Statement of Work - DRAFT
500 Ton Trailer-Mounted Air-Cooled Chiller
1
1.0 Background
Kennedy Space Center (KSC) flight hardware processing and other critical facilities require
uninterrupted cooling to support operations and protect sensitive equipment. Existing cooling
assets are subject to launch damage, inclement weather, or are scheduled for maintenance or
replacement. A portable, trailer-mounted chiller allows rapid deployment and minimal disruption
to onsite operations and is required to ensure redundancy anywhere on the Spaceport with
minimal loss of thermal control.
2.0 Scope of Work
The vendor shall provide an electrically powered, air-cooled hydronic chiller mounted to a
Department of Transportation (DOT) rated trailer with associated electrical cabling and chilled
water hoses & connections capable of interfacing to all of the existing portable chiller facility
connections across KSC. The vendor will provide the necessary startup certification,
documentation, and auxiliary spare parts necessary for normal operation.
2.1 Contract Type, Delivery and Performance Period
Firm-Fixed-Price (FFP) contract. Period of Performance (POP) includes the delivery of a fully
operational chiller, pump, and associated equipment (see 2. Scope of Work) to KSC on or before
June 30, 2027.
3.0 Technical Requirements
3.1 Chiller
a. Electrically powered, air-cooled hydronic chiller of 500 refrigeration ton or 1758-
kilowatt cooling capacity, capable of a chilled water temperature differential between
supply and return flows of 10°F to 14°F at design conditions.
b. Three phase alternating current, 480-volt input.
c. Two sets of 480-volt, 125-amp electrical cables at least 25 feet long.
d. Helical variable-speed rotary screw compressors, with three fully independent cooling
circuits.
e. Integrated variable-speed fan motors with composite or other non-ferrous fan blades.
f. Onboard two-way adjustable supply and return water temperature set point capability.
g. Capable of continuous outdoor operation varying with environmental conditions.
h. Preferably traditional tube-and-fin copper condenser coil design, with anti-corrosion
coatings and alloy brazed joints on condenser coils to enhance service life. Microchannel
is acceptable in lieu of availability of tube-and-fin, provided with a comprehensive
package of anti-corrosion coatings. Includes condenser coil mounting rails which provide
ample drainage to prevent accumulation of corrosive alkaline water formation due to
onshore marine saltwater winds and frequent rainy conditions.
i. Integrated safety controls including high-pressure protection, freeze protection, phase
monitoring, and emergency stop.
j. Integrated vibration and acoustic dampening on condenser coils and compressors, as well
as a compressor muffler.
-- 1 of 3 --
Statement of Work - DRAFT
500 Ton Trailer-Mounted Air-Cooled Chiller
2
k. Operates with refrigerant R-134A, R-513A, or compatible ecologically friendly
refrigerant.
l. Six-inch diameter, flexible rubber/polymer water hoses at least 40 feet in length, bolted
flanges, gaskets, and hardware upon delivery of chiller.
3.2 Trailer
a. DOT-rated step-deck flatbed trailer, 45–55 feet in length sized accordingly to
accommodate chiller and skid-mounted water pump together for transport.
b. Aluminum construction for superior corrosion resistance and durability in a coastal
environment.
c. Load capacity of 25 tons or greater.
d. Trailer shall include proper DOT-approved load rating, tie-down anchors, leveling
support, wheel chocks, and necessary equipment suitable for static placement.
3.3 Chilled Water Supply Pump
a. 50 horsepower end-suction centrifugal water pump, with a 6” inlet and 5” or 6” discharge
diameter. Horizontally mounted. Fixed speed motor operates on 230/460 volts, 56/112
amp, three phase alternating current. Delivering minimum flow rate of 1250 gallons per
minute at 100 feet with a minimum 60 feet of head at 3,550 revolutions per minute.
b. Cast iron or stainless-steel housing, with an enclosed impeller constructed of cast iron or
stainless steel.
c. Chilled water pump shall be skid-mounted or integrated with the chiller trailer on the
platform above the 5 th wheel pintle. Pump and skid shall include corrosion-inhibiting
coating and isometric dampening mounts for vibration control.
3.4 Factory Startup & Familiarization
a. Manufacturer-led startup, performance benchmarking, and operations & maintenance
overview. Includes schematics, operational procedures, and spare parts list.
3.5 Mechanical Connection Hardware
a. ANSI-rated bolt-on flange connections compatible with common KSC facility
chilled-water supply and return interfaces.
b. Complete bolt & gasket kits for all flanged joints and connections.
c. Flexible 6-inch supply and return hoses sized to match existing system connections, 125
pounds per square inch pressure-rated for non-potable chilled-water service.
3.6 Electrical and Controls
a. 480-volt power cables, connections, and overcurrent protection for chiller and water
pump which are compatible with existing facility connections.
4.0 Deliverables (All Items a-h listed below shall Be Provided Digitally at Product Delivery)
a. Equipment submittals and certifications as follows: American Society of Heating,
Refrigeration, & Air Conditioning Engineers for chiller, Department of Transportation for
trailer, Hydraulic Institute or ANSI for water pump.
-- 2 of 3 --
Statement of Work - DRAFT
500 Ton Trailer-Mounted Air-Cooled Chiller
3
b. Electrical one-line diagram for temporary power configuration.
c. Startup testing and commissioning report.
d. As-built routing sketches for mechanical and electrical connections.
e. Operations & maintenance documentation.
f. Warranty coverage documentation.
g. Pressure testing certification on water hose assemblies & flanged connections.
h. Equipment data sheets, trailer certifications, pump curves, electrical requirements, and
hose specifications.
5.0 Other Re…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 333415)
N00244-26-Q-0063 Naval Base Point Loma Galley Grab N Go
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due July 29, 2026
366TRS HVAC Mini Split
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due July 28, 2026
Multi-Temperature Water Chiller
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due July 31, 2026