Demolition, Remediation and Restoration

TRANSPORTATION, DEPARTMENT OF

Notice type
Combined Synopsis/Solicitation
Solicitation #
6913G626Q300030
NAICS
238910
PSC
F999
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
June 12, 2026
Response due
June 17, 2026
Place of performance
Clovis, CA

What this opportunity is

The Department of Transportation is seeking a contractor for demolition, remediation, and restoration services at a VOR facility in Clovis, CA, under a total small business set-aside. This project involves removing environmental hazards, demolishing structures, and restoring the site in compliance with applicable regulations. The notice type is a combined synopsis/solicitation, indicating that interested small businesses should prepare to submit proposals based on the provided scope of work and requirements.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

Under an Interagency Agreement, the John A. Volpe National Transportation Systems Center (Volpe Center) is providing support to the Federal Aviation Administration (FAA) Facilities Real Property Disposition program. As part of these efforts, removal/demolition and related activities will be conducted at one Very High Frequency Omnidirectional Range (VOR) facility in the FAA’s Western Service Area (ESA). The demolition and related activities shall be performed at the FAA facilities listed below: CZQ VOR – Clovis, CA (36.884322°, -119.815140°) The FAA no longer uses the equipment/buildings at the above-listed facility. The property is leased and there are no co-located facilities, so the FAA plans to cancel the lease after the demolition and restoration activities take place. Prior to relinquishing this property the FAA plans to remove environmental hazards, demolish or remove certain onsite structures and infrastructure, and restore disturbed areas. The Contractor shall conduct all work in accordance with Federal, State and local requirements. Where inconsistencies exist, the Contractor shall follow the most stringent requirement. ​​ The Contractor shall submit a draft Demolition, Removal, and Restoration work plan (Work Plan) within 10 business days after attending a kickoff meeting with the Volpe Center representatives that addresses the project requirements below. This task involves the preparation and submission of a draft and final Work Plan. The Work Plan shall detail the technical approach and schedule for conducting all demolition, debris removal, disposal, and site restoration activities as required and described below. To assist with preparation of the Work Plan, the contractor shall thoroughly review the Government-furnished site survey reports for the facilities scheduled for demolition. See SOW for further details of requirement.

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 238910)