Design-Bid-Build (DBB) Repair of Storm Sewer Water and Sanitary Sewer Systems, Caserma Miotto, Longare, Vicenza, Italy.

DEPT OF DEFENSE

Notice type
Presolicitation
Solicitation #
W912PF26RA011
NAICS
237110
PSC
Z2NZ
Set-aside
No Set aside used
Posted
June 16, 2026
Response due
June 25, 2026
Place of performance
Longare, IT-VI

What this opportunity is

The Department of Defense is seeking construction services for the Design-Bid-Build (DBB) repair of stormwater and sanitary sewer systems at Caserma Miotto, Longare, Vicenza, Italy. This opportunity is open to all businesses, as there is no set-aside for small businesses. The presolicitation notice provides draft technical documents for review, but formal proposals are not being accepted at this stage. Interested contractors should monitor SAM.gov for the official solicitation release and be prepared to respond to the final Request for Proposal when published.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

General SOW PART 1 PROPOSAL FORMS AND DOCUMENTS - Page 1 Part 1 Proposal Forms and Documents PREFACE This Statement of Work (SOW) consists of five parts. Part 1 Contains typical contractual forms, procedures, bidding instructions, bond information, clauses and wage decisions. Part 2 Contains general contract administrative and execution requirements including, but not limited to safety, design criteria & process, quality control, security, schedule, invoicing, temporary facilities, and design and construction oversight processes. Part 3 Lists the project requirements, specific scope items, background project information, references, and expected quality level above and beyond those outlined in Part 4. Part 3 will be provided with the specific Task Order. Within Part 3 section 5.0 ROOM REQUIREMENTS provides detailed requirements on a room by room basis that further defines requirements that are in addition to the ENGINEERING SYSTEMS REQUIREMENTS SECTION. Part 4 Contains Performance Specifications and minimum quality requirements. Part 5 Contains prescriptive specifications, contains necessary edited UFGS. The scheduling and safety spec are included here. Part 6 includes all 100% full design attachments which are: x DRAWINGS x SPECIFICATIONS x BASIS OF DESIGN x REPORTS x PSC AND FASCICOLO DELL’OPERA x SPECIFIC THIRD PARTY AGENCIES APPROVALS DOCUMENTS; x PDC (PERMIT TO BUILD-PERMESSO DI COSTRUIRE) APPROVED x MOU AND LICENSE SIGNED DOCUMENTS x UTILITIES LINES RIGHT OF WAY ACT BETWEEN COMUNE DI LONGARE AND PRIVATES FOR NEW TOC PIPE INSTALLATION x LETTER OF WAIVER TO TAX PAYMENT BY US GOV AND BY CONTRACTOR WORKING FOR US GOV PROJECTS x VI.ABILITA’ APPROVAL FOR TOC CROSSING UNDER RIVIERA BERICA -- 1 of 218 -- General SOW PART 1 PROPOSAL FORMS AND DOCUMENTS - Page 2 TABLE OF CONTENTS (Parts 2-5) PART 2 – GENERAL REQUIREMENTS 0 00 00 GENERAL REQUIREMENTS 01 11 00 SUMMARY OF WORK 01 14 00.05 20 WORK RESTRICTIONS 01 20 00.05 20 PRICE AND PAYMENT PROCEDURES 01 30 00.05 20 ADMINISTRATIVE REQUIREMENTS 01 31 19.05 20 POST AWARD MEETINGS 01 32 16.00 20 SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES 01 33 00.05.20 CONSTRUCTION SUBMITTAL PROCEDURES 01 33 10.05 20 DESIGN SUBMITTAL PROCEDURES 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS 01 45 00.10 20 QUALITY CONTROL FOR MINOR CONSTRUCTION 01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS 01 74 19.05 20 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT FOR DESIGN BUILD 01 78 00 CLOSE OUT SUBMITTALS PART 3 – STATEMENT OF WORK / PROJECT PROGRAM