Home/Contractors/The Aerospace Corporation/contracts

Federal Contractor Profile

The Aerospace Corporation

$12B obligated·869 awards·9 agencies·12 NAICS

Federal Contracts

Showing contracts 2,2012,250 of 3,034 total. Sorted by action date, most recent first. Excludes $0 modifications.

DateAgencyPIIDNAICSDescriptionAmount
Oct 31, 2018National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTERNNL16AB88T541330IGF::OT::IGF " NESC (NASA (NATIONAL AERONAUTICS AND SPACE ADMINISTRATION) ENGINEERING AND SAFETY CENTER). SENSORS AND INSTRUMENTATION TECHNICAL DISCIPLINE TEAM (TDT) SUPPORT " - THE SCOPE OF THIS EFFORT IS FOR THE CONTRACTOR TO PARTICIPATE AS A MEMBER OF THE NESC SENSORS AND INSTRUMENTATION TECHNICAL DISCIPLINE TEAM. AS MEMBERS OF THIS TEAM, TECHNICAL EXPERTS FROM THE CONTRACTOR SHALL PARTICIPATE IN TEAM MEETINGS, PROVIDE EXPERT ANALYSIS, ADVICE, CONSULTATION, AND GUIDANCE SUPPORT TO THE TEAM LEADER AND PREPARE APPROPRIATE SECTIONS OF TEAM REPORTS AND FINDINGS.$23K
Oct 31, 2018National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTERNNL17AA47T541330IGF::OT::IGF " NASA ENGINEERING AND SAFETY CENTER (NESC) PEER REVIEW OF EXPLORATION SYSTEMS DEVELOPMENT (ESD) INTEGRATED VEHICLE MODAL TEST, MODEL CORRELATION, DEVELOPMENT FLIGHT INSTRUMENTATION (DFI) AND FLIGHT LOADS READINESS " - THE SCOPE OF THIS EFFORT IS FOR THE CONTRACTOR TO IDENTIFY CONCERNS AND GAPS WITHIN THE PLANS AND SCHEDULES THAT AFFECT THE PROGRAMS' ABILITY TO SUPPORT INTEGRATED SYSTEM VERIFICATION LOADS ANALYSES FOR EM-1, EM-2, AND SUBSEQUENT MISSIONS. THE TEAM IS ALSO EXPECTED TO PROPOSE MITIGATIONS BY TEST OR ANALYSIS THAT ADDRESS THE CONCERNS OR GAPS IDENTIFIED. IT IS NOT WITHIN THE SCOPE OF THIS TASK TO DEVELOP DETAILED ALTERNATE TEST OR ANALYSIS PLANS, SCHEDULES, OR COST ESTIMATES. THE RELATED AREAS OF VIBROACOUSTICS AND SHOCK MODELING, ANALYSIS, AND TESTING ARE ALSO OUT-OF-SCOPE FOR THIS PEER REVIEW.$111K
Oct 29, 2018National Aeronautics and Space AdministrationNASA HEADQUARTERSNNH16CP23D541712IGF::OT::IGF THE CONTRACTOR SHALL PROVIDE COST/TECHNICAL DATA PACKAGE (CTDP) DEVELOPMENT SERVICES. THESE SERVICES SHALL INCLUDE THE RESOURCES, PERSONNEL, FACILITIES,(UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT) TO ACCOMPLISH TASKS.$180K
Oct 25, 2018National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER80MSFC19F0004541712THIS TASK ORDER IS TO FUND THE LIGHTWEIGHT INTEGRATED SOLAR ARRAY AND ANTENNA LISA-T PROJECT.$26K
Oct 24, 2018National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG12VN14T541712TO PROVIDE DIRECT SUPPORT TO THE SPACE NETWORK GROUND SEGMENT SUSTAINMENT PROJECT - SERVICES: THE CONTRACTOR SHALL PROVIDE ON/OFF-SITE PROJECT AND MULTIDISCIPLINARY ENGINEERING SERVICES, INDEPENDENT TESTING, CONTRACTOR-ON-SITE MONITORING, AND INDEPENDENT EVALUATION OF PROJECTS AND/OR PROGRAMS, INCLUDING COST, SCHEDULE, AND AFFORDABILITY ANALYSES, IN ANY PHASE OF THE LIFE-CYCLE. THE CONTRACTOR SHALL ALSO PROVIDE LEADERSHIP OR STAFFING FOR FOCUSED SCIENCE AND TECHNOLOGY STUDIES, ADVANCED SYSTEMS ARCHITECTURE, SYSTEMS ENGINEERING AND INDEPENDENT REVIEWS OF ALL ABOVE ACTIVITIES PURSUANT TO TASK ORDERS ISSUED BY THE CONTRACTING OFFICER. THESE SERVICES SHALL INCLUDE THE PERSONNEL, FACILITIES, AND MATERIALS (UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT) TO ACCOMPLISH THE TASKS. TASKS ORDERS WILL BE ISSUED TO PERFORM SERVICES FOR ANY OF GSFC S OR ARC S ORGANIZATIONAL ENTITIES RELATED TO PARTS, COMPONENTS, SOFTWARE, SUBSYSTEMS, SYSTEMS, AND SYSTEMS OF SYSTEMS CIRCUMSCRIBED BY AEROSPACE S CORE FUNCTIONS. TYPES OF NASA ENDEAVORS MAY INCLUDE, BUT ARE NOT LIMITED TO, SPACECRAFT; INSTRUMENTS OR OTHER PAYLOADS; OBSERVATORIES; LAUNCH VEHICLES (FOR SUB-ORBITAL, ORBITAL, LUNAR, OR INTERPLANETARY MISSIONS); LAUNCH ABORT SYSTEMS; ROVERS, LANDERS, OR IMPACT VEHICLES; GROUND SYSTEMS (INCLUDING MISSION OPERATIONS, DATA PROCESSING AND DISSEMINATION, LAUNCH OPERATIONS, ETC.); FACILITIES (E.G. RESEARCH, TEST, LAUNCH); SPACE AND GROUND NETWORKS; BALLOONS; GROUND SUPPORT EQUIPMENT; SIMULATORS; AND NON-FLIGHT MODELS OR PROTOTYPES. ASSESSMENTS MAY INCLUDE SUPPORT (DIRECT OR INDIRECT) TO ARCHITECTURE AND SYSTEMS DEFINITION; STRATEGIC PLANNING AND TECHNOLOGY ROAD-MAPPING; PERFORMANCE EVALUATION OR TRADES STUDIES (INCLUDING TECHNICAL, COST, SCHEDULE, AND/OR RISK); ACQUISITION AND PROJECT MANAGEMENT; SYSTEMS ENGINEERING; DESIGN ANALYSIS (PRELIMINARY OR DETAILED DESIGN); ASSEMBLY, INTEGRATION, AND TEST; REQUIREMENTS VERIFICATION; TEST INSTRUMENTATION; DATA SYSTEMS MANAGEMENT; LAUNCH AND POST-LAUNCH OPERATIONS; MISSION ASSURANCE (INCLUDING LAUNCH VERIFICATION); SYSTEMS SAFETY; RESEARCH AND TECHNOLOGY; DOCUMENTATION; MAINTENANCE; SUSTAINING ENGINEERING; SPECTRUM MANAGEMENT; CONFIGURATION MANAGEMENT, AND OTHERS. INDEPENDENT INSPECTION, ANALYSIS (INCLUDING MODELING AND SIMULATION), AND/OR TEST SHALL BE USED IN EXECUTION OF THIS SUPPORT. THE CONTRACTOR SHALL ALSO ENSURE THAT SUPPORT IS PROVIDED THAT HAS SIGNIFICANT WORKING KNOWLEDGE OF CURRENT AND NEAR FUTURE TECHNOLOGIES THAT APPLY TO MODERNIZING THIS GROUND SYSTEM.$280K
