Home/Contractors/Redstone Defense Systems/contracts

Federal Contractor Profile

Redstone Defense Systems

$912M obligated·660 awards·1 agencies·2 NAICS

Federal Contracts

Showing contracts 351400 of 621 total. Sorted by action date, most recent first. Excludes $0 modifications.

DateAgencyPIIDNAICSDescriptionAmount
Mar 22, 2017Department of DefenseW6QK ACC-RSA0623336413IGF::OT::IGF NEW TASK ORDER IN SUPPORT OF REMUS 600 MK 18 SYSTEM INTEGRATION SUPPORT FOR COMMANDER, UNITED STATES NAVY FIFTH FLEET WAVE EIGHT REV E$1.4M
Mar 22, 2017Department of DefenseW6QK ACC-RSA0625336413IGF::OT::IGF V-22 OSPREY MISSION COMPUTER OBSOLESCENCE THIS EFFORT IS REQUIRED TO SUPPORT PMA-275 FOR THE PROCUREMENT, MANUFACTURING, INTEGRATION, KITTING, DELIVERY, AND INSTALLATION OF MISSION COMPUTER OBSOLESCENCE INITIATIVE (MCOI) RETROFIT KITS AND COMMON AIRCRAFT PORTABLE REPROGRAMMING EQUIPMENT (CAPRE) GBE FILLPORT KITS. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS.$5.1M
Mar 20, 2017Department of DefenseW6QK ACC-RSA0615336413IGF::OT::IGF PROGRAM MANAGEMENT, AND INTEGRATION OF THE AIRBUS HELICOPTERS INC. COCKPIT VOICE AND FLIGHT DATA RECORDER (CV/FDR) SERVICE BULLETIN MBB-BK117 C-2-31-046 INTO TWENTY-ONE (21) US ARMY UH-72A LAKOTA.$2.8M
Mar 17, 2017Department of DefenseW6QK ACC-RSA0434336413IGF::OT::IGF INCREMENTALLY FUNDED$2.0M
Mar 15, 2017Department of DefenseW6QK ACC-RSA0342336413IGF::OT::IGF MULTI MISSION LAUNCHER ORDER 0342/OEP 16413$7.3M
Mar 13, 2017Department of DefenseW6QK ACC-RSA0642336413IGF::OT::IGF FMS ORDER 0642 FOR TUNISIA. THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO PROVIDE PROCUREMENT, MANUFACTURING , KITTING, EXECUTION, AND DELIVERY OF THE TUNISIA FMS CASE TU-B-USS H60M INITIAL ACCEPTANCE SUPPORT PACKAGE. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS.$7K
Mar 13, 2017Department of DefenseW6QK ACC-RSA0642336413IGF::OT::IGF FMS ORDER 0642 FOR TUNISIA. THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO PROVIDE PROCUREMENT, MANUFACTURING , KITTING, EXECUTION, AND DELIVERY OF THE TUNISIA FMS CASE TU-B-USS H60M INITIAL ACCEPTANCE SUPPORT PACKAGE. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS.$855K
Mar 13, 2017Department of DefenseW6QK ACC-RSA0646336413IGF::OT::IGF ORDER 0646 IS FOR THE PURPOSE OF THE NAVAL SURFACE WARFARE (NSWC) DETACHMENT AT WHITE SANDS MISSILE RANGE (WSMR) HAS A REQUIREMENT TO PROVIDE LAUNCH COMPLEX FACILITIES BEGINNING IN FY17 AND CONTINUING INTO FY 18 FOR SUPPORT OF PROGRAM EXECUTIVE OFFICE (PEO) INTEGRATED WARFARE SERVICES (IWS) TESTING. THE LAUNCHER EQUIPMENT VAN (LEV) CONSISTS OF ALL INTEGRABLE FACILITIES AND INFRASTRUCTURE TO COMPLETELY SUPPORT AUTONOMOUS LAUNCHING OF VEHICLES FROM THIS PLATFORM. THE LEV WILL CONSIST OF A SERIES OF PRE-LAUNCH PREPARATION AND TAILORED LAUNCH AND SUPPORT INSTRUMENTATION VANS TO BE FABRICATED FROM INTERNATIONAL STANDARDS ORGANIZATION (ISO)VANS EACH HAVING UNIQUE APPLICATION TO THE LAUNCH COMPLEX PURPOSE.$342K
