Home/Contractors/The Trustees Of Princeton University/contracts

Federal Contractor Profile

The Trustees Of Princeton University

$1.6B obligated·50 awards·11 agencies·15 NAICS

Federal Contracts

Showing contracts 201250 of 266 total. Sorted by action date, most recent first. Excludes $0 modifications.

DateAgencyPIIDNAICSDescriptionAmount
Feb 22, 2018Department of EnergySC CHICAGO SERVICE CENTERDEAC0209CH11466611310MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL)$4.4M
Feb 8, 2018Department of EnergySC CHICAGO SERVICE CENTERDEAC0209CH11466611310MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL)$5.1M
Feb 6, 2018National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG17FC93C334511IGF::OT::IGF THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS.$300K
Jan 23, 2018Department of EnergySC CHICAGO SERVICE CENTERDEAC0209CH11466611310MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL)$4.7M
Jan 23, 2018Department of DefenseNAVSUP FLT LOG CTR SAN DIEGON0024418F0150611710IGF::OT::IGF TUTION AND FEES$49K
Dec 20, 2017Department of EnergySC CHICAGO SERVICE CENTERDEAC0209CH11466611310MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL)$422K
Nov 30, 2017National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG17FC93C334511IGF::OT::IGF THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS.$200K
Nov 27, 2017Department of EnergySC CHICAGO SERVICE CENTERDEAC0209CH11466611310MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL)$73K
Nov 8, 2017National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG17FC93C334511IGF::OT::IGF THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS.$17K
Oct 26, 2017Department of EnergySC CHICAGO SERVICE CENTERDEAC0209CH11466611310MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL)$6.2M
Sep 26, 2017Department of EnergySC CHICAGO SERVICE CENTERDEAC0209CH11466611310MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL)$329K
Sep 26, 2017Department of EnergySC CHICAGO SERVICE CENTERDEAC0209CH11466611310MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL)$12M
Sep 16, 2017Department of StateACQUISITIONS - AQM MOMENTUMSAQMMA17M1785541990POC: DANIEL WURMSER 202-647-0854 APPROVAL FLOW EDIT: WILLIAM R SHOBERT ADDED BY ANGELA MINOR ON TUE SEP 12 13:03:27 EDT 2017 REASON ADDED: CHIEF OF STAFF APPROVAL REQUIRED IGF::CL::IGF$140K
Sep 14, 2017Department of DefenseDEFENSE THREAT REDUCTION AGENCYHDTRA116C0025541711IGF::OT::IGF BASE PERIOD: ULTRASENSITIVE RAPID EBOLA VIRUS ANTIGEN DIAGNOSTIC ASSAY$1.0M
Sep 1, 2017Department of Health and Human ServicesNATIONAL INSTITUTES OF HEALTH NIDAHHSN271201700593P611310IGF::OT::IGF PROFESSIONAL SERVICES OF DR. NIV$20K
Aug 28, 2017Department of EnergySC CHICAGO SERVICE CENTERDEAC0209CH11466611310MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL)$5.0M
Jul 31, 2017Department of EnergySC CHICAGO SERVICE CENTERDEAC0209CH11466611310MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL)$311K
Jul 27, 2017Department of EnergySC CHICAGO SERVICE CENTERDEAC0209CH11466611310MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL)$23M
Jul 19, 2017Department of DefenseNAVAL MEDICAL RESEARCH CENTERN3239817P0342541712IGF::OT::IGF SHIP 24 HUMAN MICE LIVER.$93K
Jul 18, 2017Department of DefenseNAVSUP FLT LOG CTR SAN DIEGON0024417F0304611710IGF::OT::IGF TUTION AND FEES$52K
Jun 28, 2017Department of EnergySC CHICAGO SERVICE CENTERDEAC0209CH11466611310MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL)$6.8M