Oct 24, 2018National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG17VN76T541712IGF::OT::IGF THE CENTER DIRECTOR AT THE NASA GODDARD SPACE FLIGHT CENTER (GSFC) IS RESPONSIBLE FOR MANAGING THE CENTERS DIVERSE AND COMPLEX RESEARCH AND DEVELOPMENT PORTFOLIO; FORMULATING THE CENTERS FUTURE SCIENCE AND TECHNOLOGY GOALS AND LEADING AN INTEGRATED PROGRAM OF INVESTMENTS AND INITIATIVES ALIGNED TO MEET THOSE GOALS. ACCORDINGLY, AEROSPACE SHALL PROVIDE QUALIFIED TECHNICAL EXPERTISE TO THE GODDARD CENTER DIRECTOR TO CONDUCT ASSESSMENTS OF NASA PROGRAMS AND PROJECTS, PROJECT MANAGEMENT, SCIENCE, ENGINEERING AND TECHNOLOGY IN ACCORDANCE WITH THE PRIORITIES AS ESTABLISHED BY THE CENTER DIRECTOR. THE PRIORITIES MAY CHANGE AS THE CENTER DIRECTORS DISCRETION. AEROSPACE IS TASKED TO PROVIDE KNOWLEDGEABLE OBSERVATIONS IN AREAS REQUESTED BY THE GSFC CENTER DIRECTOR WITH A FOCUS ON PROGRAM EXECUTION AND POTENTIAL RISKS. JWST IS THE PLANNED SUCCESSOR TO THE HUBBLE SPACE TELESCOPE, AND IS A TECHNICALLY CHALLENGING PROJECT TO BUILD A SPACECRAFT CONSISTING OF A 6.5 METER PRIMARY MIRROR AND FOUR PRIMARY INSTRUMENTS OPERATING IN THE INFRARED SPECTRUM AT VERY LOW TEMPERATURES, WHILE ORBITING APPROXIMATELY 1.5 MILLION KILOMETERS FROM THE EARTH. BECAUSE OF THE COMPLEXITY OF THE PROJECT, JWST IS ALREADY SUBJECT TO INDEPENDENT EXTERNAL REVIEWS, AND THIS TEAM IS NOT INTENDED TO DUPLICATE OR CONFIRM THE FINDINGS OF THOSE REVIEWS. THE CONTRACTOR WILL BE A MEMBER OF THE TEAM THAT WILL PROVIDE AN AD HOC ASSESSMENT OF THE PROGRAM FOR THE CENTER DIRECTOR, ANALYZE THE BUDGET, AND WILL IDENTIFY THREATS THAT ARE NOT BEING ASSESSED, IF ANY. EXAMPLES OF THE EFFORTS THAT THE CONTRACTOR WILL PERFORM INCLUDE THE LIST BELOW, BUT WILL NOT BE LIMITED TO: 1. CONDUCT SPECIAL STUDIES AND ANALYSES TO SUPPORT CENTER LEADERSHIP DECISION MAKING. THESE MAY INCLUDE, BUT ARE NOT LIMITED TO: A. ANALYSIS OF ALTERNATIVES AND COST ESTIMATES; AND B. ANALYSIS OF ALTERNATIVES FOR MEASURING PERFORMANCE MANAGEMENT AND SUCCESS FACTOR INDICATORS. 2. ASSESS PROGRAM AND PROJECT SCHEDULES 3. MEETINGS SUPPORTING CLASS C/D MISSIONS 4. DEVELOP AND PRESENT FINDING ON FUTURE LAUNCH VEHICLES 5. SUPPORT THE CENTER ON PRESIDENTIAL TRANSITION ACTIVITIES$115K
Oct 23, 2018National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC18F0070541712THE CONTRACTOR SHALL PROVIDE SPECIALIZED ENGINEERING AND TECHNICAL SERVICES TO JPSS GROUND TO SUPPORT ACQUISITION AND OPERATIONS.$70K
Oct 23, 2018Department of DefenseFA8802 INTEGRATION OPERATION PIKPKEFA880219C0001541715FY19 ENGINEERING SERVICES$54M
Oct 17, 2018National Aeronautics and Space AdministrationNASA HEADQUARTERS80HQTR19F0337541712IGF::OT::IGF NASA AGENCY DUE DILIGENCE ASSESSMENT$200K
Oct 12, 2018National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTERNNJ11HD42T541712SPECIAL STUDIES/ANALYSIS- AERONAUTICAL/SPACE$800K
Oct 5, 2018National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER80LARC18F0021541330MAINTAINING MISSION OPERATIONS COST ESTIMATION TOOL (MOCET) PROVIDE TRAINING TO HQ AND THE NASA SCIENCE MISSION DIRECTORATE (SMD) FOR TECHNICAL, MANAGEMENT AND COST REVIEW OF SMD ANNOUNCEMENT OF OPPORTUNITY (AO) PROPOSALS. THIS INCLUDES MOCET TECHNICAL SUPPORT FOR ONE YEAR FROM START OF THIS TASK. ADDITIONAL MISSIONS WILL ALSO BE ADDED AND CERS CHECKED FOR CONSISTENCY.$35K
Sep 27, 2018National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTERNNL16AA64T541330IGF::OT::IGF " ASSESSING RISKS OF FRANGIBLE JOINT DESIGNS " - THE SCOPE OF THIS EFFORT IS FOR THE CONTRACTOR TO (1) REDUCE ENGINEERING UNCERTAINTY IN THE MECHANICS OF FRANGIBLE JOINT OPERATION BY DETERMINING THE SENSITIVITIES IN THE FRANGIBLE JOINT DESIGN, (2) UNDERSTAND WHAT DRIVERS (FACTOR SENSITIVITIES) IMPACT RELIABILITY SO THAT DESIGNS CAN BE BETTER EVALUATED IN REGARD TO CREW RISK, AND (3) MAKE RECOMMENDATIONS FOR IMPROVING ROBUSTNESS OF FRANGIBLE JOINT DESIGNS AS NECESSARY.$27K
Sep 26, 2018National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG17VN79T541712IGF::OT::IGF SEETS II CONTRACT #NNG11VH00B, TASK ORDER #NNG17VN79T ENTITLED: "JOINT POLAR SATELLITE SYSTEM (JPSS) COMMAND, COMMUNICATION, AND CONTROL SEGMENT (C3S) SYSTEM ENGINEERING."$100K
Sep 26, 2018National Aeronautics and Space AdministrationNASA ARMSTRONG FLIGHT RESEARCH CNTR80AFRC18F0153541712AEROSPACE WILL PROVIDE PROGRAMMATIC AND PROJECT SUPPORT IN FISCAL YEAR (FY) 2019 TO AFRC IN SUPPORT OF THE DEVELOPMENT AND EXECUTION OF FLIGHT PROJECTS WORKING WITH OTHER NASA CENTERS AND DOD. THE CONTRACTOR SHALL PROVIDE AFRC WITH HIGHLY SPECIALIZED FUNCTIONAL DISCIPLINE EXPERTISE THAT IS NOT READILY AVAILABLE WITHIN THE GOVERNMENT FOR SERVICE ON EVALUATION PANELS AND BOARDS. THIS EXPERTISE WILL BE USED TO EVALUATE PROPOSALS AND COMPETITIVE MISSION CONCEPTS, COST EVALUATIONS, PROJECT AND PROGRAM ASSESSMENTS, AND STUDIES. OTHER ACTIVITIES INCLUDE REPORTING ON EVALUATION PANEL FINDINGS.$44K
Sep 24, 2018National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER80KSC017F0144541712IGF::OT::IGF MODELING AND ANALYSIS SUPPORT$34K
Sep 21, 2018National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTERNNK17MA41T541712IGF::OT::IGF GROUND SUPPORT DEVELOPMENT&OPERATIONS (GSDO) AEROSPACE EMBEDDED SUPPORT AND REACHBACK CAPABILITY.$34K
Sep 21, 2018National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTERNNK17MA43T541712IGF::OT::IGF EM-2 SYSTEMS ENGINEERING&INTEGRATION AEROSPACE CONSULTING SERVICES$50K
Sep 21, 2018Department of DefenseFA8802 INTEGRATION OPERATION PIKPKEFA880214C0001541712IGF::CL::IGF AEROSPACE FFRDC CONTRACT FROM 1 OCT 2013 TO 30 SEPT 2018$2.6M