Mar 10, 2017Department of DefenseW6QK ACC-RSA0315336413IGF::OT::IGF INTEGRATION/QUALIFICATION FOR THE H-60L DIGITAL COCKPIT UPGRADE KIT, W58RGZ-12-D-0089, TASK ORDER 0315 (ORDER EXECUTION PLAN 16231) .$7.0M
Mar 10, 2017Department of DefenseW6QK ACC-RSA0548336413IGF::OT::IGF$1.7M
Mar 10, 2017Department of DefenseW6QK ACC-RSA0654336413IGF::OT::IGF THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO PROVIDE AH-64E APR-39 DV2 A-KITS. THE APR-39 DV2 RADAR WARNING RECEIVER (RWR)/ELECTRONIC WARFARE MANAGEMENT SYSTEM (EWMS) IS BEING DESIGNED TO MAXIMIZE SURVIVABILITY BY IMPROVING AIRCREW SITUATIONAL AWARENESS VIA INTERACTIVE MANAGEMENT OF ALL ONBOARD SENSORS AND COUNTERMEASURES. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS. THE APR-39 DV2 IS CURRENTLY IN THE DEVELOPMENT PHASE. THE CONTRACTOR SHALL PROVIDE, KIT AND SHIP TWENTY-EIGHT (28) AH-64E APR-39 DV2 A-KITS IN ACCORDANCE WITH (IAW) THE GOVERNMENT FURNISHED PRELIMINARY TDP. THE CONTRACTOR SHALL PROVIDE TWENTY-EIGHT (28) COCKPIT UTILITY RELAY BOXES (PN 7-611B25001-107). THE CONTRACTOR SHALL PROVIDE FIVE (5) TOOL SETS IAW THE GOVERNMENT FURNISHED PRELIMINARY TDP.$3.7M
Mar 9, 2017Department of DefenseW6QK ACC-RSA0650336413IGF::OT::IGF THIS IS A NEW ORDER. THE STATEMENT OF WORK (SOW) DEFINES THE EFFORTS REQUIRED TO PROVIDE CH-47F MODEL SOFTWARE LOADING SPECIAL TOOLS&TEST EQUIPMENT (STTE) TO SUPPORT THE PERFORMANCE AND MAINTENANCE OF THIS AIRCRAFT FOR AUSTRALIA ARMY FIELD OPERATIONS. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT, MANUFACTURING, AND LOGISTICS SUPPORT PLANNING REQUIREMENTS.$263K
Mar 8, 2017Department of DefenseW6QK ACC-RSA0490336413IGF::OT::IGF OEP 17410 CUSTOMS&BORDER PROTECTION HH-60L MODS$150K
Mar 8, 2017Department of DefenseW6QK ACC-RSA0649336413IGF::CL,CT::IGF THE STATEMENT OF WORK IDENTIFIES REQUIREMENTS TO BE ACCOMPLISHED BY THE CONTRACTOR IN SUPPORT OF THE PROTOTYPE INTEGRATION FACILITY (PIF) FUTURE LAUNCHER TEST-BED (FLT) DEVELOPMENT. THE FUTURE LAUNCHER TEST-BED IS A PALLETIZED LAUNCHER CAPABLE OF FIRING THE MULTIPLE LAUNCH ROCKET SYSTEM (MLRS) FAMILY OF MUNITIONS (MFOM), TWO (2) PODS LOAD OUT, WITH AZIMUTH AND ELEVATION CAPABILITY. THE DRAWING PACKAGE FOR THE FLIT ARE UNDER DEVELOPMENT BY THE GOVERNMENT AND WILL BE PROVIDED TO THE CONTRACTOR. THE LAUNCHER DESIGN WILL BE BASED ON THE M270 DESIGN. TWO LEGACY M3 CONTAINER ROLL-ON/ROLL-OF PLATFORMS AND TWO M270 LAUNCHERS (NON-FUNCTIONAL) WILL BE PROVIDED TO THE CONTRACTOR FOR RE-UTILIZATION OF KEY COMPONENTS IN ORDER TO REDUCE COST AND SCHEDULE RISK. ACTIVITIES INCLUDE DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TEST, AND CHECKOUT OF MECHANICAL AND ELECTRICAL COMPONENTS AND LINE REPLACEABLE UNITS (LRUS) ASSOCIATED WITH THE DEVELOPMENT OF TWO FUTURE LAUNCHER INTEGRATION TEST (FLIT) UNITS WHICH WILL FACILITATE TESTING OF FLT FUNCTIONALITY.$3.0M
