Federal Contractor Profile
The Trustees Of Princeton University
$1.6B obligated·50 awards·11 agencies·15 NAICS
Federal Contracts
Showing contracts 201–250 of 266 total. Sorted by action date, most recent first. Excludes $0 modifications.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Feb 22, 2018 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $4.4M |
| Feb 8, 2018 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $5.1M |
| Feb 6, 2018 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG17FC93C | 334511 | IGF::OT::IGF THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. | $300K |
| Jan 23, 2018 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $4.7M |
| Jan 23, 2018 | Department of DefenseNAVSUP FLT LOG CTR SAN DIEGO | N0024418F0150 | 611710 | IGF::OT::IGF TUTION AND FEES | $49K |
| Dec 20, 2017 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $422K |
| Nov 30, 2017 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG17FC93C | 334511 | IGF::OT::IGF THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. | $200K |
| Nov 27, 2017 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $73K |
| Nov 8, 2017 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG17FC93C | 334511 | IGF::OT::IGF THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. | $17K |
| Oct 26, 2017 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $6.2M |
| Sep 26, 2017 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $329K |
| Sep 26, 2017 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $12M |
| Sep 16, 2017 | Department of StateACQUISITIONS - AQM MOMENTUM | SAQMMA17M1785 | 541990 | POC: DANIEL WURMSER 202-647-0854 APPROVAL FLOW EDIT: WILLIAM R SHOBERT ADDED BY ANGELA MINOR ON TUE SEP 12 13:03:27 EDT 2017 REASON ADDED: CHIEF OF STAFF APPROVAL REQUIRED IGF::CL::IGF | $140K |
| Sep 14, 2017 | Department of DefenseDEFENSE THREAT REDUCTION AGENCY | HDTRA116C0025 | 541711 | IGF::OT::IGF BASE PERIOD: ULTRASENSITIVE RAPID EBOLA VIRUS ANTIGEN DIAGNOSTIC ASSAY | $1.0M |
| Sep 1, 2017 | Department of Health and Human ServicesNATIONAL INSTITUTES OF HEALTH NIDA | HHSN271201700593P | 611310 | IGF::OT::IGF PROFESSIONAL SERVICES OF DR. NIV | $20K |
| Aug 28, 2017 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $5.0M |
| Jul 31, 2017 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $311K |
| Jul 27, 2017 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $23M |
| Jul 19, 2017 | Department of DefenseNAVAL MEDICAL RESEARCH CENTER | N3239817P0342 | 541712 | IGF::OT::IGF SHIP 24 HUMAN MICE LIVER. | $93K |
| Jul 18, 2017 | Department of DefenseNAVSUP FLT LOG CTR SAN DIEGO | N0024417F0304 | 611710 | IGF::OT::IGF TUTION AND FEES | $52K |
| Jun 28, 2017 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $6.8M |
| Jun 14, 2017 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG17FC93C | 334511 | IGF::OT::IGF THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. | $892K |
| Jun 8, 2017 | National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER | NNX17GG26P | 611310 | IGF::OT::IGF SUPERFLEX CABLE | $22K |
| Jun 7, 2017 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $130K |
| May 30, 2017 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $3.2M |
| May 30, 2017 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $138K |
| May 23, 2017 | Department of the InteriorIBC ACQ SVCS DIRECTORATE (00004) | 00063200307DNBCHC030106 | 541710 | — | $169K |
| Apr 24, 2017 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $176K |
| Mar 28, 2017 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $80K |
| Mar 23, 2017 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG17FC93C | 334511 | IGF::OT::IGF THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. | $1.1M |
| Mar 9, 2017 | Department of DefenseNAVAL MEDICAL RESEARCH CENTER | N3239817P0217 | 541712 | IGF::OT::IGF (TASK 1: HOUSE 15 BREEDING PAIRS OF MICE FOR 12 MONTHS. | $90K |
| Feb 28, 2017 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $908K |
