Repair & Maintain Airfield Stormwater System Phase II

DEPT OF DEFENSE

Notice type
Presolicitation
Solicitation #
FGWB21000AB_2
NAICS
237110
PSC
Z2NZ
Posted
June 15, 2026
Response due
August 10, 2026
Place of performance
Marietta, GA

What this opportunity is

The Department of Defense is seeking a contractor to repair and maintain an airfield stormwater system in Georgia. This opportunity is suitable for small businesses that specialize in heavy construction, specifically those with experience in civil engineering projects, as indicated by the NAICS code 237110. The presolicitation notice indicates that the government is in the process of gathering information and may issue a solicitation in the future, so interested parties should track the opportunity for updates.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

SPECIFICATIONS Certified Final USACE Louisville District Repair & Maintain Airfield Stormwater System Phase II Dobbins Air Reserve Base, GA Marietta, Georgia 9 January 2025 Project #: FGWB-04-0014-P2A/B P2#: 470584 FY2026 AE Project #:1230218 -- 1 of 354 -- P2#470584 - Repair & Maintain Airfield Stormwater System PhII 9 January 2026 Dobbins Air Reserve Base, GA THIS PAGE INTENTIONALLY LEFT BLANK Certified Final -- 2 of 354 -- P2#470584 - Repair & Maintain Airfield Stormwater System PhII 9 January 2026 Dobbins Air Reserve Base, GA PROJECT TABLE OF CONTENTS DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 00 01 07 01/26 SEALS PAGE DIVISION 01 - GENERAL REQUIREMENTS 01 01 00 01/19 GENERAL REQUIREMENTS 01 33 00 01/19 SUBMITTALS 01 42 00 05/24 SOURCES FOR REFERENCE PUBLICATIONS 01 50 00 11/20, CHG 2: 08/22 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS 01 56 00 05/25 DOBBINS ARB ENVIRONMENTAL REQUIREMENTS 01 57 19 08/22 TEMPORARY ENVIRONMENTAL CONTROLS DIVISION 02 - EXISTING CONDITIONS 02 41 00 08/22 DEMOLITION DIVISION 03 - CONCRETE 03 62 15.00 06 07/16 FLOWABLE FILL DIVISION 31 - EARTHWORK 31 00 00.00 06 07/18 EARTHWORK 31 11 00 11/18 CLEARING AND GRUBBING 31 16 00 03/17 CENTRIFUGALLY CAST CONCRETE PIPE DIVISION 32 - EXTERIOR IMPROVEMENTS 32 01 19.61 11/19CHG 1: 11/24 SEALING OF JOINTS IN RIGID PAVEMENT 32 11 23 05/22 AGGREGATE BASE COURSE AND/OR GRADED CRUSHED AGGREGATE BASE COURSE FOR FLEXIBLE PAVING 32 12 13 05/24 BITUMINOUS TACK AND PRIME COATS 32 12 15.13 11/20, CHG 1: 05/22 ASPHALT PAVING FOR AIRFIELDS 32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING 32 13 13.06 05/20 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE FACILITIES 32 17 23.19 11/24 AIRFIELD PAVEMENT MARKINGS 32 31 13.53 11/21 HIGH-SECURITY FENCES (CHAIN LINK AND ORNAMENTAL) AND GATES 32 92 23 04/06, CHG 1: 08/21 SODDING DIVISION 33 - UTILITIES 33 01 30.72 11/21 RELINING STORM SEWERS 33 05 23 08/15, CHG 2: 08/16 TRENCHLESS UTILITY INSTALLATION 33 40 00 11/21 STORMWATER UTILITIES -- End of Project Table of Contents -- PROJECT TABLE OF CONTENTS Page 1 Certified Final -- 3 of 354 -- P2#470584 - Repair & Maintain Airfield Stormwater System PhII 9 January 2026 Dobbins Air Reserve Base, GA THIS PAGE INTENTIONALLY LEFT BLANK PROJECT TABLE OF CONTENTS Page 2 Certified Final -- 4 of 354 -- P2#470584 - Repair & Maintain Airfield Stormwater System PhII 9 January 2026 Dobbins Air Reserve Base, GA SECTION 00 01 07 SEALS PAGE 01/26 PART 1 GENERAL 1.1 DESIGN PROFESSIONALS OF RECORD A. Civil Engineer: 1. Tanya L. Norman, PE 2. GA PE# 