Mar 8, 2017Department of DefenseW6QK ACC-RSA0570336413IGF::OT::IGF:, REQUIREMENT IS FOR THE INSTALLATION OF MULTIPLE MISSION ESSENTIAL KITS AND COMPONENTS FOR THE APACHE AIRCRAFT.$240K
Mar 2, 2017Department of DefenseW6QK ACC-RSA0292336413IGF::OT::IGF ORDER 02929 FOR THE IMMSS MEDEVAC SUPPORT.$13K
Mar 2, 2017Department of DefenseW6QK ACC-RSA0260336413IGF::OT::IGF OEP 15174$198K
Mar 1, 2017Department of DefenseW6QK ACC-RSA0570336413IGF::OT::IGF:, REQUIREMENT IS FOR THE INSTALLATION OF MULTIPLE MISSION ESSENTIAL KITS AND COMPONENTS FOR THE APACHE AIRCRAFT.$142K
Mar 1, 2017Department of DefenseW6QK ACC-RSA0575336413IGF::OT::IGF ORDER 0575, HH-60M BASIC MEDICAL INTERIOR (BMI) UPGRADE, SYSTEM REQUIREMENTS REVIEW THE CONTRACTOR SHALL PROVIDE INTEGRATION CONCEPTS AND INITIATION OF DESIGN FOR HH-60M BMI UPGRADE.$75K
Mar 1, 2017Department of DefenseW6QK ACC-RSA0626336413IGF::OT::IGF SOW NAVO NP3 CM/MO SUPPORT TO PROVIDE SOLUTIONS TO COMPLEX OCEANOGRAPHIC PROBLEMS FOR THE US NAVY. THE OCEANOGRAPHIC DEPARTMENT USES A VARIETY OF OCEANOGRAPHIC SYSTEMS TO COLLECT THE DATA REQUIRED TO SOLVE THESE PROBLEMS. NP3 PERFORMS ALL THE NECESSARY ENGINEERING AND LOGISTICAL FUNCTIONS REQUIRED TO MAINTAIN THESE SYSTEMS AT A HIGH LEVEL OF READINESS.$60K
Feb 28, 2017Department of DefenseW6QK ACC-RSA0114336413OEP 14593$120K
Feb 14, 2017Department of DefenseW6QK ACC ANAD0017336992VARIOUS SUPPORT SERVICES, TRAVEL AND OTHER DIRECT COST IN SUPPORT OF THE DEVELOPMENT OF OVERHAUL WORK INSTRUCTIONS FOR THE M1A1 STABILIZED COMMANDERS WEAPON STATION (SCWS).$470K
Feb 13, 2017Department of DefenseW6QK ACC-RSA0644336413IGF::OT::IGF ORDER 0644 IS FOR THE PURPOSE OF THE MODERNIZATION, MODIFICATION AND INTEGRATION OF THE AVIATION INTERMEDIATE MAINTENANCE AVIM SHOP SETS AND SPECIALIZED AIRCRAFT MAINTENANCE EQUIPMENT UNDER THE FOREIGN MILITARY SALES PROGRAM CASE IQ-B-UGZ.$12M
Feb 10, 2017Department of DefenseW6QK ACC-RSA0643336413IGF::OT::IGF NEW ORDER. MODIFICATION OF H-60M AIRCRAFT INFRARED SEARCH LIGHT SYSTEM INTENSITY DECREASED/INCREASED FUNCTION ON THE PILOT AND CO-PILOT COLLECTIVE STICK FOR THE UH-60M AND HH-60M, HEREIN REFERRED TO AS THE H-60M, IR SEARCHLIGHT TO BE DIMMED TO A DESIRED LEVEL OF LUMINESCENCE IN 10% INCREMENTS. THE IR SEARCH LIGHT SYSTEMS INCLUDES ALL HARDWARE FROM THE PILOT AND COPILOT COLLECTIVE SWITCH, ALL ASSOCIATED WIRING. THESE EFFORTS WILL RESULT IN AN ENGINEERING CHANGE PROPOSAL (ECP) AND A MODIFICATION WORK ORDER (MWO) FOR BOTH THE HH/UH-60M AIRCRAFT.$859K
Feb 9, 2017Department of DefenseW6QK ACC-RSA0630336413IGF::OT::IGF THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED FOR THE PROCUREMENT, MANUFACTURING, DESIGN, ENGINEERING, KITTING, AND SHIPPING OF THE H-60M SOFTWARE LOADER SUPPORT PACKAGE. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS.$854K