Sep 20, 2018National Aeronautics and Space AdministrationNASA HEADQUARTERSNNH16CN00D541712IGF::OT::IGF SCIENCE MISSION DIRECTORATE (SMD) PROGRAMMATIC ASSESSMENT AND MONITORING. THE CONTRACTOR SHALL PROVIDE INDEPENDENT PROGRAMMATIC AND TECHNICAL ASSESSMENT FUNCTIONS THAT CAN:(1) IDENTIFY AND ASSESS PROJECT RISKS WHETHER TECHNICAL, COST AND SCHEDULE RELATED AND PREDICT THE PROBABILITIES AND CONSEQUENCES OF THEIR REALIZATION; (2) PREDICT THE GROWTH OF PROJECT COSTS AND SCHEDULES OVER TIME DUE TO RISKS AND UNCERTAINTY; AND (3) COMMUNICATE RESULTS AND FINDINGS IN A CLEAR, CONCISE MANNER TO SMD PROGRAM EXECUTIVES (PES), PROGRAM ANALYSTS (PAS), THEME DIRECTORS, THE SCIENCE MISSION DIRECTORATE (SMD) ASSOCIATE ADMINISTRATOR (AA) AND STAFF MEMBERS AS NEEDED, THE CONTRACTOR SHALL ALSO: (1) CONDUCT MONTHLY MONITORING OF A DESIGNATED SUBSET OF THE MOST CHALLENGING AND COMPLEX FLIGHT PROJECTS AS THEY PROCEED THROUGH DESIGN, DEVELOPMENT, AND IMPLEMENTATION IN TERMS OF THE EVOLUTION OF THEIR PROGRAMMATIC AND TECHNICAL RISKS, COST AT COMPLETION AND DELIVERY MILESTONES; (2) CONDUCT SPECIAL STUDIES AND ASSESSMENTS OF THE PAST PERFORMANCE OF FLIGHT PROGRAMS IN ORDER TO PREDICT BETTER SMDS FUTURE PERFORMANCE; AND (3) PROVIDE TECHNICAL AND PROGRAMMATIC ASSESSMENTS OF NON-FLIGHT SMD PROGRAMS AND PROJECTS.THE CONTRACTOR SHALL SUPPORT THE MISSION ANALYSIS ENGINEERING FUNCTION FOR SMD PROJECTS TO INCLUDE EXPERIENCED PERSONNEL, ANALYSIS AND ASSESSMENT TOOLS, PROCESSES AND REPORTING FUNCTIONS. ITS EFFORTS SHALL BE STRUCTURED TO ENSURE THAT THE NEEDED DATA, FINDINGS AND INSIGHTS ARE AVAILABLE IN A TIMELY MANNER TO SUPPORT SMD REVIEWS AND DECISION MAKING. THE CONTRACTOR SHALL DESIGNATE FOR EACH ASSIGNED SMD DIVISION OR THEME A MISSION ANALYSIS ENGINEER (MAE) WHO SHALL BE RESPONSIBLE FOR COORDINATING ALL ANALYSES REQUIRED FOR THE ASSESSMENT AND MONITORING FUNCTIONS OF THE DIVISION OR THEMES PROJECTS. EACH MAE SHALL: (1) MAINTAIN THE KNOWLEDGE BASE FOR THE DIVISIONS PROJECTS, INCLUDING FULL KNOWLEDGE OF ALL ON-GOING PROGRAMMATIC AND TECHNICAL ASSESSMENTS; (2) ENSURE THAT KEY ANALYSTS AND SUBJECT MATTER EXPERTS ATTEND MAJOR MILESTONE AND SELECTED PROJECT REVIEWS; AND (3) PRESENT ANALYSES, FINDINGS AND INSIGHTS TO AUDIENCES IDENTIFIED BY SMD DECISION MAKERS.$230K
Sep 20, 2018National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTERNNJ11HD42T541712SPECIAL STUDIES/ANALYSIS- AERONAUTICAL/SPACE$316K
Sep 20, 2018National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTERNNL16AB06T541330IGF::OT::IGF " NASA ENGINEERING AND SAFETY CENTER NESC STRUCTURES TECHNICAL DISCIPLINE TEAM (TDT) SUPPORT " - THE SCOPE OF THIS EFFORT IS FOR THE CONTRACTOR TO PARTICIPATE AS A MEMBER OF THE NESC STRUCTURES TECHNICAL DISCIPLINE TEAM. AS MEMBERS OF THIS TEAM, TECHNICAL EXPERTS FROM THE CONTRACTOR SHALL PARTICIPATE IN TEAM MEETINGS, PROVIDE EXPERT ADVICE AND GUIDANCE TO THE TEAM LEADER AND PREPARE APPROPRIATE SECTIONS OF TEAM REPORTS AND FINDINGS.$26K
Sep 20, 2018National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC18F0053541712NASA GSFC OFFICE OF SPECTRUM MANAGEMENT HAS THE PRIMARY RESPONSIBILITY FOR MANAGING USE OF S BAND FOR ALL NASA OPERATIONS AND IS KNOWN AS THE FACE OF S BAND TO ALL FEDERAL AGENCIES. AS S BAND IS HEAVILY USED BY NASA NETWORKS AND MISSIONS AND THE DEPARTMENT OF DEFENSE DOD COORDINATION AMONG THE AGENCIES HAPPENS FREQUENTLY THROUGHOUT THE YEAR FOR SYSTEMS TO COEXIST IN THE SPECTRUM BY PREVENTING THE OCCURRENCE OF INTERFERENCE TO EACH OTHER S SYSTEMS OPERATING IN THE BAND. S BAND IS HEAVILY CONGESTED AND CONTAINS MANY RESTRICTIONS ON ITS USAGE. THE CONGESTION IS GETTING WORSE EACH YEAR AS FEDERAL AGENCIES CONTINUE TO LOSE ACCESS TO SPECTRUM IN OTHER BANDS THROUGH FCC AUCTIONS AND ARE REALLOCATED TO S BAND BY NTIA. AS THIS TASK ORDER INVOLVES THE STUDY OF S BAND IT IS BENEFICIAL TO NASA AS THE MANAGER OF S BAND TO BE INVOLVED IN PROVIDING GUIDANCE AND EXPERTISE TO THE DON AND AEROSPACE WHEN CONDUCTING STUDIES ON S BAND AS A CANDIDATE FOR REALLOCATION. THE DEPARTMENT OF THE NAVY CHIEF INFORMATION OFFICE DON CIO INSURES ACCESS TO THE RADIO FREQUENCY SPECTRUM FOR NAVY AND MARINE CORPS SYSTEMS TO PROMOTE PROTECT AND ENHANCE THE NATIONS SECURITY AND TO HELP ENSURE THE PROTECTION OF AMERICAN WAR FIGHTERS. IN RESPONSE TO THE AWS 3 AUCTION THE DOD US NAVY HAS TO REALLOCATE AND OR VACATE CERTAIN RADIO FREQUENCY BANDS. NUMEROUS NAVY AND MARINE CORPS COMMUNICATIONS SYSTEMS MAY BE IMPACTED AND ACTIONS ARE REQUIRED TO EVALUATE THE POSSIBILITY OF RELOCATION OR SPECTRUM SHARING WITH COMMERCIAL USERS AND OR IDENTIFYING POTENTIAL MITIGATION TECHNIQUES. IN PARTICULAR THE MARINE CORPS AN MRC 142 C MOBILE POINT TO POINT COMMUNICATIONS MUST VACATE THE BAND IT CURRENTLY OPERATES IN BY JANUARY 2019. ADDITIONALLY PROPOSED UPGRADES TO EXISTING SYSTEMS WILL HAVE TO BE EVALUATED TO DETERMINE THEIR TECHNOLOGY READINESS TO SUPPORT IN BOTH AN OPERATIONAL AND TRAINING ENVIRONMENT. IT IS ANTICIPATED THIS PROJECT WILL RELY ON INFORMATION ANALYSES AND LESSONS LEARNED FROM OTHER FREQUENCY BANDS SELECTED FOR VACATING OR MONITORING FUNDED USING THE SPECTRUM RELOCATION FUND.$176K
Sep 20, 2018Department of CommerceDEPT OF COMMERCE NOAADOCT0011541712IGF::OT::IGF FFRDC SUPPORT. TASK ORDER AWARD.$588K