038055 3. Responsible for Divisions listed below: DIVISION 02 - EXISTING CONDITIONS 02 41 00 DEMOLITION DIVISION 31 - EARTHWORK 31 00 00.00 06 EARTHWORK 31 11 00 CLEARING AND GRUBBING 31 16 00 CENTRIFUGALLY CAST CONCRETE PIPE DIVISION 32 - EXTERIOR IMPROVEMENTS 32 01 19.61 SEALING OF JOINTS IN RIGID PAVEMENT 32 11 23 AGGREGATE BASE COURSE FOR FLEXIBLE PAVING 32 12 13 BITUMINOUS TACK AND PRIME COATS 32 12 15.13 ASPHALT PAVING FOR AIRFIELDS 32 12 16.16 ROAD-MIX ASPHALT PAVING 32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS/FACILITIES 32 17 23.19 AIRFIELD PAVEMENT MARKINGS 32 31 13.53 HIGH-SECURITY FENCES (CHAIN LINK/ORNAMENTAL) AND GATES 32 92 23 SODDING DIVISION 33 - UTILITIES 33 01 30.72 RELINING STORM SEWERS 33 05 23 TRENCHES UTILITY INSTALLATION 33 40 00 STORMWATER UTILITIES * For this specifications section, the seal on this page only applies to the portions pertinent to this discipline. DOCUMENT 00 01 07 Page 1 Certified Final 01/09/2026 -- 5 of 354 -- P2#470584 - Repair & Maintain Airfield Stormwater System PhII 9 January 2026 Dobbins Air Reserve Base, GA B. Structural Engineer: 1. Paul S. Carter, PE 2. GA SE# 00089 3. Responsible for Divisions listed below: DIVISION 03 - CONCRETE 03 62 15.00 06 FLOWABLE FILL * For this specifications section, the seal on this page only applies to the portions pertinent to this discipline. -- End of Section -- DOCUMENT 00 01 07 Page 2 Certified Final 01/08/26 -- 6 of 354 -- P2#470584 - Repair & Maintain Airfield Stormwater System PhII 9 January 2026 Dobbins Air Reserve Base, GA SECTION 01 01 00 GENERAL REQUIREMENTS 01/19 PART 1 GENERAL 1.1 PROJECT INFORMATION This project includes the all work necessary to maintain the stormwater drainage systems on Dobbins ARB. 1.1.1 Contract Drawings and Specifications a. Drawings for Dobbins Airfield Storm Water System Phase 2. b. 01 01 00 GENERAL REQUIREMENTS c. 01 33 00 SUBMITTALS d. 01 42 00 SOURCES FOR REFERENCE PUBLICATIONS e. 01 50 00 TEMPORARY ENVIRONMENTAL CONTROLS f. 01 56 00 DOBBINS ARB ENVIRONMENTAL REQUIREMENTS g. 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS h. 02 41 00 DEMOLITION i. 03 62 15.00 06 FLOWABLE FILL j. 31 00 00.00 06 EARTHWORK k. 31 11 00 CLEARING AND GRUBBING l. 31 16 00 CENTRIFUGALLY CAST CONCRETE m. 32 01 19.61 SEALING OF JOINTS IN RIGID PAVEMENT n. 32 11 23 AGGREGATE BASE COURSES o. 32 12 13 BITUMINOUS TACK AND PRIME COATS p. 32 12 15.13 ASPHALT PAVING FOR AIRFIELDS q. 32 12 16.16 ROAD-MIX ASPHALT PAVING r. 32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT s. 32 17 23.19 AIRFIELD PAVEMENT MARKINGS t. 32 31 13.53 HIGH-SECURITY FENCES u. 32 92 23 SODDING v. 33 01 30.72 RELINING STORM SEWERS w. 33 05 23 TRENCHLESS UTILITY INSTALLATION x. 33 40 00 STORM DRAINAGE UTILITIES 1.2 SUBMITTALS Submittals shall be submitted in accordance with Section 01 33 00, SUBMITTAL PROCEDURES. NOTE: The contractor shall obtain Government approval of all materials and equipment requiring submittals prior to bringing these materials and equipment onto Dobbins ARB for installation and incorporation into the work. The contractor shall follow section 01 33 00 of the basic contract in obtaining Government approval. 1.2.1 Administrative or Close-out Submittal SD-11 Closeout Submittals a. Construction Phasing (ref: paragraph 3.2.1) b. Daily Progress Reports to Contracting Officer withi

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