What this opportunity is
The Department of Defense is seeking a contractor to repair and maintain an airfield stormwater system in Georgia. This opportunity is suitable for small businesses that specialize in heavy construction, specifically those with experience in civil engineering projects, as indicated by the NAICS code 237110. The presolicitation notice indicates that the government is in the process of gathering information and may issue a solicitation in the future, so interested parties should track the opportunity for updates.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
SPECIFICATIONS
Certified Final
USACE Louisville District
Repair & Maintain Airfield Stormwater System Phase II
Dobbins Air Reserve Base, GA
Marietta, Georgia
9 January 2025
Project #: FGWB-04-0014-P2A/B
P2#: 470584
FY2026
AE Project #:1230218
-- 1 of 354 --
P2#470584 - Repair & Maintain Airfield Stormwater System PhII 9 January 2026
Dobbins Air Reserve Base, GA
THIS PAGE INTENTIONALLY LEFT BLANK
Certified Final
-- 2 of 354 --
P2#470584 - Repair & Maintain Airfield Stormwater System PhII 9 January 2026
Dobbins Air Reserve Base, GA
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 07 01/26 SEALS PAGE
DIVISION 01 - GENERAL REQUIREMENTS
01 01 00 01/19 GENERAL REQUIREMENTS
01 33 00 01/19 SUBMITTALS
01 42 00 05/24 SOURCES FOR REFERENCE PUBLICATIONS
01 50 00 11/20, CHG 2: 08/22 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 56 00 05/25 DOBBINS ARB ENVIRONMENTAL REQUIREMENTS
01 57 19 08/22 TEMPORARY ENVIRONMENTAL CONTROLS
DIVISION 02 - EXISTING CONDITIONS
02 41 00 08/22 DEMOLITION
DIVISION 03 - CONCRETE
03 62 15.00 06 07/16 FLOWABLE FILL
DIVISION 31 - EARTHWORK
31 00 00.00 06 07/18 EARTHWORK
31 11 00 11/18 CLEARING AND GRUBBING
31 16 00 03/17 CENTRIFUGALLY CAST CONCRETE PIPE
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19.61 11/19CHG 1: 11/24 SEALING OF JOINTS IN RIGID PAVEMENT
32 11 23 05/22 AGGREGATE BASE COURSE AND/OR GRADED
CRUSHED AGGREGATE BASE COURSE FOR
FLEXIBLE PAVING
32 12 13 05/24 BITUMINOUS TACK AND PRIME COATS
32 12 15.13 11/20, CHG 1: 05/22 ASPHALT PAVING FOR AIRFIELDS
32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING
32 13 13.06 05/20 PORTLAND CEMENT CONCRETE PAVEMENT FOR
ROADS AND SITE FACILITIES
32 17 23.19 11/24 AIRFIELD PAVEMENT MARKINGS
32 31 13.53 11/21 HIGH-SECURITY FENCES (CHAIN LINK AND
ORNAMENTAL) AND GATES
32 92 23 04/06, CHG 1: 08/21 SODDING
DIVISION 33 - UTILITIES
33 01 30.72 11/21 RELINING STORM SEWERS
33 05 23 08/15, CHG 2: 08/16 TRENCHLESS UTILITY INSTALLATION
33 40 00 11/21 STORMWATER UTILITIES
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
Certified Final
-- 3 of 354 --
P2#470584 - Repair & Maintain Airfield Stormwater System PhII 9 January 2026
Dobbins Air Reserve Base, GA
THIS PAGE INTENTIONALLY LEFT BLANK
PROJECT TABLE OF CONTENTS Page 2
Certified Final
-- 4 of 354 --
P2#470584 - Repair & Maintain Airfield Stormwater System PhII 9 January 2026
Dobbins Air Reserve Base, GA
SECTION 00 01 07
SEALS PAGE
01/26
PART 1 GENERAL
1.1 DESIGN PROFESSIONALS OF RECORD
A. Civil Engineer:
1. Tanya L. Norman, PE
2. GA PE# 038055
3. Responsible for Divisions listed below:
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
DIVISION 31 - EARTHWORK
31 00 00.00 06 EARTHWORK
31 11 00 CLEARING AND GRUBBING
31 16 00 CENTRIFUGALLY CAST CONCRETE PIPE
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19.61 SEALING OF JOINTS IN RIGID PAVEMENT
32 11 23 AGGREGATE BASE COURSE FOR FLEXIBLE PAVING
32 12 13 BITUMINOUS TACK AND PRIME COATS
32 12 15.13 ASPHALT PAVING FOR AIRFIELDS
32 12 16.16 ROAD-MIX ASPHALT PAVING
32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS/FACILITIES
32 17 23.19 AIRFIELD PAVEMENT MARKINGS
32 31 13.53 HIGH-SECURITY FENCES (CHAIN LINK/ORNAMENTAL) AND GATES
32 92 23 SODDING
DIVISION 33 - UTILITIES
33 01 30.72 RELINING STORM SEWERS
33 05 23 TRENCHES UTILITY INSTALLATION
33 40 00 STORMWATER UTILITIES
* For this specifications section, the seal on this page only applies to
the portions pertinent to this discipline.