Jun 14, 2017National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG17FC93C334511IGF::OT::IGF THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS.$892K
Jun 8, 2017National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTERNNX17GG26P611310IGF::OT::IGF SUPERFLEX CABLE$22K
Jun 7, 2017Department of EnergySC CHICAGO SERVICE CENTERDEAC0209CH11466611310MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL)$130K
May 30, 2017Department of EnergySC CHICAGO SERVICE CENTERDEAC0209CH11466611310MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL)$3.2M
May 30, 2017Department of EnergySC CHICAGO SERVICE CENTERDEAC0209CH11466611310MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL)$138K
May 23, 2017Department of the InteriorIBC ACQ SVCS DIRECTORATE (00004)00063200307DNBCHC030106541710$169K
Apr 24, 2017Department of EnergySC CHICAGO SERVICE CENTERDEAC0209CH11466611310MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL)$176K
Mar 28, 2017Department of EnergySC CHICAGO SERVICE CENTERDEAC0209CH11466611310MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL)$80K
Mar 23, 2017National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG17FC93C334511IGF::OT::IGF THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS.$1.1M
Mar 9, 2017Department of DefenseNAVAL MEDICAL RESEARCH CENTERN3239817P0217541712IGF::OT::IGF (TASK 1: HOUSE 15 BREEDING PAIRS OF MICE FOR 12 MONTHS.$90K
Feb 28, 2017Department of EnergySC CHICAGO SERVICE CENTERDEAC0209CH11466611310MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL)$908K
Feb 3, 2017National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG16PJ29C541712IGF::OT::IGF WFIRST SCIENCE INVESTIGATION TEAMS AND ADJUTANT SCIENTISTS RESEARCH OPPORTUNITIES IN SPACE AND EARTH SCIENCES-2015 (ROSES-2015) NASA RESEARCH ANNOUNCEMENT (NRA) NNH15ZDA001N-WFIRST WAS ISSUED ON JULY 17, 2015. THIS NRA SOLICITED PROPOSALS FOR SCIENCE INVESTIGATION TEAMS (SITS) FOR THE WIDE-FIELD INFRARED SURVEY TELESCOPE (WFIRST), WHICH RESULTED IN THE FORMATION OF A FORMULATION SCIENCE WORKING GROUP (FSWG) FOR THE MISSION. IN ADDITION TO THE WFIRST SITS, THE CALL SOLICITED INDIVIDUALS TO SERVE AS ADJUTANT SCIENTISTS FOR THE WFIRST WIDE-FIELD INSTRUMENT (WFI) AND FOR THE WFIRST CORONAGRAPH INSTRUMENT (CGI). THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING TASKS IN SUPPORT OF WFIRST FORMULATION AND IMPLEMENTATION: COORDINATE THE WORK BEING DONE BY THE SCIENCE INVESTIGATION TEAMS (SITS) ASSOCIATED WITH THE WFIRST CORONAGRAPH INSTRUMENT IN ORDER TO DEVELOP A COHERENT AND COMPREHENSIVE SET OF SCIENTIFIC PERFORMANCE REQUIREMENTS, OBSERVATIONAL STRATEGIES, SCIENCE DATA ANALYSIS TECHNIQUES, PRECURSOR OBSERVATION REQUIREMENTS, GROUND AND FLIGHT CALIBRATION APPROACHES, ANCILLARY DATA COLLECTION/INCORPORATION, ANALYSIS, DISSEMINATION AND DOCUMENTATION OF THE PROPOSED SCIENCE INVESTIGATIONS.$188K
Jan 30, 2017Department of EnergySC CHICAGO SERVICE CENTERDEAC0209CH11466611310MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL)$943K
Jan 25, 2017Department of DefenseDEFENSE THREAT REDUCTION AGENCYHDTRA116C0025541711IGF::OT::IGF BASE PERIOD: ULTRASENSITIVE RAPID EBOLA VIRUS ANTIGEN DIAGNOSTIC ASSAY$368K
