Chancery 3003 Integrated window blinds (104)
STATE, DEPARTMENT OF
Notice type
Special Notice
Solicitation #
PR16077115
NAICS
238390
PSC
N099
Set-aside
No Set aside used
Posted
July 14, 2026
Response due
August 5, 2026
Place of performance
Bern, CH-BE
Description
Statement of Work (SOW): Maintenance & Motor Retrofit (Final Version)
Project: Refurbishment of 104 Integrated Venetian Blinds
Location: Office Building – Bern, Switzerland
System Type: Warema Type 1.16/25/35.07 (24v motor) inside WICONA WICLINE Aluminum Composite Windows
1. Project Objective
The contractor shall provide a turnkey solution for the inspection, repair, and motor retrofit of 104 integrated venetian blinds. The objective is to restore 100% motorized functionality while maintaining the thermal, acoustic, and aesthetic integrity of the WICONA window units.
2. Comprehensive Pricing & Scope
The offer submitted by the contractor must be all-inclusive . No additional costs will be entertained after the contract award. The bid price shall include:
Labor: All technician, electrician, and logistical personnel hours.
Materials: All motors, cables, lift tapes, ladder cords, and hardware components.
Equipment: All tools, specialized window opening devices, safety gear, and cleaning supplies.
Transportation: All travel costs, vehicle expenses, and shipping/freight for parts.
Fees: Disposal fees, administrative costs, and any required permits or insurance.
3. Logistics & Site Management
Furniture Management: Contractor shall move office furniture and equipment as required to gain unobstructed access to the windows. All items must be protected and returned to their original positions upon completion.
Surface Protection: Provide appropriate floor and wall protection during the transit of tools and components.
4. Health, Safety & Electrical Standards
Qualified Personnel: Only certified electricians (per Swiss regulations) may perform electrical work.
Lockout/Tagout (LOTO): A strict LOTO procedure must be implemented. Hazardous energy sources must be isolated, locked, and tagged before work commences.
Verification: Zero-energy state must be verified via testing before physical contact with wiring.
Controls: Each motor control shall be integrated into the Building KNX system.
5. Technical Execution: WICONA & Warema Systems
Sash Access: Open the internal "sandwich" sash of the WICONA windows using the integrated latches.
Hardware Maintenance: Inspect and lubricate all WICONA latching mechanisms and concealed hardware.
Gasket Inspection: Verify the condition of internal gaskets. Damaged seals must be reported or replaced to ensure the cavity remains dust and moisture-free.
Blind Retrofit:
Identify and replace failed motors with compatible high-quality alternatives (e.g., Somfy, Elero) that fit the existing Warema headrails.
Replace worn lift tapes and ladder cords as necessary to ensure smooth mechanical operation.
6. Commissioning & Integration
Calibration: Set electronic end-limits (upper/lower) for every unit.
Testing: Perform three full cycles (Up/Down/Tilt) per window to ensure defect-free operation.
System Integration: Ensure new motors are integrated into the existing building control or radio systems.
7. Waste Disposal (Swiss Compliance)
Swiss Codes: Disposal must comply with vREG/ORDEA (Electrical Waste) and VeVA/OMW (Waste Movements).
Recycling: Deliver old motors and aluminum scrap to authorized SENS eRecycling or Swico collection points.
Evidence: Contractor shall provide official disposal certificates ( Entsorgungsnachweis ).
8. Cleaning & Handover
Internal Cleaning: Clean internal glass surfaces and aluminum slats before closing the sash.
Final Report: Provide a list of all units serviced, including specific motor model numbers used.
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 238390)
Z--SANTA ELENA GUARDHOUSE LEAD PAINT REMEDIATION AT SAN JUAN NATIONAL HISTORIC SITE
INTERIOR, DEPARTMENT OF THE · Presolicitation · due August 21, 2026
DOS Overseas Furniture Install Services
STATE, DEPARTMENT OF · Solicitation · due August 28, 2026
15 OSS Furniture
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due July 14, 2026
16 WPS Auditorium Seating
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due July 10, 2026
SUPPLY AND INSTALLATION OF EXTERNAL FABRIC CANOPY AT CHANCERY BUILDING - U.S. EMBASSY MAJURO, MARSHALL ISLANDS
STATE, DEPARTMENT OF · Presolicitation
Building 3030 Furniture Refresh
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due July 7, 2026