What this opportunity is
The government is seeking a contractor to replace interpretive signs at the Blue Heron Mining Area within the Big South Fork National River and Recreation Area in Oneida, TN. This opportunity is set aside for total small businesses under NAICS 339950, which covers signage manufacturing. Interested vendors should note that this is a combined synopsis/solicitation, indicating that they will need to track the opportunity closely and prepare to submit bids in response to the solicitation.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
1
Big South Fork National River
and Recreation Area
Oneida, TN
Statement of Specifications
“Replace Interpretive Waysides at Blue Heron Mining
Area”
March 27, 2026
NATIONAL PARK SERVICE
INTERIOR REGION 2, SOUTH ATLANTIC GULF
NORTH MAJOR ACQUISITION BUYING OFFICE
-- 1 of 13 --
2
SOS Format
1. BACKGROUND: ................................................................................................................................................. 3
2. PROJECT IDENTIFIERS: ....................................................................................................................................... 3
3. PLACE OF PERFORMANCE: ................................................................................................................................ 3
4. PERIOD OF PERFORMANCE: .............................................................................................................................. 3
5. SCOPE: .............................................................................................................................................................. 3
6. TASK:................................................................................................................................................................. 4
7. INSPECTION: ...................................................................................................................................................... 7
8. SUBMITTALS AND APPROVALS: ......................................................................................................................... 9
9. PROJECT PERSONELL: ...................................................................................................................................... 13
-- 2 of 13 --
3
1. BACKGROUND:
Big South Fork National River and Recreation Area (hereinafter referred to as “BISO”) is
located along the eastern portion of the border separating Kentucky and Tennessee. The park
encompasses approximately 125,000 acres and was established by Congress on March 7, 1974.
The park’s primary mission is to provide management for the National Area so that natural and
cultural resources are preserved and protected for the use and enjoyment of present and future
generations. The Big South Fork of the Cumberland River and its tributaries are preserved in a
free-flowing condition, providing a broad range of recreational opportunities which benefit the
economically challenged region.
The National Park Service shall replace interpretive wayside panels and associated support
systems at the Blue Heron Mining Area. This project consists of fabrication and delivery of
interpretive panels, VIS hardware, custom-cut panels, and aluminum stands.
2. PROJECT IDENTIFIERS:
PMIS NUMBER: 320922A
PROJECT TITLE: “Replace Interpretive Waysides at Blue Heron Mining Area”
3. PLACE OF PERFORMANCE: All items shall be delivered F.O.B. Destination to the
following address, unless otherwise specified in the order:
East Rim Facilities Management Shop
4721 Leatherwood Road
Oneida, TN 37841
4. PERIOD OF PERFORMANCE:
The Contractor shall complete delivery of all specified items, including any required submittals
and corrections, within 120 consecutive calendar days after the Government issues written
Notice to Proceed or purchase order, unless extended by written modification issued by the
Contracting Officer.
5. SCOPE:
The National Park Service shall award a contract for the purchase and delivery of National Park
Service UniGuide Visitor Information Sign System (VIS) hardware and fiberglass embedment
graphic panels described in Section 6 and Attachment A, including all accessories and
appurtenances required for complete and usable frames and panels.
-- 3 of 13 --
4
The Contractor shall furnish all materials, equipment, packaging, and shipping necessary to
deliver all specified items in new, undamaged, and fully functional condition, at no additional
cost to the Government beyond the contract price.
The Contractor shall furnish all labor, materials, fabrication, hardware, packaging, and delivery
required to provide complete interpretive panel systems as defined in Attachment A.
Each Attachment A line item (LIN) shall be treated as a complete and independent deliverable
system.
The Contractor shall provide all components required for complete systems, including:
• Panels
• Frames
• Posts
• Stands
• Baseplates
• Fasteners
• Internal mounting hardware
Installation is not included and will be conducted by NPS
6. TASK:
The Contractor shall provide the VIS hardware and fiberglass embedment panels listed in
Attachment A – Panel and Hardware Schedule. The Contractor shall furnish the exact quantities,
panel sizes, types, and hardware configurations shown in Attachment A. Any change in panel
size, type, quantity, hardware series, or mounting configuration shall require prior written
approval from the Contracting Officer.
6.1 VIS HARDWARE (MANDATORY)
• The Contractor shall furnish only National Park Service UniGuide Visitor Information
Sign System (VIS) hardware.
• The Contractor shall comply with:
• Visitor Information Sign System (VIS) Manual, Revision 3 (October 5, 2017)
• The Contractor shall not provide non-VIS hardware.
6.2 VIS ASSEMBLY CONTROL
The Contractor shall use VIS assembly types appropriate to each Attachment A line item,
including:
-- 4 of 13 --
5
• WM (Wall Mounted)
• UP (Upright Single Face)
• UPN2 (Upright Double Face)
• LP (Cantilever)
• UPTR (TRI System)
The Contractor shall match assembly type to each LIN condition.
6.3 PANEL REQUIREMENTS
All panels shall be fiberglass embedment panels.
Panels shall:
• Match Attachment A dimensions
• Be single-face or double-face as required
• Be compatible with VIS capture systems
• Be UV-resistant
• Be vandal-resistant
The Contractor shall not provide alternate panel types.
6.4 MATERIAL CONTROL
Material type shall be strictly as defined in Attachment A.
The Contractor shall provide:
• Galvanized steel where specified
• Weath…
Source: SAM.gov, as posted. Verify the current solicitation before responding.