Eareckson Air Station Container Tower
DEPT OF DEFENSE
Notice type
Combined Synopsis/Solicitation
Solicitation #
FA521526Q0112
NAICS
237130
PSC
Y1PZ
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
July 17, 2026
Response due
July 25, 2026
Place of performance
EARECKSON AS, AK
What this opportunity is
The government is buying a container tower for Eareckson Air Station. This procurement is set aside for total small businesses. The work will be performed in Alaska. As a combined synopsis and solicitation, small businesses should be prepared to bid immediately rather than just tracking the opportunity.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
-- 1 of 19 --
-- 2 of 19 --
-- 3 of 19 --
REV:
DWN:
ENG'R:
DRAWING NO:
DATE: CHK'D:
DESCRIPTION REV.
FILE NO.
REVISIONS
DWN
PRODUCTS LLC
PEORIA, IL 61601-5999
TOLL FREE 800-727-ROHN
PO BOX 5999
THIS DRAWING IS THE PROPERTY OF ROHN. IT IS NOT TO BE
REPRODUCED, COPIED OR TRACED IN WHOLE OR IN PART WITHOUT
OUR WRITTEN CONSENT.
CHK APP
SHEET #:
PRJ. ENG'R: PRJ. MANG'R:
R
JHY JDM
SY
FM060
PRE-INSTALLATION INSPECTION
FORM NUMBER: FM060
09/03/2019
ROHN
3
1 OF 1
DATE:
3
ADDED NOTES 1 THROUGH 5
03/18/2024
SY JDM JHY
WE APPRECIATE YOUR FEEDBACK!
PLEASE TAKE OUR 2 MINUTE
SURVEY TO HELP US IMPROVE!
PRE-INSTALLATION INSPECTION
THANK YOU FOR THE PURCHASE OF YOUR ROHN PRODUCT. WE ARE EXCITED THAT YOU CHOOSE ROHN TO SUPPLY
YOU WITH A QUALITY PRODUCT. IN ORDER TO COMMUNICATE EFFECTIVELY, ELIMINATE ERRORS AND PROVIDE A
SMOOTH INSTALLATION EXPERIENCE, IT IS IMPORTANT FOR THE INSTALLER TO PERFORM A PRE-INSTALLATION
INSPECTION OF ALL COMPONENTS/PARTS ASSOCIATED WITH YOUR ORDER. PRIOR TO THE INSTALLATION, THE
FOLLOWING INSPECTIONS ARE REQUIRED:
1. ROHN WILL SHIP MONOPOLES AND TOWERS ON DEDICATED FLATBED TRAILERS. THE CARRIER'S DRIVER WILL
DETERMINE WHETHER THE SITE IS ACCESSIBLE FOR DELIVERY. IF THE DRIVER DETERMINES THAT IT IS
IMPOSSIBLE TO REACH THE SITE WITHOUT DAMAGING THE MATERIAL, TRUCK OR TRAILER, THE BUYER IS
RESPONSIBLE FOR FINDING AN ALTERNATIVE SITE FOR UNLOADING. ROHN DOES NOT ASSUME LIABILITY FOR
COSTS INCURRED BY THE BUYER BECAUSE OF DELAYED DELIVERY BEYOND THE CONTROL OF ROHN.
2. PRIOR TO UNLOADING THE CARRIER, THE CREW MUST VISUALLY INSPECT THE PRODUCT FOR ANY DAMAGES THAT
MAY HAVE OCCURRED DURING SHIPMENT. DAMAGES THAT ARE NOT NOTED BY THE CREW ON ROHN'S BILL OF
LADING BEFORE SIGNING IT WILL BE THE BUYER'S RESPONSIBILITY.
3. AFTER UNLOADING THE MATERIAL, THE CREW MUST INVENTORY THE MATERIAL AGAINST THE BILL OF MATERIAL
PROVIDED BY ROHN AND MAKE ALL CLAIMS FOR SHORTAGES WITHIN 48 HOURS OF DELIVERY. ROHN WILL NOT BE
RESPONSIBLE FOR CLAIMS MADE AFTER 48 HOURS FROM DELIVERY.