Feb 9, 2017Department of DefenseW6QK ACC-RSA0623336413IGF::OT::IGF NEW TASK ORDER IN SUPPORT OF REMUS 600 MK 18 SYSTEM INTEGRATION SUPPORT FOR COMMANDER, UNITED STATES NAVY FIFTH FLEET WAVE EIGHT REV E$405K
Feb 9, 2017Department of DefenseW6QK ACC-RSA0591336413IGF::OT::IGF NEW ORDER TO W58RGZ12D0089$4.1M
Feb 3, 2017Department of DefenseW6QK ACC-RSA0489336413IGF::OT::IGF NEW ORDER FOR CH-47 FADEC CONTINUITY TEST SET (FCTS)$784K
Jan 26, 2017Department of DefenseW6QK ACC-RSA0633336413IGF::OT::IGF THE PURPOSE OF THIS STATEMENT OF WORK (SOW) IS TO DEFINE THE EFFORTS REQUIRED TO INTEGRATE THE 60 KVA GENERATOR ON THE UH-60M AND HH-60M, HEREIN REFERRED TO AS THE H-60M. THE 60 KVA GENERATOR WILL REPLACE THE 45 KVA GENERATOR AND IS CURRENTLY IN USE ON THE MH-60M.$603K
Jan 24, 2017Department of DefenseW6QK ACC-RSA0315336413IGF::OT::IGF INTEGRATION/QUALIFICATION FOR THE H-60L DIGITAL COCKPIT UPGRADE KIT, W58RGZ-12-D-0089, TASK ORDER 0315 (ORDER EXECUTION PLAN 16231) .$4.7M
Jan 18, 2017Department of DefenseW6QK ACC-RSA0315336413IGF::OT::IGF INTEGRATION/QUALIFICATION FOR THE H-60L DIGITAL COCKPIT UPGRADE KIT, W58RGZ-12-D-0089, TASK ORDER 0315 (ORDER EXECUTION PLAN 16231) .$1.9M
Jan 12, 2017Department of DefenseW6QK ACC-RSA0447336413IGF::OT::IGF NEW TASK ORDER FOR C-130 IMPROVED MODULAR AIRBORNE FIRE FIGHTING SYSTEM PHASE II$1.5M
Jan 11, 2017Department of DefenseW6QK ACC-RSA0598336413IGF::OT::IGF ORDER 0598 TO W58RGZ12D0089 SUPPORT NAVAIR PMA-275 FOR THE PROVISION, KITTING, DELIVERY, AND INSTALLATION OF MULTIPLE V-22 MODERNIZATION KITS. THIS INCLUDES THE IRIDIUM SATELLITE PHONE ANTENNA KITS AS A BASE REQUIREMENT AND THE SEAT BELT HARNESS KITS AS AN OPTION REQUIREMENT.$1.5M
Jan 10, 2017Department of DefenseW6QK ACC-RSA0195336413IGF::OT::IGF: OEP 15238 DEPARTMENT OF STATE (DOS) SPARES IN SUPPORT OF THE UH-60M MODIFICATION EFFORT$154K
Dec 29, 2016Department of DefenseW6QK ACC-RSA0315336413IGF::OT::IGF INTEGRATION/QUALIFICATION FOR THE H-60L DIGITAL COCKPIT UPGRADE KIT, W58RGZ-12-D-0089, TASK ORDER 0315 (ORDER EXECUTION PLAN 16231) .$2.0M
Dec 29, 2016Department of DefenseW6QK ACC-RSA0634336413IGF::OT::IGF ORDER 0634 THE UH-60 PROJECT MANAGEMENT OFFICE HAS A REQUIREMENT TO DEVELOP A PROCEDURE FOR FIELD-LEVEL REPAIR OF CRACKS IN THE ENGINE AIR INLET. EXISTING PROCEDURES ALREADY IN USE BY THE NAVY AND AIR FORCE WILL BE USED AS THE BASIS FOR DEVELOPMENT OF THE NEW ARMY PROCEDURE.$285K
Dec 22, 2016Department of DefenseW6QK ACC-RSA0492336413IGF::OT::IGF NEW TASK ORDER FOR "INTEGRATION AND QUALIFICATION FOR THE H-60 L/M FEDERATED ADVANCE NAVIGATION SYSTEM (FANS)"$1.0M
Dec 22, 2016Department of DefenseW6QK ACC-RSA0641336413IGF::OT::IGF THE STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO DEVELOP WORK INSTRUCTIONS TO RETROFIT THE SAFIRE II FLIR BALLAST TO SAFIRE II/TALON FLIR BALLAST AND TO THEN RETROFIT NINETY-ONE (91) SAFIRE II FLIR BALLAST TO SAFIRE II/TALOR FLIR BALLASTS.$297K
