AMXG Group Air Compressors, Cooling System & Pump Stations INSTALLAION

DEPT OF DEFENSE

Notice type
Combined Synopsis/Solicitation
Solicitation #
FA822426Q0003_1
NAICS
238220
PSC
N041
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
July 16, 2026
Response due
August 4, 2026
Place of performance
Hill Air Force Base, UT

What this opportunity is

The Department of Defense is soliciting a 100% Total Small Business Set-Aside for a contractor to install and integrate two government-owned Ingersoll Rand compressors, dryers, and glycol coolers at Hill Air Force Base in Utah. The project requires labor, tools, and standard materials to physically install the equipment and connect it to the base's power and air loop. This opportunity is suitable for small businesses with experience in mechanical installation, particularly those familiar with the Davis-Bacon prevailing wage requirements. Bidders should track the Combined Synopsis/Solicitation notice closely, as the deadline for quotes is August 4, 2026.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

CUI CUI STATEMENT OF WORK (SOW) Project Title: 16175 AMXG Group Air Compressors, Cooling System & Pump Stations Installation - (11311/16174) Project Number: AMXG26036 Location: Building 269 (West Bay), Hill Air Force Base (HAFB) Modification Date: 17 June 2026 1.0 INTRODUCTION & SCOPE 1.1 Scope: The Contractor shall provide all non-Government furnished labor, tools, equipment, materials, and supervision necessary to install and connect two (2) Government-owned Ingersoll Rand compressors, glycol stations, dryers, and condensers into the compressor room of Building 269 West Bay. The Contractor shall install the equipment to manufacturer specifications and integrate it into the existing HAFB compressor loop to ensure sustained compressed air for the bay. 1.2 Pre-Project Status: Base Civil Engineering (CE) has already cored the necessary hole in the exterior wall to facilitate this installation. 2.0 PERIOD OF PERFORMANCE 2.1 Installation Deadline: All Contractor installation tasks, piping, and electrical tie-ins must be 100% completed no later than 12 August 2026. 2.2 Startup: Following Contractor completion, HAFB will fill the glycol, and Cate Industrial will conduct the final system startup no later than 2 September 2026 to maintain the equipment warranty. 3.0 CONTRACTOR EXECUTION TASKS The Contractor shall execute the following tasks in accordance with Appendix A (AMXG26036 Piping Sketch) and the provided manufacturer spec drawings. Unless otherwise specified, pipe sizes designated in the appendices are non-negotiable. 3.1 Electrical Requirements • Power Supply: Connect equipment to the 460V / 423 Amp power supply. Verify adjustable breakers are correctly set. • Wire Protection: Wrap any damaged existing electrical wires with an additional protective coating (minimum of 3 layers of heavy-duty electrical tape). -- 1 of 4 -- CUI CUI • Disconnects: Relocate the existing knife switch off the wall and mount it onto a Unistrut stand directly above where the electrical feed exits the floor. Power is to be fed directly into the knife switch. Install time-delay fuses in disconnects. • Control Wiring: Run conduit and three 18-gauge control wires from the pump stations to the compressor controllers. (Note: Cate Industrial will make the final terminations). 3.2 Compressor & Tank Piping • Isolation: Install a shut-off valve immediately after each compressor and on all machinery to allow isolation for maintenance. • Wet Tank: Remove existing inline filters prior to the wet tank (only utilize the filters already attached to the new dryers). Pipe into the bottom of the wet tank and out the top of the wet tank, then route over to the dry tank. • Dryers: Pipe from the wet tank to the dryers. Install a shut-off valve both pre-dryer and post-dryer. • Material Specification: For the first 15 feet post-dryer, the Contractor must either weld the pipe or use black pipe. (After 15 feet, return to existing pipe. • Drainage: Route all drainpipes to the respective floor drains. 3.3 Glycol Skids & Fluid Coolers • Skid Installation: Install the automatic glycol refill system. Install glycol skids up to the cooling system of the compressors and fluid coolers. This includes the installation of thermal mixing valves, expansion tanks, and air vent/purgers per the provided fluid cooler/pump station diagram. • Fluid Cooler Orientation: Pick up the southernmost fluid cooler and rotate it 180 degrees so its exhaust no longer faces the intake of the adjacent fluid cooler. If concrete anchors must be cut to achieve this, the Contractor must re-anchor the cooler using HIT-RE 500 V3 epoxy. • System Integrity: Install piping from the fluid coolers into the cooling system with the glycol skids and compressors. Test all valves at the fluid cooler connections for functionality; replace any non-functional valves with new units. The Contractor is responsible for ensuring there are zero leaks in the system prior to the Government filling the glycol. -- 2 of 4 -- CUI CUI 4.0 SAFETY & COMPLIANCE 4.1 General Standards: Accomplish all work in accordance with applicable AFOSHA, OSHA, NFPA, NEC, and Environmental standards. Use all applicable safety devices or work from a forklift when working at heights. 4.2 Lockout/Tagout (LOTO): Electrical hazard present. The Contractor must lock out and tag out (LOTO) all electrical systems prior to working with electricity. 4.3 Hazards & PPE: Falling equipment hazard present. Extreme caution must be used when removing equipment; equipment must be safely secured before removing fasteners. Personnel must wear all required Personal Protective Equipment (PPE). (Note: Asbestos/Lead Survey indicates N/A for this location). 4.4 Labeling: Label all electrical junction boxes and outlets with the correct panel identification number, corresponding breaker number(s), Volts, and Amps. Label panel cards with correct circuit locations. Label all air lines with "Shop Air," Max PSI, and Directional Flow Arrows. 5.0 INSPECTIONS & GOVERNMENT COORDINATION 5.1 Communication: The Contractor shall contact Requestor Phillip Benstog (385-358- 0491) and leave a message when each phase of the project is started and completed. 5.2 Clean-Up: The Contractor must clean the respective work area at the conclusion of each phase. 5.3 Final Inspection: Upon completion, Project Engineer Joshua White and Requestor Phillip Benstog will conduct a final inspection to verify all requirements have been met. 5.4 Post-Installation: (Government Task) AMXG will inform CE that the EMCS controls are ready to be hooked up to the compressors for loop network integration and to assign equipment ID numbers. 6.0 SECURITY & OPSEC REQUIREMENTS 6.1 Base Access and Contractor Badging The Contractor shall comply with all HAFB security requirements. The Contractor must obtain visitor passes for all employees performing work under this SOW and submit required identification to Base Security Forces prior to site mobilization. 6.2 Protection of Contr

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 238220)