IGF::OT::IGF INTEGRATION/QUALIFICATION FOR THE H-60L DIGITAL COCKPIT UPGRADE KIT, W58RGZ-12-D-0089, TASK ORDER 0315 (ORDER EXECUTION PLAN 16231) . | $3.1M |
| Sep 30, 2016 | Department of DefenseW6QK ACC-RSA | 0580 | 336413 | IGF::OT::IGF , TASK ORDER 0580, OEP 18468, "BUILDING 4803 AIRCRAFT HANGAR SUPPORT." | $346K |
| Sep 30, 2016 | Department of DefenseW6QK ACC-RSA | 0541 | 336413 | IGF::OT::IGF NEW ORDER FOR HIGH BAY SUPPORT | $277K |
| Sep 30, 2016 | Department of DefenseW6QK ACC-RSA | 0342 | 336413 | IGF::OT::IGF MULTI MISSION LAUNCHER ORDER 0342/OEP 16413 | $9.0M |
| Sep 30, 2016 | Department of DefenseW6QK ACC-RSA | 0617 | 336413 | IGF::OT::IGF ORDER 0617 THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED FOR THE DESIGN, ENGINEERING, INTEGRATION, TESTING, AND TECHNICAL PUBLICATIONS OF THE PRE-PLANNED PRODUCT IMPROVEMENT (P3I) FOR THE AN/MSQ 135A MOBILE TOWER SYSTEM (MOTS). INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT, ENGINEERING, LOGISTICS AND CONFIGURATION MANAGEMENT SUPPORT PLANNING REQUIREMENTS NEEDED TO ACCOMPLISH THIS PROGRAM. | $2.0M |
| Sep 29, 2016 | Department of DefenseW6QK ACC-RSA | 0627 | 336413 | IGF::OT::IGF, TO 727, OEP 18841, "PROVIDE SUPPORT EQUIPMENT (SE) REQUIRED TO SUPPORT V-22 PLANNED MAINTENANCE INTERVAL (PMI) EFFORTS. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT, SYSTEM ENGINEERING, AND LOGISTICS REQUIREMENTS. | $6.7M |
| Sep 29, 2016 | Department of DefenseW6QK ACC-RSA | 0399 | 336413 | IGF::OT::IGF | $68K |
| Sep 29, 2016 | Department of DefenseW6QK ACC-RSA | 0631 | 336413 | IGF::OT::IGF , TO 631, JORDAN FMS CASE U4-B-UXA H60M DEPLOYMENT SUPPORT KIT. "EFFORT REQUIRED TO PROVIDE JORDAN H60M DEPLOYMENT SUPPORT KIT (DSK) IN SUPPORT OF FMS CASE U4-B-UXA. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS." | $492K |
| Sep 29, 2016 | Department of DefenseW6QK ACC-RSA | 0512 | 336413 | IGF::OT::IGF NEW ACTION FOR M270A1 IMPROVED ARMORED CAB HUMAN FACTORS AND ERGONOMICS SUPPORT. | $82K |
| Sep 29, 2016 | Department of DefenseW6QK ACC-RSA | 0637 | 336413 | IGF::OT::IGF THE SCOPE OF THIS STATEMENT OF WORK (SOW) DEFINES THE PERSONNEL, MATERIALS,, AND SERVICES REQUIRED TO MODIFY, VERIFY, DOCUMENT, AND DELIVER FOUR UH-60M AIRCRAFT IN TWO UNIQUE SLOVAK REPUBLIC CONFIGURATIONS. | $4.7M |
| Sep 29, 2016 | Department of DefenseW6QK ACC-RSA | 0516 | 336413 | IGF::OT::IGF, ORDER 0516 REMUS MK 600. | $600K |
| Sep 29, 2016 | Department of DefenseW6QK ACC-RSA | 0548 | 336413 | IGF::OT::IGF | $1.7M |
| Sep 29, 2016 | Department of DefenseW6QK ACC-RSA | 0426 | 336413 | IGF::OT::IGF: OEP 17124 UNMANNED AIRCRAFT SYSTEMS (UAS) LIGHTWEIGHT SURVEILLANCE TARGET ACQUISITION RADAR (LSTAR) GROUND-BASE SENSE AND AVOID (GBSAA) RADAR INTEGRATION | $322K |