Jan 24, 2017National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG16PJ30C541712IGF::OT::IGF WFIRST SCIENCE INVESTIGATION TEAMS AND ADJUTANT SCIENTISTS RESEARCH OPPORTUNITIES IN SPACE AND EARTH SCIENCES-2015 (ROSES-2015) NASA RESEARCH ANNOUNCEMENT (NRA) NNH15ZDA001N-WFIRST WAS ISSUED ON JULY 17, 2015. THIS NRA SOLICITED PROPOSALS FOR SCIENCE INVESTIGATION TEAMS (SITS) FOR THE WIDE-FIELD INFRARED SURVEY TELESCOPE (WFIRST), WHICH RESULTED IN THE FORMATION OF A FORMULATION SCIENCE WORKING GROUP (FSWG) FOR THE MISSION. IN ADDITION TO THE WFIRST SITS, THE CALL SOLICITED INDIVIDUALS TO SERVE AS ADJUTANT SCIENTISTS FOR THE WFIRST WIDE-FIELD INSTRUMENT (WFI) AND FOR THE WFIRST CORONAGRAPH INSTRUMENT (CGI). THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING TASKS IN SUPPORT OF WFIRST FORMULATION AND IMPLEMENTATION: COORDINATE THE WORK BEING DONE BY THE SCIENCE INVESTIGATION TEAMS (SITS) ASSOCIATED WITH THE WFIRST WIDE-FIELD IMAGER IN ORDER TO DEVELOP A COHERENT AND COMPREHENSIVE SET OF SCIENTIFIC PERFORMANCE REQUIREMENTS, OBSERVATIONAL STRATEGIES, SCIENCE DATA ANALYSIS TECHNIQUES, PRECURSOR OBSERVATION REQUIREMENTS, GROUND AND FLIGHT CALIBRATION APPROACHES, ANCILLARY DATA COLLECTION/INCORPORATION, ANALYSIS, DISSEMINATION AND DOCUMENTATION OF THE PROPOSED SCIENCE INVESTIGATIONS.$288K
Jan 6, 2017Department of Health and Human ServicesNATIONAL INSTITUTES OF HEALTH NIDAHHSN271201700107P611310IGF::OT::IGF PROFESSIONAL SERVICES OF DR. NIV AND ASSOCIATED PERSONNEL FOR EXPERIMENTS WILL EMPLOY STATE-OF-THE-ART COMPUTATIONAL MODELING$20K
Dec 22, 2016Department of EnergySC CHICAGO SERVICE CENTERDEAC0209CH11466611310MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL)$28M
Nov 10, 2016Department of DefenseDEF ADVANCED RESEARCH PROJECTS AGCYHR001116C0027541712IGF::OT::IGF REVOLUTIONARY ENHANCEMENT OF VISIBILITY BY EXPLOITING ACTIVE LIGHT-FIELDS (REVEAL) PROGRAM.$198K
Nov 8, 2016Department of EnergySC CHICAGO SERVICE CENTERDEAC0209CH11466611310MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL)$1.6M
Oct 25, 2016Department of EnergySC CHICAGO SERVICE CENTERDEAC0209CH11466611310MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL)$15M
Sep 27, 2016Department of EnergySC CHICAGO SERVICE CENTERDEAC0209CH11466611310MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL)$1.4M
Sep 27, 2016Department of EnergySC CHICAGO SERVICE CENTERDEAC0209CH11466611310MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL)$559K
Aug 30, 2016Department of EnergySC CHICAGO SERVICE CENTERDEAC0209CH11466611310MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL)$998K
Jul 26, 2016Department of EnergySC CHICAGO SERVICE CENTERDEAC0209CH11466611310MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL)$15M
Jun 29, 2016Department of EnergySC CHICAGO SERVICE CENTERDEAC0209CH11466611310MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL)$146K
Jun 29, 2016Department of EnergySC CHICAGO SERVICE CENTERDEAC0209CH11466611310MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL)$29M
May 24, 2016Department of EnergySC CHICAGO SERVICE CENTERDEAC0209CH11466611310MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL)$8.6M
May 24, 2016Department of EnergySC CHICAGO SERVICE CENTERDEAC0209CH11466611310MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL)$12K
May 18, 2016Department of DefenseDEFENSE THREAT REDUCTION AGENCYHDTRA116C0025541711IGF::OT::IGF BASE PERIOD: ULTRASENSITIVE RAPID EBOLA VIRUS ANTIGEN DIAGNOSTIC ASSAY$312K

Get Alerted Before The Trustees Of Princeton University's Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.

Start Free