What this opportunity is
The Department of Defense is seeking a contractor for the demolition and site restoration of two specified locations in South Carolina, under NAICS code 238910. This project is set aside for total small businesses, making it suitable for small contractors with experience in demolition and construction services. As a sources sought notice, interested businesses should track this opportunity for potential bidding, as it indicates the government is gathering information rather than soliciting immediate proposals.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
DEMO MINIMUTE SITES
Attachment 1, Statement of Work
Page 1 of 7
VLSB 26-0072
PAVING IDIQ
STATEMENT OF WORK
FOR
DEMO MINIMUTE SITES
April 27, 2026
PROJECT: VLSB 26-0072
BACKGROUND:
The purpose of this project is to perform a comprehensive demolition, removal,
and site restoration services at the two (2) specified locations: the Olanta Site and
the Kingstree Site.
SCOPE OF WORK:
The contractor shall provide all necessary labor, supervision, materials, and
equipment to perform the tasks outlined below. All work shall be executed in a safe
and professional manner, with debris disposed of in accordance with all local,
state, and federal regulations.
GENERAL REQUIREMENTS:
The following requirements are applicable to both sites:
• Mobilization: Mobilize personnel and equipment to each project site.
• Debris Removal: Legally dispose of all demolition debris and materials off-site.
• Safety: Adhere to all applicable safety protocols, standards & procedures for
demolition and construction.
-- 1 of 7 --
DEMO MINIMUTE SITES
Attachment 1, Statement of Work
Page 2 of 7
VLSB 26-0072
BASE BID (CLIN 0001): OLANTA SITE
All the existing structure at the Olanta Site is to be demolished in its entirety. The
overall site is to be graded & restored in its entirety. The contractor shall perform
the following demolition and restoration tasks:
• Earthwork & Grading:
• Remove 570 cubic yards of 6" aggregate base.
• Provide, place, and fine grade 570 cubic yards of topsoil fill.
• Fencing & Gates:
• Remove 600 linear feet of chain-link fence and associated gates.
• Remove 3,200 linear feet of t-post and 3-strand barbed wire fence
and associated gates.
• Structural Demolition:
• Remove and dispose of two (2) lightning towers.
• Remove two (2) concrete tower footings (2 cubic yards total).
• Remove one (1) housekeeping concrete slab (1 cubic yard).
• Electrical Demolition:
• Remove 350 linear feet of underground electric service.
• Remove one (1) lot of electrical service racks and pole.
• Remove approximately 23 ground rods.
• Remove 1,000 linear feet of #2/0 ground ring.
• Site Restoration:
• Hydroseed 3,500 square yards of all disturbed areas.
-- 2 of 7 --
DEMO MINIMUTE SITES
Attachment 1, Statement of Work
Page 3 of 7
VLSB 26-0072
OPTIONAL BID (CLIN 0002): KINGSTREE SITE
All the existing structure at the Kingstree Site is to be demolished in its entirety
except for the existing gravel. The existing gravel is to remain in place and to be
kept in good condition post demolition . The contractor shall perform the following
demolition and restoration tasks:
• Fencing & Gates:
• Remove 600 linear feet of chain-link fence and associated gates.
• Remove 2,100 linear feet of t-post and 3-strand barbed wire fence
and associated gates.
• Structural Demolition:
• Remove and dispose of two (2) lightning towers.
• Remove two (2) concrete tower footings (approximately 2 cubic
yards total).
• Remove one (1) housekeeping concrete slab (approximately 1 cubic
yard).
• Electrical Demolition:
• Remove 350 linear feet of underground electric service.
• Remove one (1) lot of electrical service racks and pole.
• Remove approximately 23 ground rods.
• Remove 1,000 linear feet of #2/0 ground ring.
• Site Restoration:
• Provide, place, and fine grade 200 cubic yards of topsoil fill in all
impacted areas.
• Hydroseed approximately 1,200 square yards of all impacted areas.
PERIOD OF PERFORMANCE
The Period of Performance (POP) shall be 60 calendar days from the Notice to
Proceed (NTP).
-- 3 of 7 --
DEMO MINIMUTE SITES
Attachment 1, Statement of Work
Page 4 of 7
VLSB 26-0072
GENERAL DESIGN AND CONSTRUCTION NOTES:
Any references to State Government, Federal Government, or Industry standards
or specifications made herein shall form a part of this specification to the extent
referenced thereto and all materials and workmanship under this contract shall
comply with or exceed these standards and references. All referenced standards
shall be the latest edition.
All drawings shall be sealed, signed and dated by a Professional Engineer (PE)
and/or Registered Architect (RA), currently registered in the state of South
Carolina, and is a design professional in the area covered by the sheet(s) of the
drawings they seal.
The Contractor shall show all calculations on the drawings in lieu of a separate
document, except where specifically allowed by the Shaw AFB Design Engineer.
The contractor shall include make, model number and inherent operational
characteristics on the drawings for all of major equipment supplied for the facility.
The Contractor shall supply manufacture’s cut sheets with the submittal where the
component is identified.
Where specific part numbers or manufactures are referenced, it shall be
understood that the contractor may use an approved equal.
All manufactured equipment and products shall be new materials in good condition
and installed as per manufacturers’ latest printed instructions, unless specified
otherwise herein.
The Contractor is responsible for protection of existing facilities equipment from
damage during installation and testing operations.
Contractor shall take into account the special treatment of hazardous waste, as
well as the environmental implications related to building demolition management
(i.e. fluorescent lighting tubes, t-stats, etc.). Every effort shall be made to recycle
eligible materials, and those not suitable, shall be disposed of off base in
accordance with all (SCDHEC) South Carolina Department of Health and
Environmental Control regulations.
Any refrigerant amounts removed or installed shall be documented and the
information shall be provided to Shaw AFB.
If any submittal doesn’t, in the opinion of the Contracting Officer, meet or exceed
the requirements contained within this SOW, in the Shaw AFB Design Standards
or in any referenced design guidance or nationally recognized code then it shall be
considered to be unacceptable and returned to the Contract for correction and
resubmission. The Contrac…