Replacement of Irrigation System, Clayton, NC
AGRICULTURE, DEPARTMENT OF
Notice type
Combined Synopsis/Solicitation
Solicitation #
1232SA26Q0678
NAICS
237110
PSC
J045
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
June 17, 2026
Response due
July 8, 2026
Place of performance
Clayton, NC
What this opportunity is
The Department of Agriculture is buying replacement irrigation system services at the Central Crops Experiment Station in Clayton, NC. This total small business set-aside opportunity suits small businesses, as indicated by the NAICS code 237110. The combined synopsis/solicitation notice type means that businesses should track this opportunity closely, as it may proceed to a bid phase.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
Perform Services for Replacement
Irrigation System at Central Crops
Experiment Station
Clayton, NC
April 18, 2025
SPECIFICATIONS
Final Submittal
-- 1 of 276 --
-- 2 of 276 --
Perform Services for Replacement Irrigation System
Central Crops Experiment Station, Clayton, NC
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15 02/24 LIST OF DRAWINGS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 02/24 SUMMARY OF WORK
01 30 00 11/20, CHG 4: 08/24 ADMINISTRATIVE REQUIREMENTS
01 32 16.00 20 08/18, CHG 1: 08/20 SMALL PROJECT CONSTRUCTION PROGRESS
SCHEDULES
01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES
01 42 00 05/24 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00 08/23, CHG 1: 05/24 QUALITY CONTROL
01 50 00 11/20, CHG 3: 08/24 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19 08/22 TEMPORARY ENVIRONMENTAL CONTROLS
01 78 00 05/19, CHG 1: 08/21 CLOSEOUT SUBMITTALS
01 78 23 05/23 OPERATION AND MAINTENANCE DATA
DIVISION 03 - CONCRETE
03 30 00 02/19, CHG 9: 08/24 CAST-IN-PLACE CONCRETE
DIVISION 13 - SPECIAL CONSTRUCTION
13 34 19 08/20, CHG 1: 02/21 METAL BUILDING SYSTEMS
DIVISION 26 - ELECTRICAL
26 05 19.00 10 11/22 INSULATED WIRE AND CABLE
26 51 00 05/20, CHG 2: 11/21 INTERIOR LIGHTING
DIVISION 31 - EARTHWORK
31 00 00 08/23 EARTHWORK
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 31 13 11/21 CHAIN LINK FENCES AND GATES
32 92 19 08/17, CHG 1: 08/21 SEEDING
DIVISION 33 - UTILITIES
33 11 00 08/24 WATER UTILITY DISTRIBUTION PIPING
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 45 04.00 10 11/20 IRRIGATION PUMP, CENTRIFUGAL TYPE
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
-- 3 of 276 --
THIS PAGE IS INTENTIONALLY LEFT BLANK
-- 4 of 276 --
Perform Services for Replacement Irrigation System
Central Crops Experiment Station, Clayton, NC
DOCUMENT 00 01 15
LIST OF DRAWINGS
02/24
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause
"DFARS 252.236-7001, Contract Drawings and Specifications."
1.2 CONTRACT DRAWINGS
Contract drawings are as follows:
GENERAL
G-001 COVER SHEET
G-002 LEGENDS, ABBREVIATIONS, AND NOTES
CIVIL
C001 GENERAL NOTES, LEGEND, AND ABBREVIATIONS
C002 KEY PLAN
VF101 EXISTING CONDITIONS
VF102 EXISTING CONDITIONS
VF103 EXISTING CONDITIONS
VF104 EXISTING CONDITIONS
VF105 EXISTING CONDITIONS
VF106 EXISTING CONDITIONS
VF107 EXISTING CONDITIONS
VF108 EXISTING CONDITIONS
VF109 EXISTING CONDITIONS
VF110 EXISTING CONDITIONS
VF111 EXISTING CONDITIONS
VF112 EXISTING CONDITIONS
VF113 EXISTING CONDITIONS
C101 UTILITY PLAN
C102 UTILITY PLAN
C103 UTILITY PLAN
C104 UTILITY PLAN
C105 UTILITY PLAN
C106 UTILITY PLAN
C107 UTILITY PLAN
C108 UTILITY PLAN
C109 UTILITY PLAN
C110 UTILITY PLAN
C111 UTILITY PLAN
C112 UTILITY PLAN
C113 UTILITY PLAN
C200 PROFILE OVERVIEW
C201 PROFILES
C202 PROFILES
C203 PROFILES
C204 PROFILES
C205 PROFILES
C206 PROFILES
C207 PROFILES
C208 PROFILES