CHAPTER 1 – PROJECT DESCRIPTION CHAPTER 2 – PROJECT OBJECTIVES CHAPTER 3 – SITE ANALYSIS CHAPTER 4 – BUILDING REQUIREMENTS CHAPTER 5 – ROOM REQUIREMENTS CHAPTER 6 – ENGINEERING SYSTEMS REQUIREMENTS CHAPTER 7 – ATTACHMENTS PART 4 – PERFORMANCE TECHNICAL SPECIFICATIONS 1.0 GENERAL REQUIREMENTS 2.0 PERFORMANCE TECHNICAL SPECIFICATIONS A10 – FOUNDATIONS A20 – BASEMENT CONSTRUCTION B10 – SUPERSTRUCTURE B20 – EXTERIOR ENCLOSURE B30 – ROOFING C10 – INTERIOR CONSTRUCTION C20 – STAIRS C30 – INTERIOR FINISHES D10 – CONVEYING D20 – PLUMBING D30 – HVAC D40 – FIRE PROTECTION D50 – ELECTRICAL E10 – EQUIPMENT -- 2 of 218 -- General SOW PART 1 PROPOSAL FORMS AND DOCUMENTS - Page 3 E20 – FURNISHINGS F10 – SPECIAL CONSTRUCTION F20 – SELECT BUILDING DEMOLITION G10 – SITE PREPARATIONS G20 – SITE IMPROVEMENTS G30 – SITE CIVIL/MECHANICAL UTILITIES G40 – SITE ELECTRICAL UTILITIES PART 5 – PRESCRIPTIVE SPECIFICATIONS SECTION 01 32 16.00 20 – SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES SECTION 01 33 10.05 20 – DESIGN SUBMITTAL PROCEDURES SECTION 01 35 26 – GOVERNMENTAL SAFETY REQUIREMENTS SECTION 01 78 23 – OPERATION AND MAINTENANCE DATA SECTION 01 78 00 – CLOSEOUT SUBMITTALS -- 3 of 218 -- General SOW PART 2 GENERAL REQUIREMENTS - Page 4 Part 2 General Requirements TABLE OF CONTENTS • 00 00 00 GENERAL REQUIREMENTS • 01 11 00 SUMMARY OF WORK • 01 14 00.05 20 WORK RESTRICTIONS • 01 20 00.05 20 PRICE AND PAYMENT PROCEDURES • 01 30 00.05 20 ADMINISTRATIVE REQUIREMENTS • 01 31 19.05 20 POST AWARD MEETINGS • 01 32 16.00 20 SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES • 01 33 00.05 20 CONSTRUCTION SUBMITTAL PROCEDURES • 01 33 10.05 20 DESIGN SUBMITTAL PROCEDURES • 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS • 01 45 00.10.20 QUALITY CONTROL FOR MINOR CONSTRUCTION • 01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS • 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS • 01 74 19.05 20 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT FOR DESIGN-BUILD • 01 78 00 CLOSE OUT SUBMITTALS 00 00 00 GENERAL REQUIREMENTS 1.1 Definitions As used throughout the SOW, the following terms have the meaning set forth below: Contracting Officer (KO): The individual designated to administer the contract. Throughout this contract, this individual will be responsible and possess the authority to act on behalf of the Government with respect to the specific contract. Contracting Officer’s Representative (COR): The individual designated by the Contracting Officer as the authorized representative of the KO. The COR is responsible for monitoring performance and technical management of the effort required and should be contacted regarding questions or problems of a technical nature. Contract: Contract or task order. Contractor: The term Contractor refers to both the Prime Contractor and all subcontractors, whether in contract with the Prime Contractor or other subcontractors at any tier, including the Designer of Record. Designer of Record (DOR): Licensed architect/engineer working as subcontractor to or partner with Prime Contractor who provides design for this contract. Quality Control (QC): Contractor's system to control the quality of design, material, equipment and construction. -- 4 of 218 -- General SOW PART 2 GENERAL REQUIREMENTS - Page 5 Quality Assurance (QA) Program: Government's program to evaluate the effectiveness of the Contractor's quality control. The Government's QA Program is not a substitute fo

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 237110)