4. THE CREW WILL HAVE 2 HOURS FROM THE ARRIVAL TIME TO UNLOAD THE SHIPMENT. IF THE CARRIER IS DELAYED
LONGER THAN 2 HOURS, AN ADDITIONAL FREIGHT CHARGE MAY APPLY.
5. ADDITIONAL FREIGHT CHARGES MAY BE INCURRED IF THE DELIVERY ADDRESS OR DATE IS CHANGED DURING
MID-DELIVERY.
6. IF THERE ARE PARTS THAT ARE FABRICATED INCORRECTLY AND THE PARTS WERE NOT EASILY DETECTABLE DURING
THE PRE-INSTALLATION INSPECTION, ROHN MUST BE NOTIFIED IMMEDIATELY UPON IDENTIFICATION OF THE
PARTS. IN ADDITION, PICTURES MUST BE TAKEN OF THE ISSUES AND SENT TO ROHN IMMEDIATELY.
7. IT IS IMPORTANT TO VERIFY THE ASSEMBLY DRAWINGS AND ANCHOR ROD LAYOUT DRAWINGS ARE RECEIVED WITH
THE DELIVERY, WHEN ANCHOR RODS ARE TO BE INSTALLED. IN ADDITION, IT IS IMPORTANT TO VERIFY THE
ANCHOR ROD TEMPLATE PART NUMBERS MATCH THE DESIGNATED PART NUMBERS ON THE ANCHOR ROD LAYOUT
DRAWING. IF THERE ARE DISCREPANCIES, NOTIFY ROHN IMMEDIATELY. ROHN WILL NOT BE RESPONSIBLE FOR
CHARGES ASSOCIATED WITH INSTALLING THE WRONG SIZE ANCHOR RODS, THE WRONG NUMBER OF ANCHOR RODS
OR THE INCORRECT ANCHOR ROD ORIENTATION.
8. TRIAL ASSEMBLY OF COMPONENTS ON LEVEL GROUND IS RECOMMENDED PRIOR TO ERECTION TO DETERMINE THE
PROPER ASSEMBLY SEQUENCE.
9. IF PART SHORTAGES OR DAMAGED MATERIAL ARE FOUND, ROHN MUST BE NOTIFIED IMMEDIATELY TO ALLOW ROHN
TIME TO REPAIR OR EXPEDITE NEW PARTS/MATERIALS TO THE JOB SITE.
10. INDIVIDUAL BOLT ORIENTATION (NUT UP OR DOWN) IS DISCRETIONARY UNLESS OTHERWISE NOTED.
11. ROHN WILL NOT BE RESPONSIBLE FOR EXCESS CHARGES INCLUDING CRANE CHARGES, DRILLING RIG CHARGES,
EQUIPMENT CHARGES, CREW CHARGES AND MOBILIZATION CHARGES.
12. IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT THE APPROPRIATE ROHN SALES REP/MANAGER AT (309) 566-3000.
-- 4 of 19 --
REV:
DWN:
ENG'R:
DRAWING NO:
DATE: CHK'D:
DESCRIPTION REV.
FILE NO.
REVISIONS
DWN
PRODUCTS LLC
PEORIA, IL 61601-5999
TOLL FREE 800-727-ROHN
PO BOX 5999
THIS DRAWING IS THE PROPERTY OF ROHN. IT IS NOT TO BE
REPRODUCED, COPIED OR TRACED IN WHOLE OR IN PART WITHOUT
OUR WRITTEN CONSENT.
CHK APP
SHEET #:
PRJ. ENG'R: PRJ. MANG'R:
R
OH GHB
TWS
A790135
ROHN STANDARD
BOLT ASSEMBLY INSTALLATIONS
07/05/1979
9
1 OF 2
ROHN STANDARD BOLT ASSEMBLIES
1. ALL BOLTED CONNECTIONS ARE SNUG TIGHT CONNECTIONS
UNLESS PRESTRESSED BOLTS ARE INDICATED ON AN ASSEMBLY
DRAWING.