| Feb 3, 2017 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG16PJ29C | 541712 | IGF::OT::IGF WFIRST SCIENCE INVESTIGATION TEAMS AND ADJUTANT SCIENTISTS RESEARCH OPPORTUNITIES IN SPACE AND EARTH SCIENCES-2015 (ROSES-2015) NASA RESEARCH ANNOUNCEMENT (NRA) NNH15ZDA001N-WFIRST WAS ISSUED ON JULY 17, 2015. THIS NRA SOLICITED PROPOSALS FOR SCIENCE INVESTIGATION TEAMS (SITS) FOR THE WIDE-FIELD INFRARED SURVEY TELESCOPE (WFIRST), WHICH RESULTED IN THE FORMATION OF A FORMULATION SCIENCE WORKING GROUP (FSWG) FOR THE MISSION. IN ADDITION TO THE WFIRST SITS, THE CALL SOLICITED INDIVIDUALS TO SERVE AS ADJUTANT SCIENTISTS FOR THE WFIRST WIDE-FIELD INSTRUMENT (WFI) AND FOR THE WFIRST CORONAGRAPH INSTRUMENT (CGI). THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING TASKS IN SUPPORT OF WFIRST FORMULATION AND IMPLEMENTATION: COORDINATE THE WORK BEING DONE BY THE SCIENCE INVESTIGATION TEAMS (SITS) ASSOCIATED WITH THE WFIRST CORONAGRAPH INSTRUMENT IN ORDER TO DEVELOP A COHERENT AND COMPREHENSIVE SET OF SCIENTIFIC PERFORMANCE REQUIREMENTS, OBSERVATIONAL STRATEGIES, SCIENCE DATA ANALYSIS TECHNIQUES, PRECURSOR OBSERVATION REQUIREMENTS, GROUND AND FLIGHT CALIBRATION APPROACHES, ANCILLARY DATA COLLECTION/INCORPORATION, ANALYSIS, DISSEMINATION AND DOCUMENTATION OF THE PROPOSED SCIENCE INVESTIGATIONS. | $188K |
| Jan 30, 2017 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $943K |
| Jan 25, 2017 | Department of DefenseDEFENSE THREAT REDUCTION AGENCY | HDTRA116C0025 | 541711 | IGF::OT::IGF BASE PERIOD: ULTRASENSITIVE RAPID EBOLA VIRUS ANTIGEN DIAGNOSTIC ASSAY | $368K |
| Jan 24, 2017 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG16PJ30C | 541712 | IGF::OT::IGF WFIRST SCIENCE INVESTIGATION TEAMS AND ADJUTANT SCIENTISTS RESEARCH OPPORTUNITIES IN SPACE AND EARTH SCIENCES-2015 (ROSES-2015) NASA RESEARCH ANNOUNCEMENT (NRA) NNH15ZDA001N-WFIRST WAS ISSUED ON JULY 17, 2015. THIS NRA SOLICITED PROPOSALS FOR SCIENCE INVESTIGATION TEAMS (SITS) FOR THE WIDE-FIELD INFRARED SURVEY TELESCOPE (WFIRST), WHICH RESULTED IN THE FORMATION OF A FORMULATION SCIENCE WORKING GROUP (FSWG) FOR THE MISSION. IN ADDITION TO THE WFIRST SITS, THE CALL SOLICITED INDIVIDUALS TO SERVE AS ADJUTANT SCIENTISTS FOR THE WFIRST WIDE-FIELD INSTRUMENT (WFI) AND FOR THE WFIRST CORONAGRAPH INSTRUMENT (CGI). THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING TASKS IN SUPPORT OF WFIRST FORMULATION AND IMPLEMENTATION: COORDINATE THE WORK BEING DONE BY THE SCIENCE INVESTIGATION TEAMS (SITS) ASSOCIATED WITH THE WFIRST WIDE-FIELD IMAGER IN ORDER TO DEVELOP A COHERENT AND COMPREHENSIVE SET OF SCIENTIFIC PERFORMANCE REQUIREMENTS, OBSERVATIONAL STRATEGIES, SCIENCE DATA ANALYSIS TECHNIQUES, PRECURSOR OBSERVATION REQUIREMENTS, GROUND AND FLIGHT CALIBRATION APPROACHES, ANCILLARY DATA COLLECTION/INCORPORATION, ANALYSIS, DISSEMINATION AND DOCUMENTATION OF THE PROPOSED SCIENCE INVESTIGATIONS. | $288K |
| Jan 6, 2017 | Department of Health and Human ServicesNATIONAL INSTITUTES OF HEALTH NIDA | HHSN271201700107P | 611310 | IGF::OT::IGF PROFESSIONAL SERVICES OF DR. NIV AND ASSOCIATED PERSONNEL FOR EXPERIMENTS WILL EMPLOY STATE-OF-THE-ART COMPUTATIONAL MODELING | $20K |
| Dec 22, 2016 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $28M |
| Nov 10, 2016 | Department of DefenseDEF ADVANCED RESEARCH PROJECTS AGCY | HR001116C0027 | 541712 | IGF::OT::IGF REVOLUTIONARY ENHANCEMENT OF VISIBILITY BY EXPLOITING ACTIVE LIGHT-FIELDS (REVEAL) PROGRAM. | $198K |
| Nov 8, 2016 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $1.6M |
| Oct 25, 2016 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $15M |
| Sep 27, 2016 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $1.4M |
| Sep 27, 2016 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $559K |
| Aug 30, 2016 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $998K |
| Jul 26, 2016 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $15M |
| Jun 29, 2016 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $146K |
| Jun 29, 2016 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $29M |
| May 24, 2016 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $8.6M |
| May 24, 2016 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $12K |
| May 18, 2016 | Department of DefenseDEFENSE THREAT REDUCTION AGENCY | HDTRA116C0025 | 541711 | IGF::OT::IGF BASE PERIOD: ULTRASENSITIVE RAPID EBOLA VIRUS ANTIGEN DIAGNOSTIC ASSAY | $312K |