Sep 19, 2018National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER80LARC18F0090541330LAUNCH AVAILABILITY MODEL INDEPENDENT ASSESSMENT THE NASA ENGINEERING AND SAFETY CENTER HAS BEEN REQUESTED BY THE EXPLORATION GROUND SYSTEMS EGS PROGRAM OFFICE TO PERFORM AN INDEPENDENT REVIEW OF THE EGS LAUNCH AVAILABILITY MODEL, INCLUDING DATA INPUT AND FACTORS, ASSUMPTIONS, MODEL ALGORITHMS, AND OUTPUT INFORMATION. IN ADDITION TO EVALUATING SINGLE FACTOR EFFECTS, ASSESS COMPOUND EFFECTS (INTERACTION) BETWEEN VARIABLES, IF PRACTICAL. EGS IS REQUESTING THIS INDEPENDENT REVIEW TO SUBSTANTIATE THE CREDIBILITY OF THE MODEL FOR MAKING CURRENT AND FUTURE DECISIONS.$14K
Sep 18, 2018National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG12VN13T541712AWARD ENTITLED "SPACE NETWORK RELIABILITY AND LOADING ANALYSIS" RISK ANALYSIS AND SECURITY EVALUATION FOR SPACE NETWORK. THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER (GSFC) IS RESPONSIBLE FOR PROJECT MANAGEMENT OF THE NASA TRACKING AND DATA RELAY SATELLITE SYSTEM (TDRSS) INCLUDING DEVELOPMENT AND OPERATIONS OF THE SPACE CONSTELLATION ASSETS AS WELL AS THE GROUND SYSTEM ASSETS. THIS TASK ASSISTS THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) IN PREDICATING THE FUTURE HEALTH OF THE TDRS SATELLITES IN ORBIT, AND PREDICATING THE ABILITY OF THE SPACE NETWORK TO MEET FUTURE USER REQUIREMENTS. THIS IS AN ONGOING EFFORT THAT HAS OCCURRED YEARLY FOR AT LEAST THE LAST TEN YEARS. DESCRIPTION OF WORK TO BE PERFORMED 1. THE CONTRACTOR WILL UPDATE AND MAINTAIN THE TRACKING AND DATA RELAY SATELLITE SYSTEM (TDRS) FLEET RELIABILITY AND SERVICE AVAILABILITY MODEL; CONDUCT REPLENISHMENT ANALYSES (GAP ANALYSES) ON THE TDRSS CONSTELLATION; 2. THE CONTRACTOR WILL DEVELOP AND MAINTAIN THE USER MISSION MODEL; DEVELOP, UPDATE AND MAINTAIN LOADING ANALYSES BASED ON THE MISSION MODEL; 3. THE CONTRACTOR WILL SUPPORT THE SPACE COMMUNICATIONS CONTROL BOARD OF THE SPACE COMMUNICATIONS AND NAVIGATION OFFICE. THIS SUPPORT WILL REQUIRE ATTENDANCE AT MEETINGS AT GODDARD FACILITIES AS WELL AS OTHER GOVERNMENT FACILITIES, THUS TRAVEL IS AUTHORIZED. DELIVERABLES/MILESTONES THE CONTRACTOR WILL DELIVER RESULTS OF THE TRACKING AND DATA RELAY SATELLITE SYSTEM (TDRS) RELIABILITY ANALYSIS THE CONTRACTOR WILL DELIVER A UNCLASSIFIED FINAL REPORT FOR USER LOADING ANALYSIS THE CONTRACTOR WILL DELIVER A CLASSIFIED FINAL REPORT FOR USER LOADING ANALYSIS. TO THIS END, THE CONTRACTOR SHALL PROVIDE ON/OFF-SITE PROJECT AND MULTIDISCIPLINARY ENGINEERING SERVICES, INDEPENDENT TESTING, CONTRACTOR-ON-SITE MONITORING, AND INDEPENDENT EVALUATION OF PROJECTS AND/OR PROGRAMS, INCLUDING COST, SCHEDULE, AND AFFORDABILITY ANALYSES, IN ANY PHASE OF THE LIFE-CYCLE. INSPECTION,AND ANALYSIS (INCLUDING MODELING AND SIMULATION), AND/OR TEST SHALL BE USED IN EXECUTION OF THIS SUPPORT.$133K
Sep 18, 2018National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG12VN14T541712TO PROVIDE DIRECT SUPPORT TO THE SPACE NETWORK GROUND SEGMENT SUSTAINMENT PROJECT - SERVICES: THE CONTRACTOR SHALL PROVIDE ON/OFF-SITE PROJECT AND MULTIDISCIPLINARY ENGINEERING SERVICES, INDEPENDENT TESTING, CONTRACTOR-ON-SITE MONITORING, AND INDEPENDENT EVALUATION OF PROJECTS AND/OR PROGRAMS, INCLUDING COST, SCHEDULE, AND AFFORDABILITY ANALYSES, IN ANY PHASE OF THE LIFE-CYCLE. THE CONTRACTOR SHALL ALSO PROVIDE LEADERSHIP OR STAFFING FOR FOCUSED SCIENCE AND TECHNOLOGY STUDIES, ADVANCED SYSTEMS ARCHITECTURE, SYSTEMS ENGINEERING AND INDEPENDENT REVIEWS OF ALL ABOVE ACTIVITIES PURSUANT TO TASK ORDERS ISSUED BY THE CONTRACTING OFFICER. THESE SERVICES SHALL INCLUDE THE PERSONNEL, FACILITIES, AND MATERIALS (UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT) TO ACCOMPLISH THE TASKS. TASKS ORDERS WILL BE ISSUED TO PERFORM SERVICES FOR ANY OF GSFC S OR ARC S ORGANIZATIONAL ENTITIES RELATED TO PARTS, COMPONENTS, SOFTWARE, SUBSYSTEMS, SYSTEMS, AND SYSTEMS OF SYSTEMS CIRCUMSCRIBED BY AEROSPACE S CORE FUNCTIONS. TYPES OF NASA ENDEAVORS MAY INCLUDE, BUT ARE NOT LIMITED TO, SPACECRAFT; INSTRUMENTS OR OTHER PAYLOADS; OBSERVATORIES; LAUNCH VEHICLES (FOR SUB-ORBITAL, ORBITAL, LUNAR, OR INTERPLANETARY MISSIONS); LAUNCH ABORT SYSTEMS; ROVERS, LANDERS, OR IMPACT VEHICLES; GROUND SYSTEMS (INCLUDING MISSION OPERATIONS, DATA PROCESSING AND DISSEMINATION, LAUNCH OPERATIONS, ETC.); FACILITIES (E.G. RESEARCH, TEST, LAUNCH); SPACE AND GROUND NETWORKS; BALLOONS; GROUND SUPPORT EQUIPMENT; SIMULATORS; AND NON-FLIGHT MODELS OR PROTOTYPES. ASSESSMENTS MAY INCLUDE SUPPORT (DIRECT OR INDIRECT) TO ARCHITECTURE AND SYSTEMS DEFINITION; STRATEGIC PLANNING AND TECHNOLOGY ROAD-MAPPING; PERFORMANCE EVALUATION OR TRADES STUDIES (INCLUDING TECHNICAL, COST, SCHEDULE, AND/OR RISK); ACQUISITION AND PROJECT MANAGEMENT; SYSTEMS ENGINEERING; DESIGN ANALYSIS (PRELIMINARY OR DETAILED DESIGN); ASSEMBLY, INTEGRATION, AND TEST; REQUIREMENTS VERIFICATION; TEST INSTRUMENTATION; DATA SYSTEMS MANAGEMENT; LAUNCH AND POST-LAUNCH OPERATIONS; MISSION ASSURANCE (INCLUDING LAUNCH VERIFICATION); SYSTEMS SAFETY; RESEARCH AND TECHNOLOGY; DOCUMENTATION; MAINTENANCE; SUSTAINING ENGINEERING; SPECTRUM MANAGEMENT; CONFIGURATION MANAGEMENT, AND OTHERS. INDEPENDENT INSPECTION, ANALYSIS (INCLUDING MODELING AND SIMULATION), AND/OR TEST SHALL BE USED IN EXECUTION OF THIS SUPPORT. THE CONTRACTOR SHALL ALSO ENSURE THAT SUPPORT IS PROVIDED THAT HAS SIGNIFICANT WORKING KNOWLEDGE OF CURRENT AND NEAR FUTURE TECHNOLOGIES THAT APPLY TO MODERNIZING THIS GROUND SYSTEM.$150K