Dec 22, 2016Department of DefenseW6QK ACC-RSA0560336413IGF::OT::IGF THE STATEMENT OF WORK FOR THIS EFFORT ENTITLED CRASH INVESTIGATION KIT PHASE II DEFINES THE EFFORT REQUIRED FOR THE DESIGN, ENGINEERING AND INTEGRATION OF 97 CRASH INVESTIGATION KITS. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT, CONFIGURATION MANAGEMENT AND ENGINEERING REQUIREMENTS. THE CONTRACTOR SHALL PROVIDE 97 CRASH INVESTIGATION KITS IN ACCORDANCE WITH GOVERNMENT FURNISHED INFORMATION (GFI) CRASH INVESTIGATION KIT TDP 1060242 AND ANY APPROVED ENGINEERING CHANGE PROPOSALS GENERATED AS A RESULT OF THIS EFFORT. THE CONTRACTOR SHALL UPDATE THE COMPONENT LIST AND TECHNICAL DATA PACKAGE IAW DI SESS 8100 TO INCORPORATE ECPS FOR KIT FOAM CHANGES REQUIRED FOR OBSOLESCENCE ISSUES.$516K
Dec 20, 2016Department of DefenseW6QK ACC ANAD0034336992IGF::OT::IGF. VARIOUS SUPPORT SERVICES FOR THE CABLE BUILD FOR THE JOINT ASSAULT BREACHER (JAB) PROGRAM.$497K
Dec 14, 2016Department of DefenseW6QK ACC-RSA0353336413IGF::OT::IGF OEP 16582, ORDER 0353 FOR H-60 MAINTENANCE AND SUPPORT$24K
Dec 9, 2016Department of DefenseW6QK ACC-RSA0604336413IGF::OT::IGF THIS SOW DEFINES THE EFFORT REQUIRED TO PROVIDE AND INTEGRATE UH-60L AIRCRAFT WITH THE EXTERNAL STORES SUPPORT SYSTEM (ESSS) MOUNTED RESCUE HOIST (EMRH). THE INTEGRATION OF THE EMRH WILL RESOLVE INTERFERENCE ISSUES WITH MEDEVAC MISSION KITS.$4.6M
Dec 8, 2016Department of DefenseW6QK ACC-RSA0424336413IGF::OT::IGF OEP-17146. FABRICATION, INTEGRATION AND TEST OF THE KNIFEFISH SUPPORT CONTAINER FOR LITTORAL COMBAT SHIP (LCS) MINE COUNTER MEASURE (MCM) MISSION PACKAGE$125K
Dec 7, 2016Department of DefenseW6QK ACC-RSA0246336413FMS APACHE-EGYPT MAINTENANCE SUPPORT (OEP 14902/DO 0246)$644K
Dec 7, 2016Department of DefenseW6QK ACC-RSA0583336413IGF::OT::IGF PFRMS HIMARS CLEVIS RETROFIT SUPPORT$1.0M
Dec 6, 2016Department of DefenseW6QK ACC-RSA0530336413IGF::OT::IGF, MHU-235/ADU-928 KITS.$143K
Dec 6, 2016Department of DefenseW6QK ACC-RSA0293336413IGF::OT::IGF OEP 16135$606K
Dec 1, 2016Department of DefenseW6QK ACC-RSA0549336413IGF::OT::IGF NEW TASK ORDER$132K
Nov 30, 2016Department of DefenseW6QK ACC-RSA0622336413IGF::OT::IGF ORDER 0622 THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED FOR THE PROTOTYPE INTEGRATION FACILITY TO PROVIDE TECHNICAL AND ENGINEERING SUPPORT TO THE PRECISION FIRES ROCKET AND MISSILE SYSTEMS (PFRMS) PROJECT OFFICE CONCERNING HUMAN FACTORS AND ERGONOMICS (HFE) ISSUES FOR THE M270A1 IMPROVED ARMORED CAB (IAC) PROGRAM. THE M270A1 IAC IS DESIGNED TO INCREASE CREW SURVIVABILITY AGAINST IMPROVISED EXPLOSIVE DEVICES (IEDS), ARTILLERY FRAGMENTATION AND SMALL ARMS FIRE. IAC UPGRADES HAVE INVOLVED NUMEROUS DESIGN CHANGES TO THE M270A1 CAB AND IN SOME CASES HAVE CAUSED HFE.$602K
Nov 29, 2016Department of DefenseW6QK ACC-RSA0471336413IGF::OT::IGF: AVIATION GROUND POWER SUPPORT TRAINERS$573K

Get Alerted Before Redstone Defense Systems's Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.

Start Free