| Sep 29, 2016 | Department of DefenseW6QK ACC-RSA | 0623 | 336413 | IGF::OT::IGF NEW TASK ORDER IN SUPPORT OF REMUS 600 MK 18 SYSTEM INTEGRATION SUPPORT FOR COMMANDER, UNITED STATES NAVY FIFTH FLEET WAVE EIGHT REV E | $6.1M |
| Sep 29, 2016 | Department of DefenseW6QK ACC-RSA | 0467 | 336413 | IGF::OT::IGF , TASK ORDER 0467, OEP 17405, "FMS C-130 FUEL CELL REPAIRS." | $21K |
| Sep 29, 2016 | Department of DefenseW6QK ACC-RSA | 0405 | 336413 | IGF::OT::IGF: OEP 16909 T-4 ENGINE TEST CELL REFURBISHMENT PRE-INSTALLATION | $324K |
| Sep 28, 2016 | Department of DefenseW6QK ACC-RSA | 0131 | 336413 | TASK ORDER 0131 | $807K |
| Sep 28, 2016 | Department of DefenseW6QK ACC-RSA | 0620 | 336413 | IGF::OT::IGF THE NAVAIR V-22 PROGRAM MANAGEMENT OFFICE (PMO) REQUIRES A REPLACEMENT 6X8 ADVANCED MULTI-FUNCTION DISPLAY (AMFD) FOR INTEGRATION INTO THE V-22 OSPREY AIR VEHICLE TO REPLACE THE OBSOLETE 6X6 MULTI-FUNCTION DISPLAY. | $4.8M |
| Sep 28, 2016 | Department of DefenseW6QK ACC-RSA | 0637 | 336413 | IGF::OT::IGF THE SCOPE OF THIS STATEMENT OF WORK (SOW) DEFINES THE PERSONNEL, MATERIALS,, AND SERVICES REQUIRED TO MODIFY, VERIFY, DOCUMENT, AND DELIVER FOUR UH-60M AIRCRAFT IN TWO UNIQUE SLOVAK REPUBLIC CONFIGURATIONS. | $4.7M |
| Sep 28, 2016 | Department of DefenseW6QK ACC-RSA | 0624 | 336413 | IGF::OT::IGF ORDER 0624 PROGRAM MANAGEMENT, ENGINEERING DEVELOPMENT AND OR COMMERCIAL SOLUTION SELECTION, INTEGRATION, TEST AND EVALUATION, AND INSTALLATION OF A FEDERAL AVIATION ADMINISTRATION FAA APPROVED SUPPLEMENTAL TYPE CERTIFICATED STC FOR AUTOMATIC DEPENDENT SURVEILLANCE BROADCAST ADSB INTO THE US ARMY UH 72A LAKOTA. | $7.6M |
| Sep 28, 2016 | Department of DefenseW6QK ACC-RSA | 0581 | 336413 | IGF::OT::IGF , ORDER 0581, OEP 18394, "PROGRAM MANAGEMENT AND RETROFIT OF NINE (9) UH 72A AIRCRAFT WITH THE COMBAT TRAINING CENTER (CTC) OFFENSIVE SHOOTBACK CAPABILITY. THIS SOW ALSO DEFINES OPTIONS FOR UP TO AN ADDITIONAL ONE (1)) RETROFIT. | $5.0M |
| Sep 28, 2016 | Department of DefenseW6QK ACC-RSA | 0619 | 336413 | IGF::OT::IGF NEW ORDER. THIS STATEMENT OF WORK (SOW) DEFINES THE REQUIREMENTS FOR PROVIDING (5) 13589523, INPUT LATCH NO.2 CIRCUIT CARD ASSEMBLIES AND (5) 13589435-2 DATA ACQUISITION CIRCUIT CARD ASSEMBLIES TO SUPPORT SUSTAINMENT OF THE PATRIOT LAUNCHER STATION TEST SETS (LSTS). INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS. | $73K |
| Sep 28, 2016 | Department of DefenseW6QK ACC-RSA | 0620 | 336413 | IGF::OT::IGF THE NAVAIR V-22 PROGRAM MANAGEMENT OFFICE (PMO) REQUIRES A REPLACEMENT 6X8 ADVANCED MULTI-FUNCTION DISPLAY (AMFD) FOR INTEGRATION INTO THE V-22 OSPREY AIR VEHICLE TO REPLACE THE OBSOLETE 6X6 MULTI-FUNCTION DISPLAY. | $531K |