2. ROHN STANDARD BOLT ASSEMBLIES ARE ILLUSTRATED ON THE
ADJACENT INSTALLATION DETAILS. WHEN SPECIFIED BY THE
PURCHASER, OPTIONAL NUT-LOCKING DEVICES (TRI-LOC NUTS,
ANCO NUTS, OR LOCK WASHERS) ARE PROVIDED AS A
SUBSTITUTE FOR PAL NUTS FOR SNUG TIGHT CONNECTIONS
(REFER TO SHEET 2 FOR INSTALLATION DETAILS).
3. TRI-LOC NUTS ARE PROVIDED AS STANDARD NUT-LOCKING
DEVICES FOR SNUG TIGHT BOLTS GREATER THAN 1 INCH
DIAMETER. ANCO NUTS ARE SUBSTITUTED FOR TRI-LOC NUTS
WHEN SPECIFIED BY THE PURCHASER.
4. PRETENSIONED BOLTS ARE PROVIDED AS AN ASSEMBLY
INCLUDING THE BOLT, NUT AND REQUIRED WASHERS AND
ARE TO BE USED, UNLESS OTHERWISE NOTED, FOR ALL
DOUBLE ANGLE CONNECTIONS AND OTHER CONNECTIONS
NOTED ON AN ASSEMBLY DRAWING. A NUT-LOCKING
DEVICE IS NOT REQUIRED OR PROVIDED FOR
PRETENSIONED BOLT ASSEMBLIES.
WASHERS
5. WASHERS ARE PROVIDED TO COVER ALL OVERSIZED HOLES AND
EXPOSED SLOTS. WHEN AN OVERSIZED HOLE OR EXPOSED SLOT
IS PRESENT ON BOTH SIDES OF A CONNECTION, A WASHER IS
REQUIRED UNDER THE BOLT HEAD AND THE NUT AND THE BOLT
ASSEMBLY SUFFIX IN THE ASSEMBLY DRAWING BOM WILL
INCLUDE AN ADDITIONAL “W”.
6. WASHERS ARE ALSO PROVIDED TO INCREASE THE GRIP
THICKNESS WHEN REQUIRED TO PREVENT THE NUT FROM
BOTTOMING OUT ON THE BOLT THREADS.
7. FOR SLOTTED GUSSET PLATE CONNECTIONS, WASHERS ARE
ONLY REQUIRED FOR SINGLE ANGLE MEMBERS (SLOT
EXPOSED ON ONE SIDE). WASHERS ARE NOT REQUIRED
OR PROVIDED FOR DOUBLE ANGLE CONNECTIONS (SLOT IS
NOT EXPOSED).
SNUG TIGHT BOLT ASSEMBLY INSTALLATION
8. UNLESS OTHERWISE NOTED, BOLT ASSEMBLIES ARE TO BE
TIGHTENED TO A SNUG TIGHT CONDITION (MEMBERS IN FIRM
CONTACT USING AN ORDINARY WRENCH OR IMPACT WRENCH)
AND SHALL INCLUDE A NUT-LOCKING DEVICE.
9. …
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 237130)
178th Wing Base Microgrid Construction
DEPT OF DEFENSE · Solicitation · due August 14, 2026
Nez Perce-Clearwater NF - Seed Orchard Disconnect and Electrical Life Safety Rehab
AGRICULTURE, DEPARTMENT OF · Combined Synopsis/Solicitation · due July 27, 2026
XUMU 20260001 OSP Oak Mountain Fiber Relocation
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due August 21, 2026
Nez Perce-Clearwater NF - Seed Orchard Disconnect and Electrical Life Safety Rehab
AGRICULTURE, DEPARTMENT OF · Combined Synopsis/Solicitation · due July 27, 2026
Eareckson Air Station Container Tower
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due July 25, 2026
New CS Fiber Optics Infrastructure Rehoming Project-156th WG PR ANG
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due August 5, 2026