DOCUMENT 00 01 15 Page 1
-- 5 of 276 --
Perform Services for Replacement Irrigation System
Central Crops Experiment Station, Clayton, NC
C209 PROFILES
C210 PROFILES
C211 PROFILES
C212 PROFILES
C501 DETAILS
C502 DETAILS
C503 DETAILS
C504 DETAILS
ARCHITECTURAL
AD101 DEMOLITION PLAN AND ELEVATIONS
A101 SMALL SHELTER PLANS AND ELEVATIONS
A102 LARGE SHELTER PLANS AND ELEVATIONS
STRUCTURAL
S-001 STRUCTURAL GENERAL NOTES AND ABBREVIATIONS
STRUCTURAL GENERAL NOTES AND LEGEND
FOUNDATION PLAN
FOUNDATION PLAN
FOUNDATION SECTIONS
S-002
SB101
SB102
SB301
SB501 TYPICAL FOUNDATION/SLAB DETAILS
PLUMBING
P100 OVERALL SITE PLAN
P101 PUMP SHELTER DETAILS
P102 YORK POND PUMP SHELTER DETAILS DEMOLITION
P103 YORK POND PUMP SHELTER DETAILS AND NEW WORK
P200 GOODMAN POND PUMP DETAILS
P201 PATTERSON POND PUMP DETAILS
P202 LOFTON POND PUMP DETAILS
P203 LOFTON POND PUMP DETAILS
ELECTRICAL
E201 GOODMAN POND PUMP ELECTRICAL DETAILS
E202 PATTERSON POND PUMP ELECTRICAL DETAILS
E203 LOFTON POND PUMP ELECTRICAL DETAILS
E204 YORK POND PUMP SHELTER ELECTRICAL DETAILS
E205 YORK POND PUMP SHELTER ELECTRICAL DETAILS
-- End of Document --
DOCUMENT 00 01 15 Page 2
-- 6 of 276 --
Perform Services for Replacement Irrigation System
Central Crops Experiment Station, Clayton, NC
SECTION 01 11 00
SUMMARY OF WORK
02/24
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" or "S"
classification. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Salvage Plan; G
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
The work includes removal and reconstruction of on-site irrigation
facilities and pump sheds, sitework, and incidental related work.
1.2.2 Location
The work is located at the USDA Central Crops Experiment Station, Clayton,
NC, approximately as indicated. The exact location will be shown by the
Contracting Officer.
1.3 OCCUPANCY OF PREMISES
Before work is started, arrange with the Contracting Officer a sequence of
procedure, means of access, space for storage of materials and equipment,
and use of approaches, corridors, and stairways.
1.4 EXISTING WORK
Remove or alter existing work in such a manner as to prevent injury or
damage to any portions of the existing work which remain.
Repair or replace portions of existing work which have been altered during
construction operations to match existing or adjoining work, as approved by
the Contracting Officer. At the completion of operations, existing work
must be in a condition equal to or better than that which existed before
new work started.
1.5 LOCATION OF UNDERGROUND UTILITIES
Obtain digging permits prior to start of excavation, and comply with
Installation requirements for locating and marking underground utilities.
Contact local utility locating service a minimum of 48 hours prior to
excavating, to mark utilities, and within sufficient time required if work
occurs on a Monday or after a Hol…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 237110)
Unidirectional Hydrant Flushing and Repair Program
DEPT OF DEFENSE · Solicitation · due July 6, 2026
Cahokia Heights Sanitary Sewer Trunkline Upper Limits Project
DEPT OF DEFENSE · Solicitation · due July 13, 2026
Design-Bid-Build (DBB) Repair of Storm Sewer Water and Sanitary Sewer Systems, Caserma Miotto, Longare, Vicenza, Italy.
DEPT OF DEFENSE · Presolicitation · due June 25, 2026
Rosebud Lift Station Construction
HEALTH AND HUMAN SERVICES, DEPARTMENT OF · Solicitation · due July 20, 2026
99 CES - FLOW METER FOR FACILITY 1711
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due June 23, 2026
Repair & Maintain Airfield Stormwater System Phase II
DEPT OF DEFENSE · Presolicitation · due August 10, 2026