Sep 18, 2018National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG14VN54T541712IGF::OT::IGF ENGINEERING SUPPORT SERVICES: JPSS SPACE ASSET PROGRAM (SAPP) SUPPORT. THE SPACE ASSET PROTECTION PROGRAM HAS MANY ENGINEERING WORK ITEMS THAT NEED TO BE FINISHED IN A RELATIVELY SHORT PERIOD OF TIME AND REQUIRE PROTECTION EXPERTISE TO ACCOMPLISH THEM QUICKLY. THE PURPOSE OF THIS TASK IS TO TAP INTO THE AEROSPACE CORPORATION S PROTECTION EXPERTISE IN ORDER TO ENABLE THE RAPID COMPLETION OF SOME OF THESE ITEMS. THE CONTRACTOR SHALL ASSIST THE GOVERNMENT IN DEVELOPING AND IMPLEMENTING PROCEDURES FOR ANOMALY DETECTION, CHARACTERIZATION AND REPORTING. THE CONTRACTOR SHALL USE THE US GEOLOGICAL SURVEY (USGS) LANDSAT-7 SPACE AND GROUND SEGMENTS AS THE SUBJECT OF THE PROCEDURE. DEVELOP ANOMALY DETECTION AND CHARACTERIZATION PROCESS AND PROCEDURE. DEVELOP SIGNATURES ASSOCIATED WITH SELECTED COUNTER SPACE EVENTS. THE CONTRACTOR WILL COMPARE SIGNATURES BETWEEN COUNTER SPACE, SPACE WEATHER AND SPACE SYSTEM HARDWARE EVENTS. IDENTIFY TELEMETRY POINTS NEEDED TO SUFFICIENTLY CAPTURE EACH EVENT SIGNATURE TO ENABLE ANOMALY CHARACTERIZATION AND PROPOSE REPORTING THRESHOLDS FOR SUSPECT COUNTER SPACE EVENTS. THE CONTRACTOR WILL ALSO DEVELOP ANOMALY REPORTING PROCESS AND PROCEDURE AND IDENTIFY MISSION AND EVENT DATA REQUIRED FROM EACH SOURCE. DEVELOP CHECKLISTS OF INSTRUCTIONS FOR MISSION OPERATIONS TEAM AND FOR SAPP IN ADDITION TO AN OVERALL END-TO-END PROCESS DEFINITION AND DEFINE ROLES/PROCEDURES FOR NASA SPECTRUM MANAGEMENT TEAM AND SPACE WEATHER EXPERTS AS APPROPRIATE. DEVELOP NECESSARY REPORTING TEMPLATES AND WORK WITH EXTERNAL AGENCIES TO ENSURE NO DUPLICATION OF EFFORT. BUILD TRAINING MATERIALS WITH INPUT FROM SAPP ON DETECTION, CHARACTERIZATION AND REPORTING OF ANOMALIES. AEROSPACE WILL ALSO PROVIDE TRAINING FOR MISSION S OPERATIONS TEAMS AND TO WORK WITH EXTERNAL AGENCIES TO ENSURE THERE IS A PROCESS FOR ATTRIBUTING ANOMALIES AND/OR CLOSING THE LOOP ON REPORTED ITEMS TO ENSURE EACH ISSUE IS CLOSED APPROPRIATELY. AEROSPACE WILL ALSO POPULATE THE NEN WEBSITE WITH MISSION PRODUCTS RELATED TO ANOMALY REPORTING SO THEY ARE AVAILABLE FOR DOWNLOAD AND SUPPORT PURPOSEFUL INTERFERENCE RESPONSE TEAM (PIRT) EXERCISE ON ANOMALY REPORTING (DATE TBD, EXPECTED DEC 2014). DEVELOP REQUIRED TIMELINE, SCENARIO, CRITERIA, AND PRODUCTS AND SUPPORTING TABLE TOP EXERCISES CONDUCTED IN PREPARATION FOR THE PIRT ACTIVITY (ONE EXPECTED IN SEPT) ARE A REQUIRED DELIVERABLE UNDER THIS TASK. THE CONTRACTOR SHALL ASSIST THE GOVERNMENT IN MODELING THE SOLUTIONS PRESENTED BY EACH NASA CENTER FOR THEIR PROTECTION PATHFINDER EFFORT. THE CONTRACTOR SHALL DOCUMENT THE LESSONS LEARNED CAPTURED BY EACH CENTER. TASK ACTIVITIES INCLUDE BUT ARE NOT LIMITED TO: CAPTURE THE TEMPLATE AND APPROACH USED BY EACH CENTER IN DEVELOPING THEIR PROJECT PROTECTION PLAN (PPP). CAPTURE THE LESSONS LEARNED OBTAINED BY EACH CENTER IN DEVELOPING THEIR PPP. PROPOSE A STANDARDIZED TEMPLATE AND APPROACH FOR DEVELOPING PPPS ACROSS THE AGENCY. RECOMMEND DEVIATIONS AS APPROPRIATE FOR CENTER-UNIQUE CONSIDERATIONS.$50K
Sep 18, 2018National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG17VN76T541712IGF::OT::IGF THE CENTER DIRECTOR AT THE NASA GODDARD SPACE FLIGHT CENTER (GSFC) IS RESPONSIBLE FOR MANAGING THE CENTERS DIVERSE AND COMPLEX RESEARCH AND DEVELOPMENT PORTFOLIO; FORMULATING THE CENTERS FUTURE SCIENCE AND TECHNOLOGY GOALS AND LEADING AN INTEGRATED PROGRAM OF INVESTMENTS AND INITIATIVES ALIGNED TO MEET THOSE GOALS. ACCORDINGLY, AEROSPACE SHALL PROVIDE QUALIFIED TECHNICAL EXPERTISE TO THE GODDARD CENTER DIRECTOR TO CONDUCT ASSESSMENTS OF NASA PROGRAMS AND PROJECTS, PROJECT MANAGEMENT, SCIENCE, ENGINEERING AND TECHNOLOGY IN ACCORDANCE WITH THE PRIORITIES AS ESTABLISHED BY THE CENTER DIRECTOR. THE PRIORITIES MAY CHANGE AS THE CENTER DIRECTORS DISCRETION. AEROSPACE IS TASKED TO PROVIDE KNOWLEDGEABLE OBSERVATIONS IN AREAS REQUESTED BY THE GSFC CENTER DIRECTOR WITH A FOCUS ON PROGRAM EXECUTION AND POTENTIAL RISKS. JWST IS THE PLANNED SUCCESSOR TO THE HUBBLE SPACE TELESCOPE, AND IS A TECHNICALLY CHALLENGING PROJECT TO BUILD A SPACECRAFT CONSISTING OF A 6.5 METER PRIMARY MIRROR AND FOUR PRIMARY INSTRUMENTS OPERATING IN THE INFRARED SPECTRUM AT VERY LOW TEMPERATURES, WHILE ORBITING APPROXIMATELY 1.5 MILLION KILOMETERS FROM THE EARTH. BECAUSE OF THE COMPLEXITY OF THE PROJECT, JWST IS ALREADY SUBJECT TO INDEPENDENT EXTERNAL REVIEWS, AND THIS TEAM IS NOT INTENDED TO DUPLICATE OR CONFIRM THE FINDINGS OF THOSE REVIEWS. THE CONTRACTOR WILL BE A MEMBER OF THE TEAM THAT WILL PROVIDE AN AD HOC ASSESSMENT OF THE PROGRAM FOR THE CENTER DIRECTOR, ANALYZE THE BUDGET, AND WILL IDENTIFY THREATS THAT ARE NOT BEING ASSESSED, IF ANY. EXAMPLES OF THE EFFORTS THAT THE CONTRACTOR WILL PERFORM INCLUDE THE LIST BELOW, BUT WILL NOT BE LIMITED TO: 1. CONDUCT SPECIAL STUDIES AND ANALYSES TO SUPPORT CENTER LEADERSHIP DECISION MAKING. THESE MAY INCLUDE, BUT ARE NOT LIMITED TO: A. ANALYSIS OF ALTERNATIVES AND COST ESTIMATES; AND B. ANALYSIS OF ALTERNATIVES FOR MEASURING PERFORMANCE MANAGEMENT AND SUCCESS FACTOR INDICATORS. 2. ASSESS PROGRAM AND PROJECT SCHEDULES 3. MEETINGS SUPPORTING CLASS C/D MISSIONS 4. DEVELOP AND PRESENT FINDING ON FUTURE LAUNCH VEHICLES 5. SUPPORT THE CENTER ON PRESIDENTIAL TRANSITION ACTIVITIES$132K
Sep 18, 2018National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER80GRC018F0184541712POWER&PROPULSION ELEMENT (PPE) COMMERCIAL SPACECRAFT BUS RELIABILITY STUDY$65K
