Replacement of Irrigation System, Clayton, NC

AGRICULTURE, DEPARTMENT OF

Notice type
Combined Synopsis/Solicitation
Solicitation #
1232SA26Q0678
NAICS
237110
PSC
J045
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
June 17, 2026
Response due
July 8, 2026
Place of performance
Clayton, NC

What this opportunity is

The Department of Agriculture is buying replacement irrigation system services at the Central Crops Experiment Station in Clayton, NC. This total small business set-aside opportunity suits small businesses, as indicated by the NAICS code 237110. The combined synopsis/solicitation notice type means that businesses should track this opportunity closely, as it may proceed to a bid phase.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

Perform Services for Replacement Irrigation System at Central Crops Experiment Station Clayton, NC April 18, 2025 SPECIFICATIONS Final Submittal -- 1 of 276 -- -- 2 of 276 -- Perform Services for Replacement Irrigation System Central Crops Experiment Station, Clayton, NC PROJECT TABLE OF CONTENTS DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 00 01 15 02/24 LIST OF DRAWINGS DIVISION 01 - GENERAL REQUIREMENTS 01 11 00 02/24 SUMMARY OF WORK 01 30 00 11/20, CHG 4: 08/24 ADMINISTRATIVE REQUIREMENTS 01 32 16.00 20 08/18, CHG 1: 08/20 SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES 01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES 01 42 00 05/24 SOURCES FOR REFERENCE PUBLICATIONS 01 45 00 08/23, CHG 1: 05/24 QUALITY CONTROL 01 50 00 11/20, CHG 3: 08/24 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS 01 57 19 08/22 TEMPORARY ENVIRONMENTAL CONTROLS 01 78 00 05/19, CHG 1: 08/21 CLOSEOUT SUBMITTALS 01 78 23 05/23 OPERATION AND MAINTENANCE DATA DIVISION 03 - CONCRETE 03 30 00 02/19, CHG 9: 08/24 CAST-IN-PLACE CONCRETE DIVISION 13 - SPECIAL CONSTRUCTION 13 34 19 08/20, CHG 1: 02/21 METAL BUILDING SYSTEMS DIVISION 26 - ELECTRICAL 26 05 19.00 10 11/22 INSULATED WIRE AND CABLE 26 51 00 05/20, CHG 2: 11/21 INTERIOR LIGHTING DIVISION 31 - EARTHWORK 31 00 00 08/23 EARTHWORK DIVISION 32 - EXTERIOR IMPROVEMENTS 32 31 13 11/21 CHAIN LINK FENCES AND GATES 32 92 19 08/17, CHG 1: 08/21 SEEDING DIVISION 33 - UTILITIES 33 11 00 08/24 WATER UTILITY DISTRIBUTION PIPING DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION 35 45 04.00 10 11/20 IRRIGATION PUMP, CENTRIFUGAL TYPE -- End of Project Table of Contents -- PROJECT TABLE OF CONTENTS Page 1 -- 3 of 276 -- THIS PAGE IS INTENTIONALLY LEFT BLANK -- 4 of 276 -- Perform Services for Replacement Irrigation System Central Crops Experiment Station, Clayton, NC DOCUMENT 00 01 15 LIST OF DRAWINGS 02/24 PART 1 GENERAL 1.1 SUMMARY This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings and Specifications." 1.2 CONTRACT DRAWINGS Contract drawings are as follows: GENERAL G-001 COVER SHEET G-002 LEGENDS, ABBREVIATIONS, AND NOTES CIVIL C001 GENERAL NOTES, LEGEND, AND ABBREVIATIONS C002 KEY PLAN VF101 EXISTING CONDITIONS VF102 EXISTING CONDITIONS VF103 EXISTING CONDITIONS VF104 EXISTING CONDITIONS VF105 EXISTING CONDITIONS VF106 EXISTING CONDITIONS VF107 EXISTING CONDITIONS VF108 EXISTING CONDITIONS VF109 EXISTING CONDITIONS VF110 EXISTING CONDITIONS VF111 EXISTING CONDITIONS VF112 EXISTING CONDITIONS VF113 EXISTING CONDITIONS C101 UTILITY PLAN C102 UTILITY PLAN C103 UTILITY PLAN C104 UTILITY PLAN C105 UTILITY PLAN C106 UTILITY PLAN C107 UTILITY PLAN C108 UTILITY PLAN C109 UTILITY PLAN C110 UTILITY PLAN C111 UTILITY PLAN C112 UTILITY PLAN C113 UTILITY PLAN C200 PROFILE OVERVIEW C201 PROFILES C202 PROFILES C203 PROFILES C204 PROFILES C205 PROFILES C206 PROFILES C207 PROFILES C208 PROFILES DOCUMENT 00 01 15 Page 1 -- 5 of 276 -- Perform Services for Replacement Irrigation System Central Crops Experiment Station, Clayton, NC C209 PROFILES C210 PROFILES C211 PROFILES C212 PROFILES C501 DETAILS C502 DETAILS C503 DETAILS C504 DETAILS ARCHITECTURAL AD101 DEMOLITION PLAN AND ELEVATIONS A101 SMALL SHELTER PLANS AND ELEVATIONS A102 LARGE SHELTER PLANS AND ELEVATIONS STRUCTURAL S-001 STRUCTURAL GENERAL NOTES AND ABBREVIATIONS STRUCTURAL GENERAL NOTES AND LEGEND FOUNDATION PLAN FOUNDATION PLAN FOUNDATION SECTIONS S-002 SB101 SB102 SB301 SB501 TYPICAL FOUNDATION/SLAB DETAILS PLUMBING P100 OVERALL SITE PLAN P101 PUMP SHELTER DETAILS P102 YORK POND PUMP SHELTER DETAILS DEMOLITION P103 YORK POND PUMP SHELTER DETAILS AND NEW WORK P200 GOODMAN POND PUMP DETAILS P201 PATTERSON POND PUMP DETAILS P202 LOFTON POND PUMP DETAILS P203 LOFTON POND PUMP DETAILS ELECTRICAL E201 GOODMAN POND PUMP ELECTRICAL DETAILS E202 PATTERSON POND PUMP ELECTRICAL DETAILS E203 LOFTON POND PUMP ELECTRICAL DETAILS E204 YORK POND PUMP SHELTER ELECTRICAL DETAILS E205 YORK POND PUMP SHELTER ELECTRICAL DETAILS -- End of Document -- DOCUMENT 00 01 15 Page 2 -- 6 of 276 -- Perform Services for Replacement Irrigation System Central Crops Experiment Station, Clayton, NC SECTION 01 11 00 SUMMARY OF WORK 02/24 PART 1 GENERAL 1.1 SUBMITTALS Government approval is required for submittals with a "G" or "S" classification. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES: SD-01 Preconstruction Submittals Salvage Plan; G 1.2 WORK COVERED BY CONTRACT DOCUMENTS 1.2.1 Project Description The work includes removal and reconstruction of on-site irrigation facilities and pump sheds, sitework, and incidental related work. 1.2.2 Location The work is located at the USDA Central Crops Experiment Station, Clayton, NC, approximately as indicated. The exact location will be shown by the Contracting Officer. 1.3 OCCUPANCY OF PREMISES Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways. 1.4 EXISTING WORK Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started. 1.5 LOCATION OF UNDERGROUND UTILITIES Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities. Contact local utility locating service a minimum of 48 hours prior to excavating, to mark utilities, and within sufficient time required if work occurs on a Monday or after a Hol

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 237110)