| Sep 27, 2016 | Department of DefenseW6QK ACC-RSA | 0550 | 336413 | IGF::OT::IGF , TO 550, OEP 18112. | $13K |
| Sep 27, 2016 | Department of DefenseW6QK ACC-RSA | 0609 | 336413 | IGF::OT::IGF ORDER 0609 CORRECT DESIGN DEFICIENCIES IN THE INTERIM MEDEVAC MISSION SUPPORT SYSTEM (IMMSS) AS PRESENTED IN AIRWORTHINESS IMPACT STATEMENT (AWIS) 12-066. THIS PROGRAM IS DIVIDED INTO MULTIPLE STAGES. STAGE 1 (ORDER 0178) RESULTED IN A SYSTEM REQUIREMENTS REVIEW (SRR) THAT DETAILED THE PATH AHEAD FOR THE REST OF THE PROGRAM. STAGE 2 (ORDER 0292) PROVIDED THE NON-RECURRING ENGINEERING (DEVELOPMENT OF THE DESIGN CHANGE AND UPDATES TO THE MODIFICATION WORK ORDER (MWO), PUBLICATIONS, AND PROVISIONING). STAGE 3 (THIS SOW) WILL PROVIDE MANUFACTURING AND FIELDING OF 208 RETROFIT KITS. | $4.2M |
| Sep 27, 2016 | Department of DefenseW6QK ACC-RSA | 0629 | 336413 | IGF::OT::IGF ORDER 0629 THE PROTOTYPE INTEGRATION FACILITY (PIF) HAS A REQUIREMENT TO BUILD AND INTEGRATE AUTONOMOUS UNDERWATER VEHICLE (AUV) SYSTEM COMPONENTS FOR THE NEXT GENERATION MARK (MK) 18 FAMILY REMUS 600 AUV IN SUPPORT OF THE DIRECTOR OF THE NAVY EXPEDITIONARY COMBAT BRANCH, COUNTER RADIO CONTROLLED IMPROVISED EXPLOSIVE DEVICE ELECTRONIC (IED) WARFARE (PMS-408). | $207K |
| Sep 27, 2016 | Department of DefenseW6QK ACC-RSA | 0600 | 336413 | IGF::OT::IGF ORDER 0600 THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED FOR ITEM PROCUREMENT, FABRICATION, KITTING, PACKAGING, AND SHIPPING OF C-130 SEARCH AND RESCUE (SAR) BINS. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS. | $397K |
| Sep 27, 2016 | Department of DefenseW6QK ACC-RSA | 0566 | 336413 | IGF::OT::IGF, TO 566, OEP 18219, "PROVIDE CUSTOMS AND BORDER PATROL H60M PECULIAR GROUND SUPPORT EQUIPMENT (PGSE) IN SUPPORT OF CURRENT OPERATIONS. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS."" | $448K |
| Sep 26, 2016 | Department of DefenseW6QK ACC-RSA | 0451 | 336413 | IGF::OT::IGF MODIFICATION OF TWO (2) UH-60M AIRCRAFT WITH UNIQUE MISSION EQUIPMENT FOR THE U.S. FEDERAL BUREAU OF INVESTIGATIONS (FBI). | $169K |
| Sep 26, 2016 | Department of DefenseW6QK ACC-RSA | 0572 | 336413 | IGF::OT::IGF , TO 572, "UAE APACHE REDUCED SIZE CRASHWORTHY EXTERNAL FUEL SYSTEM (RCEFS)/MULTIFUNCTION SYSTEM PROCESSOR UNIT (MSPU) KIT INSTALLS&MAIN ROTOR HEAD (MRH) CONTAINER ASSEMBLIES" | $12M |
| Sep 26, 2016 | Department of DefenseW6QK ACC-RSA | 0590 | 336413 | IGF::OT::IGF ORDER 0590 THE PURPOSE OF THIS STATEMENT OF WORK (SOW) IS TO DEFINE THE EFFORT REQUIRED TO PROVIDE AND KIT UH-60M MILITARY DISTRICT OF WASHINGTON (MDW) AND EMERGENCY EVACUATION MISSION KIT (EEMK) UNIQUE MISSION SYSTEMS REQUIRED TO MAINTAIN THE 60M FIELDED AIRCRAFT FOR A PERIOD OF 12 MONTHS. THE CONTRACTOR SHALL PROVIDE (PROCURE, FABRICATE, OR REPAIR) BOTH A-KIT AND B-KIT PARTS IDENTIFIED IN THIS SCOPE OF WORK AND SHIP ASSETS TO SUPPORT UNSCHEDULED MAINTENANCE AT FT. BELVOIR. ALL KITS SHALL BE PROVIDED IN ACCORDANCE WITH THE APPROVED DRAWING PACKAGE PROVIDED AS GOVERNMENT FURNISHED INFORMATION. | $361K |