Sep 13, 2018National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG11VN07T541712INDEPENDENT ASSESSMENT OF SORCE SPACECRAFT BATTERY PERFORMANCE SORCE IS AN EARTH SCIENCE MISSION LAUNCHED IN JANUARY 2003 WITH A FIVE YEAR DESIGN LIFE. AS OF TODAY, THE MISSION IS FULLY OPERATIONAL WITH THE EXCEPTION THAT THE EAGLE- PITCHER PROVIDED NICKEL HYDROGEN BATTERY IS DEGRADING. THE BATTERY IS MADE UP OF 11 COMMON PRESSURE VESSELS (CPVS) WITH 2 ELECTROCHEMICAL CELLS PER PRESSURE VESSEL. EACH OF THE CPVS FALLS INTO ONE OF THREE BASIC CATEGORIES: GOOD CELLS, MARGINAL CELLS AND UNDER-PERFORMING CELLS. FIVE OF THE CPVS ARE PERFORMING VERY WELL, THREE CPVS FALL INTO THE MARGINAL CATEGORY, AND THREE CPVS ARE UNDER-PERFORMING. THE UNDER-PERFORMING CELLS CAUSE THE MAJORITY OF THE REDUCTION IN THE END OF DISCHARGE VOLTAGE RESULTING IN THE NEED TO REDUCE LOAD. EVALUATION AND RECOMMENDATION FOR PROLONG SORCE BATTERY LIFE FROM AN INDEPENDENT EXPERT MAY HELP IN EXTENDING SORCE MISSION TO MEET SCIENCE OBJECTIVES. BATTERY LIFE ESTIMATES ARE ALSO USEFUL IN PLANNING FUTURE MISSIONS FOR CONTINUITY OF SCIENCE AND BUDGETING PURPOSES. THE CONTRACTOR SHALL PROVIDE QUALIFIED TECHNICAL EXPERTISE TO REVIEW SORCE SPACECRAFT BATTERY PERFORMANCE AND ISSUES. THE CONTRACTOR SHALL PERFORM THE FOLLOWING: REVIEW SORCE SPACECRAFT BATTERY PERFORMANCE ON A MONTHLY BASIS UNDERSTAND CURRENT BATTERY MANAGEMENT PLAN AND LIMITATIONS PROVIDE INDEPENDENT BATTERY EXPERTISE TO ASSESS THE SORCE SPACECRAFT BATTERY MANAGEMENT PROVIDE CONSULTATION REGARDING BATTERY ANOMALIES PARTICIPATE IN ANOMALY DISCUSSIONS VIA TELECONFERENCE ADVISE ON BEST APPROACH TO PROLONG SORCE SPACECRAFT BATTERY LIFE THE CONTRACTOR WILL INTERFACE WITH MEMBERS OF THE ANOMALY RESOLUTION TEAM (ART) WHICH INCLUDES EARTH SCIENCE MISSION OPERATIONS PROJECT MANAGEMENT, SORCE MISSION DIRECTOR, GODDARD SPACE FLIGHT CENTER S APPLIED ENGINEERING AND TECHNOLOGY DIRECTORATE (AETD), MISSION ASSURANCE, ORBITAL SCIENCES CORPORATION SPACECRAFT MANUFACTURER SYSTEM ENGINEERS AND THE LABORATORY FOR ATMOSPHERIC AND SPACE PHYSICS (LASP) OPERATIONS TEAM. THE CONTRACTOR SHALL PROVIDE RECOMMENDATIONS EITHER VERBAL DURING TELECONFERENCES OR EMAIL TO THE ANOMALY RESOLUTION TEAM.$6K
Sep 13, 2018National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER80ARC018F0130541712SUPPORT FOR CUBE QUEST CHALLENGE$70K
Sep 13, 2018National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC18F0127541712THE SUSTAINABLE LAND IMAGING SLI PROGRAM WAS ESTABLISHED AS AN INTERAGENCY PARTNERSHIP BETWEEN NASA AND USGS IN 2014 TO ENSURE CONTINUITY OF MODERATE RESOLUTION, LANDSAT LIKE LAND OBSERVATIONS FOR THE FOLLOWING 30 YEARS. LANDSAT 9, THE FIRST SLI MISSION, IS UNDER DEVELOPMENT AND IS SCHEDULED TO LAUNCH IN DECEMBER 2020. NASA AND USGS ARE NOW STARTING TO DISCUSS OPTIONS FOR LANDSAT 9 FOLLOW ON. AN ARCHITECTURE STUDIES TEAM AST IS BEING SET UP IN ORDER TO ASSESS USER NEEDS, INSTRUMENT OPTIONS, AND MISSION ARCHITECTURES FOR FUTURE SLI MISSIONS. IN GENERAL, THE AST IS CHARTERED TO PROVIDE A SMALL NUMBER OF MISSION CONFIGURATIONS THAT MAXIMIZE SATISFACTION OF USER NEEDS WHILE MAINTAINING COST CONSTRAINTS FOR BOTH THE SPACE AND GROUND SYSTEM SEGMENTS. THE AST CONSISTS OF NASA, USGS, AND AEROSPACE PERSONNEL ABOUT 10 MEMBERS AND ACTIVITIES WILL EXTEND THROUGH SUMMER 2019. A KEY PART OF THE ASTS WORK IS TO ASSESS THE COST AND RISK INCLUDING TRL OF ANY POTENTIAL MISSION SOLUTION. IN ADDITION, THE AST WILL RECOMMEND BUSINESS MODELS TO HELP ENSURE A SUSTAINABLE PROGRAM. THESE MIGHT INCLUDE BLOCK BUYS OF INSTRUMENTS OR SATELLITES, USE OF SECONDARY OR HOSTED PAYLOADS, INTERNATIONAL PARTNERSHIPS, COMMERCIAL DATA PURCHASE, AND OR REDUCED GOVERNMENT OVERSIGHT. THIS TASK PROVIDES SUPPORT FOR AEROSPACE COST MODELING, RISK ASSESSMENT, AND BUSINESS MODEL ASSESSMENT TO SUPPORT THE LANDSAT SLI AST.$40K
Sep 13, 2018National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER80MSFC18F0058541712TECHNICAL ANALYSES AND ASSESSMENTS SERVICES FOR THE SPACE LAUNCH SYSTEM$105K
Sep 12, 2018National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG13VN43T541712IGF::OT::IGF FUNDS FOR JPSS-GROUND DATA PRODUCTS ENGINEER SUPPORT. ACQUISITION OF SPECIALIZED ENGINEERING, EVALUATION AND TEST SERVICES FOR THE NASA JPSS DATA PRODUCTS GROUPS RELATED TO THE DEVELOPMENT AND VERIFICATION OF JPSS CGS OPERATIONAL ALGORITHMS UNDER DPA AND DPE. THE CONTRACTOR SHALL PROVIDE ENGINEERING SUBJECT MATTER EXPERTISE AND PROJECT MONITORING COMMUNICATION AND COORDINATION BOTH WITHIN THE JPSS PROJECT AND WITH EXTERNAL PROVIDERS TO ASSURE CORRECT PRODUCTION OF JPSS GROUND INTERFACE DATA PROCESSING SEGMENT (IDPS) AND FIELD TERMINAL SEGMENT (FTS) OPERATIONAL DATA PRODUCTS IN SUPPORT OF THE DATA PRODUCTS ENGINEERING (DPE) AND DPA ACTIVITIES PROVIDE ENGINEERING TECHNICAL SUBJECT MATTER EXPERTISE IN JPSS ALGORITHM INTEGRATION PROCESSES FOR THE IDPS/FTS OPERATIONAL SCIENCE ALGORITHMS. ASSESS SEVERITY OF REPORTED DISCREPANCIES AND ADVISE DATA PRODUCTS LEADERSHIP OF TECHNICAL IMPACT. ASSIST IN THE DOCUMENTATION OF ALGORITHMS AND TECHNICAL REPORTS SUCH AS ALGORITHM THEORETICAL BASIS DOCUMENTS (ATBDS), OPERATIONAL ALGORITHM DOCUMENTS (OADS), TECHNICAL REPORTS, AND DATA GUIDES. WORK WITH THE DPE ALGORITHM INTEGRATION TEAM (AIT) TO FACILITATE INTERACTION BETWEEN THE INVESTIGATORS AND THE JPSS GROUND PROJECT SYSTEMS AND PROCESSES AND ASSIST INVESTIGATORS IN THE USE OF JPSS GROUND PROJECT SYSTEMS AND PROCESSES. ASSIST THE ALGORITHM AND VALIDATION TEAMS IN INTEGRATION AND OPERATION OF ALGORITHM SUPPORT FUNCTION (ASF) AND CALIBRATION/VALIDATION AND LONG TERM MONITORING (LTM) TOOLS. ASSIST VALIDATING THE OPERATION SCIENCE PRODUCTS INCLUDING THE VIIRS CLOUD MASK, THE JPSS DIRECT READOUT PRODUCTS AND OTHER SOFTWARE DELIVERED FOR THE ALGORITHM SCIENCE TEAMS. DESIGN AND DEVELOP ANALYTICAL TECHNIQUES AND PROCEDURES TO PERFORM INDEPENDENT ASSESSMENT OF CONTRACTOR PERFORM. PROVIDE, AS NEEDED, EXPERTISE IN THE PHYSICAL SCIENCES INCLUDING ATMOSPHERIC AND SPACE PHYSICS, COMMUNICATIONS AND NETWORKING, COMPUTERS AND SOFTWARE, SYSTEMS ENGINEERING SENSOR MODELING SUPPORT. INTERFACE AS NEEDED, WITH INTEGRATED PRODUCT TEAMS, USERS LIAISONS AND INTERNATIONAL LIAISONS TO ASSIST IN THE CLARIFICATION OF REQUIREMENTS, SYSTEM INTERFACE DEFINITION, INTERFACE COMPLIANCE AND OVERALL SYSTEM REQUIREMENTS SATISFACTION.$170K