DOCUMENT 00 01 07 Page 1
Certified Final
01/09/2026
-- 5 of 354 --
P2#470584 - Repair & Maintain Airfield Stormwater System PhII 9 January 2026
Dobbins Air Reserve Base, GA
B. Structural Engineer:
1. Paul S. Carter, PE
2. GA SE# 00089
3. Responsible for Divisions listed below:
DIVISION 03 - CONCRETE
03 62 15.00 06 FLOWABLE FILL
* For this specifications section, the seal on this page only applies to
the portions pertinent to this discipline.
-- End of Section --
DOCUMENT 00 01 07 Page 2
Certified Final
01/08/26
-- 6 of 354 --
P2#470584 - Repair & Maintain Airfield Stormwater System PhII 9 January 2026
Dobbins Air Reserve Base, GA
SECTION 01 01 00
GENERAL REQUIREMENTS
01/19
PART 1 GENERAL
1.1 PROJECT INFORMATION
This project includes the all work necessary to maintain the stormwater
drainage systems on Dobbins ARB.
1.1.1 Contract Drawings and Specifications
a. Drawings for Dobbins Airfield Storm Water System Phase 2.
b. 01 01 00 GENERAL REQUIREMENTS
c. 01 33 00 SUBMITTALS
d. 01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
e. 01 50 00 TEMPORARY ENVIRONMENTAL CONTROLS
f. 01 56 00 DOBBINS ARB ENVIRONMENTAL REQUIREMENTS
g. 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
h. 02 41 00 DEMOLITION
i. 03 62 15.00 06 FLOWABLE FILL
j. 31 00 00.00 06 EARTHWORK
k. 31 11 00 CLEARING AND GRUBBING
l. 31 16 00 CENTRIFUGALLY CAST CONCRETE
m. 32 01 19.61 SEALING OF JOINTS IN RIGID PAVEMENT
n. 32 11 23 AGGREGATE BASE COURSES
o. 32 12 13 BITUMINOUS TACK AND PRIME COATS
p. 32 12 15.13 ASPHALT PAVING FOR AIRFIELDS
q. 32 12 16.16 ROAD-MIX ASPHALT PAVING
r. 32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT
s. 32 17 23.19 AIRFIELD PAVEMENT MARKINGS
t. 32 31 13.53 HIGH-SECURITY FENCES
u. 32 92 23 SODDING
v. 33 01 30.72 RELINING STORM SEWERS
w. 33 05 23 TRENCHLESS UTILITY INSTALLATION
x. 33 40 00 STORM DRAINAGE UTILITIES
1.2 SUBMITTALS
Submittals shall be submitted in accordance with Section 01 33 00,
SUBMITTAL PROCEDURES.
NOTE: The contractor shall obtain Government approval of all materials and
equipment requiring submittals prior to bringing these materials and
equipment onto Dobbins ARB for installation and incorporation into the
work. The contractor shall follow section 01 33 00 of the basic contract
in obtaining Government approval.
1.2.1 Administrative or Close-out Submittal
SD-11 Closeout Submittals
a. Construction Phasing (ref: paragraph 3.2.1)
b. Daily Progress Reports to Contracting Officer withi…
Source: SAM.gov, as posted. Verify the current solicitation before responding.