| Sep 23, 2016 | Department of DefenseW6QK ACC-RSA | 0626 | 336413 | IGF::OT::IGF SOW NAVO NP3 CM/MO SUPPORT TO PROVIDE SOLUTIONS TO COMPLEX OCEANOGRAPHIC PROBLEMS FOR THE US NAVY. THE OCEANOGRAPHIC DEPARTMENT USES A VARIETY OF OCEANOGRAPHIC SYSTEMS TO COLLECT THE DATA REQUIRED TO SOLVE THESE PROBLEMS. NP3 PERFORMS ALL THE NECESSARY ENGINEERING AND LOGISTICAL FUNCTIONS REQUIRED TO MAINTAIN THESE SYSTEMS AT A HIGH LEVEL OF READINESS. | $57K |
| Sep 23, 2016 | Department of DefenseW6QK ACC-RSA | 0517 | 336413 | IGF::OT::IGF NEW TASK ORDER FOR "BOMB RACK MODERNIZED TECHNICAL DATA PACKAGE DEVELOPMENT REV 1" | $825K |
| Sep 23, 2016 | Department of DefenseW6QK ACC-RSA | 0315 | 336413 | IGF::OT::IGF INTEGRATION/QUALIFICATION FOR THE H-60L DIGITAL COCKPIT UPGRADE KIT, W58RGZ-12-D-0089, TASK ORDER 0315 (ORDER EXECUTION PLAN 16231) . | $864K |
| Sep 23, 2016 | Department of DefenseW6QK ACC-RSA | 0397 | 336413 | IGF::OT::IGF H-60 BLACKHAWK AIRCRAFT ENHANCED BALLISTIC ARMAMENT PROTECTION SYSTEMS (EBAPS) | $202K |
| Sep 23, 2016 | Department of DefenseW6QK ACC-RSA | 0596 | 336413 | IGF::OT::IGF PROVIDE FORTY-FIVE (45) AURS MK112 MOD2S, FORTY-FIVE (45) AURS MK112 MOD2S CA 717 CABLE ASSEMBLIES, FIVE (5) DYNAMIC LOAD BACK CONTROLLERS (DLBC), AND TEN (10) VPT CABLES. THIS SOW ALSO DEFINES AN OPTION FOR AN ADDITIONAL FORTY-FIVE (45) AURS MK112 MOD2S AND FORTY-FIVE (45) AURS MK112 MOD2S CA 717 CABLE ASSEMBLIES. | $2.4M |
| Sep 23, 2016 | Department of DefenseW6QK ACC-RSA | 0613 | 336413 | IGF::OT::IGF PROVIDE, PERFORM ACCEPTANCE TESTING, AND INTEGRATE ASSEMBLIES INTO THE SEAL DELIVERY VEHICLE, USING GOVERNMENT FURNISHED INFORMATION, IN SUPPORT OF THE NAVY SPECIAL WARFARE PROGRAM OFFICE, PMS 340, AND NAVAL SURFACE WARFARE CENTER, PANAMA CITY DIVISION. | $888K |
| Sep 23, 2016 | Department of DefenseW6QK ACC-RSA | 0499 | 336413 | IGF::OT::IGF NEW ORDER UNDER IDIQ W58RGZ12D0089 | $55K |
| Sep 23, 2016 | Department of DefenseW6QK ACC-RSA | 0608 | 336413 | IGF::OT::IGF SOW, H-60 A/L/M ENGINE COWLING REPAIRS,TO REPAIR THE DAMAGED ENGINE COWLINGS WITHIN THEIR CURRENT INVENTORY TO MEET FIELDING REQUIREMENTS. | $586K |
| Sep 22, 2016 | Department of DefenseW6QK ACC-RSA | 0058 | 336413 | NOT TO EXCEED ORDER FOR RECOVERY OF AIRBASE DENIED BY ORDNANCE IN SUPPORT OF THE AIR FORCE | $1.7M |
Get Alerted Before Redstone Defense Systems's Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free