Sep 12, 2018National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG14VN52T541712IGF::OT::IGF JPSS SPACE ASSET PROTECTION PROGRAM (SAPP) SUPPORT. THE CONTRACTOR WILL PROVIDE SYSTEM ENGINEERING SUPPORT. REVIEW AND PERFORM ANALYSIS TO INFORM ARCHITECTURE DESIGN DECISIONS. CONDUCT ANALYSIS OF THE MISSION. IMPLEMENT THREAT DETECTION AND MITIGATION OPTIONS AND ADVISE THE SAPP AND JPSS-2 PERSONNEL. IDENTIFY AND DOCUMENT LESSONS LEARNED FROM THE BEGINNING TO THE END OF THE TASK. PROVIDE PERSONNEL CAPABLE OF REVIEWING AND ASSESSING MATERIAL. CONSULT WITH SAPP TO ENSURE THAT PRODUCTS ARE APPROPRIATELY CLASSIFIED. THE JOINT POLAR SATELLITE SYSTEM-2 (JPSS-2) MISSION IS JOINTLY IMPLEMENTED BY THE NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION (NOAA) AND THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AS AN OPERATIONAL MISSION PROVIDING ENVIRONMENTAL SENSING FROM A POLAR SUN-SYNCHRONOUS ORBIT, IN ORDER TO MEET THE NATIONAL NEEDS FOR WEATHER AND CLIMATE INFORMATION. THE JPSS-2 MISSION COLLECTS AND TRANSMITS STORED MISSION DATA. THE CONTRACTOR SHALL REVIEW JPSS-2 MISSION FAULT TREE ANALYSES (FTA) AND PROBABILISTIC RISK ASSESSMENTS (PRA) AND PERFORM A SPACE ASSET PROTECTION GAP-ANALYSIS TO INFORM ARCHITECTURE DESIGN DECISIONS. PRIORITIZE MALICIOUS RISKS AND PROVIDE DETECTION AND MITIGATION OPTIONS.$420K
Sep 12, 2018Department of CommerceDEPT OF COMMERCE NOAADOCT0006541712IGF::OT::IGF FFRDC SUPPORT. AWARD OF TASK ORDER FOR OSGS / PETD.$693K
Sep 12, 2018Department of CommerceDEPT OF COMMERCE NOAADOCT0010541712IGF::OT::IGF FFRDC SUPPORT. TASK ORDER AWARD FOR THE CLASS PROGRAM OFFICE.$700K
Sep 11, 2018National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG12VN31T541712IGF::OT::IGF OTHER FUNCTIONS. ENGINEERING AND SERVICES. 2. PURPOSE, OBJECTIVE, AND BACKGROUND OF WORK TO BE PERFORMED: NASA'S OBJECTIVE IS TO OBTAIN AN INDEPENDENT ASSESSMENT OF THE SECURITY RISKS INHERENT IN THE DESIGN, OPERATION AND MAINTENANCE OF SPACE NETWORK GROUND SYSTEMS LOCATED AT THE WHITE SANDS COMPLEX (WSC) IN LAS CRUCES, NEW MEXICO. THESE SYSTEMS HANDLE SENSITIVE BUT UNCLASSIFIED DATA FOR VARIOUS NASA CUSTOMERS HAVING A DESIRE TO ENSURE ADEQUATE CONTROL AND PROTECTION OF THEIR MISSION CRITICAL DATA. 3. DESCRIPTION OF THE WORK TO BE PERFORMED: AEROSPACE WILL PERFORM THE FOLLOWING SUBTASKS: 3.1. AEROSPACE WILL CONDUCT AN ANNUAL PENETRATION TEST OF THE ANCC AT THE GSFC WHITE SANDS COMPLEX. AEROSPACE WILL COORDINATE THE TIME AND PROCEDURES FOR THE PENETRATION TEST WITH THE WHITE SANDS COMPLEX IT SECURITY PERSONNEL. (NOTE: PENETRATION TEST PROCEDURES ARE BUILT BY THE CONTRACTOR AND APPROVED BY NASA). 3.2. AEROSPACE WILL INVESTIGATE, EVALUATE, AND PROVIDE RECOMMENDED SOLUTIONS TO IT SECURITY ISSUES ASSOCIATED WITH UPGRADES TO SN SYSTEMS. AEROSPACE WILL EVALUATE SGSS APPROACHES WITH RESPECT TO INFORMATION ASSURANCE FOR THE SPACE NETWORK PROJECT, AND PERFORM OTHER INFORMATION ASSURANCE RELATED TASKS IN SUPPORT OF THE SPACE NETWORK AS DIRECTED BY THE GOVERNMENT NASA SPONSOR. 4. DELIVERABLES/MILESTONES: AEROSPACE WILL PROVIDE THE FOLLOWING DELIVERABLES FOR THEIR ASSOCIATED SUBTASK: SUBTASK 3.1 A) AN EXIT BRIEFING TO WSC SECURITY IMMEDIATELY FOLLOWING THE PERFORMANCE OF THE ON-SITE PORTION OF THE PENETRATION TEST B) A SUMMARY SLIDE PACKAGE FOR THE PURPOSE OF BRIEFING MANAGEMENT AND SECURITY ORGANIZATIONS. (1 MONTH AFTER TEST) C) A FINAL WRITTEN REPORT DELINEATING THE PROCESS AND FINDINGS. (3 MONTH AFTER TEST) SUBTASK 3.2 A) A SUMMARY OF FINDINGS TO THE TM FOLLOWING EACH MAJOR REVIEW WITHIN 2 WEEKS AFTER THE REVIEW. B) AS NEEDED, A SUMMARY BRIEFING, SUITABLE FOR MANAGEMENT, DETAILING SPECIFIC ISSUES AND CONCERNS AS THEY ARE UNCOVERED. C) AN INFORMAL SUMMARY OF ACTIVITIES AND FINDINGS TO THE TM EACH MONTH.$115K
Sep 11, 2018National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTERNNL16AB20T541330IGF::OT::IGF " INDEPENDENT ANALYSES: MODELING AND SIMULATION TOOL ASSESSMENT AND INDEPENDENT ASSESSMENT AND ENGINEERING SERVICES: COMPARISON OF TECHNOLOGY ALTERNATIVES " - THE SCOPE OF THIS EFFORT IS FOR THE CONTRACTOR TO PERFORM INDEPENDENT ANALYSES, USING THEIR UNIQUE MODELING AND SIMULATION TOOLS, TO INDEPENDENTLY VERIFY AND ASSESS THE PERFORMANCE OF A SUITE OF GOVERNMENT OWNED AND DEVELOPED MODELING TOOLS. ADDITIONALLY THE CONTRACTOR WILL UTILIZE THEIR TOOLS IN ASSISTING NASA IN ANALYSIS OF TECHNOLOGY ALTERNATIVES.$24K
Sep 11, 2018National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER80GRC018F0125541712RESIDUAL RELIABILITY RISK ASSESSMENT ON THE UTILIZATION OF MILITARY SPACECRAFT BUS ARCHITECTURES FOR CRITICAL NASA MISSIONS.$20K
