CAFETERIA BOILER REPLACEMENT SYSTEM
STATE, DEPARTMENT OF
Notice type
Solicitation
Solicitation #
191T7026Q0025
NAICS
238220
PSC
J041
Set-aside
No Set aside used
Posted
July 13, 2026
Response due
July 27, 2026
Place of performance
Rome, IT-RM
What this opportunity is
The government is buying a new HVAC system for the Embassy's Cafeteria in Rome, Italy, which includes installation materials, equipment, labor, and logistical support. This contract is open to all businesses, as there is no set-aside used. Since this is a solicitation notice, interested businesses should track the opportunity and prepare to bid.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
- 1 -
EMBASSY OF THE UNITED STATES OF AMERICA
Via Veneto 119/A
0187 Rome, Italy
U.S. EMBASSY ROME
CAFETERIA BOILER ROOM REFURBISHMENT
FAC Engineering
05/14/2026
-- 1 of 171 --
- 2 -
FOREWORD
The Embassy of the United States in Rome needs to award a contract for the
installation of a new HVAC system serving the Embassy’s Cafeteria at the U.S.
Trimission, Via Sallustiana 49, Rome.
GENERAL
The contractor shall supply all the installation materials and equipment, skilled
and unskilled labor, technical supervision, as well as logistic and
administrative support. The contractor shall also supply all accessory services
such as: transportation, leasing, equipment and tools, disposal of debris,
cleaning the work area and anything else necessary to complete the project in
compliance with the present specifications
The COR may schedule some of the operations to be performed after-hours or
during the weekend. These activities shall be performed at no extra cost for the
Embassy.
Maximum attention is required for the safety of personnel at work on the site.
The workers shall operate in compliance with standard codes. In view of the fact
that the work site consists of crucial technical installations, temporary safety
protection measures towards third parties and workers shall be installed with
care and attention, especially for the hours when site is closed.
The Contractor shall be responsible for submitting, for approval by the COR,
samples of materials and supplies to be used.
It shall be Contractor's responsibility to verify all the quantities and dimensions.
DEFINITIONS
A glossary of terms and relative equivalents used in the drawing up of the tender
documents are indicated hereunder:
Client, Administration, Project Supervisor, COR, CO: all these denominations
identify the technical administrative staff, predisposed to handle the contract on
behalf of the embassy of the United States of America.
-- 2 of 171 --
- 3 -
Contracting Company, Contractor: all these denominations identify the subject
that undertakes to carry out the work described in the contract.
Contract, Purchase Order (P.O.), Work Order: these terms identify the contract
document with which the project is awarded. The Client at his indisputable judgment
shall make the formal selection of the different types of documents.
PARKING
No parking is allowed inside Embassy grounds. The Contractor's vehicles shall be
allowed to enter only for loading and unloading materials.
Loading and unloading operations shall be carried out using only one vehicle at a
time.
Consequently, during the accomplishment of the project the Contractor shall ensure
that its vehicles are parked at its own expense outside the Government property.
SAFETY STANDARDS
The Contractor shall comply with all the applicable health and safety obligations
provided by Legislative Decree No. 81/2008 (Consolidated Law on Occupational
Health and Safety). The main objective is to eliminate or, where not possible, to
reduce to the minimum any exposure of workers to risks arising from work-related
activities. To this end, the Contractor is required, when applicable, to submit the
Risk Assessment Document (Documento di Valutazione dei Rischi – DVR) or the
Operational Safety Plan (Piano Operativo di Sicurezza – POS), to provide adequate
and documented training to workers, to supply appropriate individual and collective
protective equipment (PPE and CPE), and to fully comply with all the other
obligations set forth under Legislative Decree 81/2008.
Submission of the Operational Safety Plan (POS)
Within 10 calendar days after receiving the Notice to Proceed, the awarded
Contractor must submit a detailed Operational Safety Plan (POS). The POS must
clearly identify the following key professional figures:
-- 3 of 171 --
- 4 -
Site Technical Director (Direttore Tecnico di Cantiere):
The individual responsible for managing the construction site on behalf of the
Contractor. This role may be fulfilled by either an internal employee or an external
professional formally appointed by the company. This figure is not to be confused
with the Construction Supervisor (Direttore dei Lavori), who is appointed by the
Client and is responsible for verifying that the works are carried out in compliance
with thedesign and technical specifications.
Supervisor (Preposto):
An individual who, by the nature of their duties, supervises the work of others (e.g.,
site manager, workshop head, department chief). The Supervisor must be adequately
trained to fulfill the responsibilities assigned under Art. 19, paragraph 1, letter g) and
in accordance with the objectives
of Art. 37 of Legislative Decree 81/2008. The Supervisor shall ensure, continuously
and effectively, that:
1. Workers comply with safety instructions and the provisions of the safety
plan;
2. Personal protective equipment (PPE) is used as required;
3. Any deficiencies in procedures, tools, PPE, or persistent non-compliance
are promptly reported to the employer or manager.
The contractor has to send the list of personnel who will work on site. The workers
have to be regularly registered and if there is a subcontractor this has to present the
documents requested too. All workers have to understand and speak Italian.
-- 4 of 171 --
- 5 -
DESCRIPTION OF WORK
The work consists in:
HVAC Work
Removal and disposal of the two existing boilers and all related piping and
equipment. The Contractor will provide disposal certificates to the COR.
Supply and installation of new piping, manifolds, valves, strainers,
thermometers (scale range: 0-90 C, Class 1), pressure gauges (scale range: 0-
6 bar, Class 1), expansion tanks as per drawings. Piping shall be treated with
anti-rust. All equipment shall be PN16
Supply and install a twin secondary pumps.
Supply and install a DHW recirculating pump.
Supply and installation of a new dirt separator with magnet DN50
Supply and installation of new natural gas piping to feed the new boi…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 238220)
Air Conditioning Maintenance
JUSTICE, DEPARTMENT OF · Justification
Air Conditioning Repair
JUSTICE, DEPARTMENT OF · Justification
Replace EVAP Cooler in Greenhouses - St. Paul, MN
AGRICULTURE, DEPARTMENT OF · Combined Synopsis/Solicitation · due August 13, 2026
J--FY26 HIHW VC and LC HVAC Repair and Replacement
COMMERCE, DEPARTMENT OF · Combined Synopsis/Solicitation · due July 28, 2026
89 AW HQ Water Bottle Stations
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due August 4, 2026
Boiler Maintenance & Repair
DEPT OF DEFENSE · Solicitation · due September 3, 2026