721 APS Baggage Conveyor System
DEPT OF DEFENSE
Notice type
Combined Synopsis/Solicitation
Solicitation #
FA561326Q0029
NAICS
333922
PSC
3910
Set-aside
No Set aside used
Posted
May 28, 2026
Response due
June 24, 2026
Place of performance
ramstein
What this opportunity is
The Department of Defense is seeking a baggage conveyor system, specifically for outbound baggage handling, which includes the removal and disposal of existing equipment. This opportunity is not set aside for small businesses, meaning all business types can compete. The notice type is a Combined Synopsis/Solicitation, indicating that interested vendors should track the opportunity closely and prepare to submit proposals based on the detailed requirements outlined in the solicitation.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
-- 1 of 32 --
THIS PAGE LEFT BLANK INTENTIONALLY
-- 2 of 32 --
Ramstein AB – Cover PD – Page i
TABLE OF CONTENTS
1. SCOPE .......................................................1
1.1. GENERAL SCOPE .............................................1
1.2. ACRONYMS ..................................................1
2. APPLICABLE DOCUMENTS ........................................1
2.1. GOVERNMENT DOCUMENTS ......................................1
2.2. NON-GOVERNMENT DOCUMENTS ..................................2
3. REQUIREMENTS ................................................4
3.1. SYSTEM DESCRIPTION ........................................4
3.1.1. OUTBOUND BAGGAGE CONVEYOR ...............................4
3.1.2. REMOVAL AND DISPOSAL OF EXISTING EQUIPMENT ...............4
3.2. CHARACTERISTICS ...........................................4
3.2.1. NOISE LEVELS ............................................4
3.2.2. ELECTRICAL CHARACTERISTICS ..............................5
3.2.2.1. POWER SOURCE ..........................................5
3.2.2.1.1. POWER DISTRIBUTION PANELS ...........................5
3.2.2.2. PROGRAMMABLE LOGIC CONTROLLERS ........................6
3.2.2.3. INSTALLATION CODE .....................................6
3.2.2.4. CONDUIT ...............................................6
3.2.2.5. GROUNDING .............................................6
3.2.2.6. WIRING ................................................6
3.2.2.7. OVERCURRENT PROTECTION ................................7
3.2.2.8. ENVIRONMENTAL PROTECTION ..............................7
3.2.2.9. PROTECTION FROM MECHANICAL DAMAGE......................7
3.3. DESIGN AND FABRICATION ....................................7
3.3.1. DESIGN CRITERIA .........................................7
3.3.1.1. RELIABILITY AND AVAILABILITY ..........................7
3.3.1.2. MAINTAINABILITY .......................................8
3.3.1.3. ENVIRONMENTAL CONDITIONS ..............................8
3.3.1.4. STANDARD, COMMERCIAL COMPONENTS .......................8
3.3.1.5. STANDARDIZATION .......................................9
3.3.1.6. SPECIAL TOOLS .........................................9
3.3.1.7. ACCESSIBILITY .........................................9
3.3.1.8. LUBRICATION REQUIREMENTS ..............................9
3.3.1.9. STRUCTURAL AND SEISMIC REQUIREMENTS....................9
3.3.1.10. VERIFICATION OF DIMENSIONS ...........................10
3.3.1.11. OZONE DEPLETING SUBSTANCES (ODS)......................10
3.3.1.12. SAFETY ...............................................10
3.3.1.12.1. OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION .......10
3.3.1.12.2. PROTECTION AGAINST MOVING PARTS.....................10
3.3.1.12.3. PLACARDS ...........................................10
3.3.1.12.4. FAIL-SAFE CONTROLS .................................11
3.3.1.12.5. CONVEYOR SAFETY STANDARD ...........................11
3.3.1.12.6. SAFETY STANDARD ....................................11
3.3.1.12.7. PERSONNEL PATHWAYS .................................11
3.3.1.12.8. PERSONNEL HAZARDS ..................................11
-- 3 of 32 --
Ramstein AB – Cover PD – Page ii
3.3.1.13. HUMAN ENGINEERING ....................................11
3.3.2. MATERIALS ...............................................12
3.3.2.1. STEEL .................................................12
3.3.2.2. MECHANICAL FASTENING DEVICES ..........................12
3.3.2.3. ANCHORS ...............................................12
3.3.3. PROTECTIVE COATINGS .....................................12
3.3.3.1. PAINTING ..............................................12
3.3.3.2. PLATING ...............................................13
3.3.3.3. GALVANIZING ...........................................13
3.3.3.4. DISSIMILAR METALS .....................................13
3.3.4. WELDING .................................................13
3.3.4.1. WELDING PROCEDURE QUALIFICATION .......................14
3.3.4.2. WELDER PERFORMANCE QUALIFICATION.......................14
3.3.5. FIRE PROTECTION .........................................14
3.3.6. CUTTING .................................................15
3.3.7. CLEAN-UP ................................................15
3.3.8. COORDINATION ............................................15
3.3.9. NAMEPLATES ..............................................16
3.3.10. PRECEDENCE .............................................16
3.4. DOCUMENTATION .............................................16
3.4.1. MANAGEMENT REPORTS ......................................16
3.4.2. SHOP DRAWINGS ...........................................17
3.4.3. EQUIPMENT MANUALS .......................................17
3.4.3.1. OPERATION MANUALS .....................................17
3.4.3.2. MAINTENANCE MANUALS ...................................17
3.4.3.3. ILLUSTRATED PARTS BREAKDOWN MANUALS....................18
3.4.4. EQUIPMENT CERTIFICATIONS ................................18
3.4.5. TESTING CERTIFICATION ...................................18
3.4.6. AS-BUILT DRAWINGS .......................................18
3.5. ORIENTATION ...............................................19
3.5.1. SYSTEM OPERATOR ORIENTATION .............................19
3.5.1.1. SYSTEM OPERATOR CLASSROOM INSTRUCTIONS.................20
3.5.1.2. SYSTEM OPERATOR HANDS-ON INSTRUCTIONS..................20
3.5.2. MAINTENANCE ORIENTATION .................................20
3.5.2.1. MAINTENANCE CLASSROOM INSTRUCTION......................20
3.5.2.2. MAINTENANCE HANDS-ON INSTRUCTION.......................20
4. QUALITY ASSURANCE PROVISIONS ................................21
4.1. GENERAL ...................................................21
4.2. ACCEPTANCE TESTS ..........................................21
4.2.1. SYSTEM CHECKOUT TEST ....................................21
4.2.2. QUALITY CONFORMANCE TEST ................................21
4.2.3. RELIABILI…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 333922)
Cable Carrier Replacement
DEPT OF DEFENSE · Solicitation · due June 25, 2026
Storage Aid System for Atlantic City ANGB, New Jersey and JRB Fort Worth, Texas
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due July 6, 2026
FY26 SFS Lateral Filing System
DEPT OF DEFENSE · Solicitation · due June 24, 2026
Amended _721 APS Baggage Conveyor System
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due July 8, 2026
Vertical Lift Module
DEPT OF DEFENSE · Solicitation · due June 25, 2026
Corpus Christi Conveyor System
AGRICULTURE, DEPARTMENT OF · Combined Synopsis/Solicitation · due June 23, 2026