Sep 11, 2018National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER80GRC018F0180541712NEXTCOMM EARTH RELAY MISSION FORMULATION STUDIES$8K
Sep 11, 2018Department of CommerceDEPT OF COMMERCE NOAADOCT0011541712IGF::OT::IGF FFRDC SUPPORT. TASK ORDER AWARD.$142K
Sep 11, 2018Department of CommerceDEPT OF COMMERCE NOAADOCT0013541712IGF::OT::IGF FFRDC SUPPORT. AWARD OF FOLLOW-ON TASK ORDER TO TO 03 FOR THE STAR PROGRAM OFFICE$156K
Sep 11, 2018Department of the InteriorOFC OF ACQUSITION GRANTS-NATIONALING16PC00011541330IGF::OT::IGF ENGINEERING SUPPORT FOR LANDSAT 7, 8, AND 9$226K
Sep 4, 2018Department of DefenseFA8802 INTEGRATION OPERATION PIKPKEFA880214C0001541712IGF::CL::IGF AEROSPACE FFRDC CONTRACT FROM 1 OCT 2013 TO 30 SEPT 2018$31M
Aug 31, 2018National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER80KSC018F0224541712BENCHMARKING STUDY AND APPLICABLE OBSERVATION OF INSTITUTIONAL, PROJECT AND PROGRAMMATIC PROCESSES FOR RISK MANAGEMENT, VEHICLE CERTIFICATION, AND CERTIFICATION OF FLIGHT READINESS COFR REQUIREMENTS PAGE$263K
Aug 30, 2018National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG12VN13T541712AWARD ENTITLED "SPACE NETWORK RELIABILITY AND LOADING ANALYSIS" RISK ANALYSIS AND SECURITY EVALUATION FOR SPACE NETWORK. THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER (GSFC) IS RESPONSIBLE FOR PROJECT MANAGEMENT OF THE NASA TRACKING AND DATA RELAY SATELLITE SYSTEM (TDRSS) INCLUDING DEVELOPMENT AND OPERATIONS OF THE SPACE CONSTELLATION ASSETS AS WELL AS THE GROUND SYSTEM ASSETS. THIS TASK ASSISTS THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) IN PREDICATING THE FUTURE HEALTH OF THE TDRS SATELLITES IN ORBIT, AND PREDICATING THE ABILITY OF THE SPACE NETWORK TO MEET FUTURE USER REQUIREMENTS. THIS IS AN ONGOING EFFORT THAT HAS OCCURRED YEARLY FOR AT LEAST THE LAST TEN YEARS. DESCRIPTION OF WORK TO BE PERFORMED 1. THE CONTRACTOR WILL UPDATE AND MAINTAIN THE TRACKING AND DATA RELAY SATELLITE SYSTEM (TDRS) FLEET RELIABILITY AND SERVICE AVAILABILITY MODEL; CONDUCT REPLENISHMENT ANALYSES (GAP ANALYSES) ON THE TDRSS CONSTELLATION; 2. THE CONTRACTOR WILL DEVELOP AND MAINTAIN THE USER MISSION MODEL; DEVELOP, UPDATE AND MAINTAIN LOADING ANALYSES BASED ON THE MISSION MODEL; 3. THE CONTRACTOR WILL SUPPORT THE SPACE COMMUNICATIONS CONTROL BOARD OF THE SPACE COMMUNICATIONS AND NAVIGATION OFFICE. THIS SUPPORT WILL REQUIRE ATTENDANCE AT MEETINGS AT GODDARD FACILITIES AS WELL AS OTHER GOVERNMENT FACILITIES, THUS TRAVEL IS AUTHORIZED. DELIVERABLES/MILESTONES THE CONTRACTOR WILL DELIVER RESULTS OF THE TRACKING AND DATA RELAY SATELLITE SYSTEM (TDRS) RELIABILITY ANALYSIS THE CONTRACTOR WILL DELIVER A UNCLASSIFIED FINAL REPORT FOR USER LOADING ANALYSIS THE CONTRACTOR WILL DELIVER A CLASSIFIED FINAL REPORT FOR USER LOADING ANALYSIS. TO THIS END, THE CONTRACTOR SHALL PROVIDE ON/OFF-SITE PROJECT AND MULTIDISCIPLINARY ENGINEERING SERVICES, INDEPENDENT TESTING, CONTRACTOR-ON-SITE MONITORING, AND INDEPENDENT EVALUATION OF PROJECTS AND/OR PROGRAMS, INCLUDING COST, SCHEDULE, AND AFFORDABILITY ANALYSES, IN ANY PHASE OF THE LIFE-CYCLE. INSPECTION,AND ANALYSIS (INCLUDING MODELING AND SIMULATION), AND/OR TEST SHALL BE USED IN EXECUTION OF THIS SUPPORT.$146
Aug 30, 2018National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM16AA12T541690IGF::OT::IGF THE AEROSPACE CORPORATION WILL PROVIDE TECHNICAL ANALYSIS AND ASSESSMENT SERVICES TO ASSIST IN TECHNICALLY EVALUATING UNITED LAUNCH ALLIANCE (ULA) WORK ON THE SPACE LAUNCH SYSTEMS (SLS) INTERIM CRYOGENIC PROPULSIONS SYSTEM (ICPS). SPECIFICALLY, AEROSPACE WILL PROVIDE SPACECRAFT/PAYLOAD INTEGRATION AND EVOLUTION (SPIE) WITH TECHNICAL EVALUATIONS PERTAINING TO THE READINESS OF ULA ICPS FLIGHT SOFTWARE.$200K
Aug 30, 2018National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC17F0017541712IGF::OT::IGF LANDSAT GROUND AND MISSION OPERATIONS SYSTEMS ENGINEERING SUPPORT$48K
Aug 30, 2018National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC18F0122541712SMALLSATS FROM CUBESATS UP TO ABOUT 500 KG SATELLITES ARE A VIBRANT AND GROWING SEGMENT OF THE OVERALL SATELLITE INDUSTRY. CUBESATS IN PARTICULAR STARTED OUT AS UNIVERSITY PROJECTS BUT NOW US GOVERNMENT ENTITIES SUCH AS NASA THE AIR FORCE RESEARCH LABORATORY AFR THE NAVY THE ARMY THE AIR FORCE SPACE AND MISSILE SYSTEMS CENTER SMC THE NATIONAL RECONNAISSANCE OFFICE NRO ETC ARE BUILDING AND LAUNCHING SMALL SATELLITES. SMC IN PARTICULARWANTS TO UNDERSTAND THE REQUIREMENTS THAT GET FLOWED TO SUB TIER SUPPLIERS FROM ENTITIES SUCH AS ONEWEB, OPERATIONALLY RESPONSIVE SPACE ORS PROGRAMS, AND ANY OTHER SMALL SATELLITE NOT CUBESAT PROGRAMS. BUILD ON SOME OF THE WORK STARTED BY THE JET PROPULSION LABORATORY JPL IN EXAMINING ELECTRICAL, ELECTRONIC, AND ELECTROMECHANICAL EEE PARTS USAGE ON SMALLSAT PROGRAMS TO DETERMINE WHAT THE POTENTIAL EFFECTS ON THE SPACE INDUSTRIAL BASE COULD BE. THERE IS A CONCERN THAT THE GROWING SMALLSAT INDUSTRY COULD PUT MORE PRESSURE ON ALREADY FRAGILE COMPANIES SUPPLYING SPACE GRADE PARTS TO THE CURRENT LARGER SATELLITE PROGRAMS. WHILE SMALLSATS ARE AN IMPORTANT AND GROWING SEGMENT OF THE OVERALL SATELLITE AND LAUNCH INDUSTRY, THE LARGER SATELLITES ARE NOT GOING TO VANISH AS THERE ARE PROGRAMS THAT SIMPLY CANNOT BE DONE WITH SMALL SATELLITES, SUCH AS HIGH POWER COMMUNICATIONS AND BROADCAST.$150K

Get Alerted Before The Aerospace Corporation's Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.

Start Free