The Department of Agriculture is seeking contractors for road repairs on Cone Peak, classified under NAICS 237310, which pertains to highway, street, and bridge construction. This opportunity is a Total Small Business Set-Aside, making it suitable for small businesses. The notice type is a Combined Synopsis/Solicitation, indicating that interested businesses should prepare to both track and potentially bid on the project, adhering to the specified construction standards outlined in the FP-24 document.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
STANDARD
SPECIFICATIONS
FOR CONSTRUCTION OF
ROADS AND BRIDGES
ON FEDERAL HIGHWAY
PROJECTS
FP-24
U.S. Department
of Transportation
Federal Highway
Administration
Federal Lands
Highway
-- 1 of 902 --
Standard Specifications
for Construction of
Roads and Bridges on
Federal Highway Projects
FP-24
UNITED STATES DEPARTMENT
OF TRANSPORTATION
Federal Highway Administration
-- 2 of 902 --
-- 3 of 902 --
-- 4 of 902 --
i
PREFACE
These Standard Specifications for the Construction of Roads and Bridges on Federal Highway Projects
are issued primarily for constructing roads and bridges on Federal Highway projects under the direct
administration of the Federal Highway Administration. These specifications are cited as "FP-24"
indicating "Federal Project" Standard Specifications issued in 2024.
When designated in a contract, the FP-24 becomes part of the contract and binding upon all parties to the
contract. Construction contracts of the Federal Highway Administration are also governed by the
following regulations:
• Federal Acquisition Regulation (FAR), Title 48, Code of Federal Regulations, Chapter 1; and
• Transportation Acquisition Regulation (TAR), Title 48, Code of Federal Regulations, Chapter 12.
The FAR and TAR regulations are not included in the FP-24. A complete copy of the FAR is available
from the Superintendent of Documents, Congressional Sales Office, U.S. Government Publishing Office,
Washington, DC 20402.
U.S. Customary units of measure are used in the FP-24. The references to Metric or Metric units apply
only where standardized testing requires Metric units of measure.
-- 5 of 902 --
ii
METRIC TO U.S. CUSTOMARY CONVERSION FACTORS (approximate)
Symbol When You Know Multiply By To Find Symbol
LENGTH
μm micrometers 3.9 × 10 -5 inches in
mm millimeters 0.039 inches in
m meters 3.28 feet ft
m meters 1.09 yards yd
km kilometers 0.621 miles mi
AREA
mm 2 square millimeters 0.0016 square inches in 2
m 2 square meters 10.764 square feet ft2
m 2 square meters 1.195 square yards yd 2
ha hectares 2.47 acres ac
km 2 square kilometers 0.386 square miles mi2
VOLUME
mL milliliters 0.034 fluid ounces fl oz
L liters 0.264 gallons gal
m 3 cubic meters 35.31 cubic feet ft3
m 3 cubic meters 1.308 cubic yards yd 3
MASS
g grams 0.035 ounces oz
kg kilograms 2.2046 pounds lb
Mg megagrams 1.1023 short tons T
(or "t") (or "metric ton") (2000 lb)
TEMPERATURE (exact)
°C Celsius
temperature
1.8C +32 Fahrenheit
temperature
°F
ILLUMINATION
lx lux 0.0929 foot-candles fc
cd/m 2 candela/m 2 0.2919 foot-Lamberts fl
MISCELLANEOUS
J joule 0.7376 foot·poundforce ft·lbf
N newtons 0.225 poundforce lbf
kPa kilopascals 0.145 Poundforce
per square inch
lbf/in 2
-- 6 of 902 --
iii
Table of Contents
DIVISION 100 GENERAL REQUIREMENTS ..................................................................................1
Section 101. — TERMS, FORMAT, AND DEFINITIONS .................................................................2
Section 102. — BID, AWARD, AND EXECUTION OF CONTRACT ............................................12
Section 103. — SCOPE OF WORK ....................................................................................................14
Section 104. — CONTROL OF WORK .............................................................................................16
Section 105. — CONTROL OF MATERIAL .....................................................................................26
Section 106. — ACCEPTANCE OF WORK ......................................................................................29
Section 107. — LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC ......................40
Section 108. — PROSECUTION AND PROGRESS .........................................................................45
Section 109. — MEASUREMENT AND PAYMENT .......................................................................48
DIVISION 150 PROJECT REQUIREMENTS .................................................................................60
Section 151. — MOBILIZATION ......................................................................................................61
Section 152. — CONSTRUCTION SURVEY AND STAKING .......................................................62
Section 153. — CONTRACTOR QUALITY CONTROL ..................................................................69
Section 154. — CONTRACTOR SAMPLING AND TESTING ........................................................73
Section 155. — SCHEDULES FOR CONSTRUCTION CONTRACTS ...........................................75
Section 156. — PUBLIC TRAFFIC ....................................................................................................84
Section 157. — SOIL EROSION AND SEDIMENT CONTROL......................................................88
Section 158. — WATERING FOR DUST CONTROL ......................................................................93
DIVISION 200 EARTHWORK ...........................................................................................................94
Section 201. — CLEARING AND GRUBBING ................................................................................95
Section 202. — ADDITIONAL CLEARING AND GRUBBING ......................................................97
Section 203. — REMOVAL OF STRUCTURES AND OBSTRUCTIONS ......................................98
Section 204. — EXCAVATION AND EMBANKMENT ................................................................102
Section 205. — ROCK BLASTING..................................................................................................113
Section 206. — RESERVED .............................................................................................................122
Section 207. — EARTHWORK GEOSYNTHETICS ......................................................................123
Section 208. — STRUCTURE EXCAVATION AND BACKFILL FOR SELECTED MAJOR
…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.