The Department of Defense is seeking a contractor for the modernization of one freight elevator and one passenger elevator in Building 1020 at Edwards AFB, CA. This opportunity is set aside for small businesses, as indicated by the total small business set-aside. Interested contractors should note that this is a combined synopsis/solicitation, meaning they will need to track the notice closely for updates and submit quotes rather than responding to a formal solicitation. A site visit is highly encouraged to fully understand the project scope.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

27 May 2026 1 STATEMENT OF WORK REQUEST FOR PROPOSAL DATE OF DOCUMENT: 27 May 2026 _______________________________________________________________________ ELEVATOR MODERNIZATION B1020 PROJECT# FSPM25SP018 WORK ORDER #6458215 PROJECT MANAGER: Marcus Rodriguez Project Management Office 412 CEG / CENMP AIR FORCE TEST CENTER EDWARDS AIR FORCE BASE, CALIFORNIA 93523-8540 PHONE (661) 277-3225 -- 1 of 19 -- 27 May 2026 2 REVISION H ISTORY: NO DATE Description 1 27 May 2026 Only Building 1020 Elevators -- 2 of 19 -- 27 May 2026 3 1. SCOPE AND OBJECTIVE: The Air Force Test Center (AFTC), Edwards AFB, CA, requests a proposal for work to be accomplished for the 412 EWG for Elevator Modernization at Building 1020. The work to be accomplished includes but is not limited to the following: Conveying Systems, Fire Protection Systems, and Electrical Systems. 2. PURPOSE OF THE DOCUMENT: This Statement of Work serves as a tool for recording customer requirements, ensuring that these requirements are met and evaluating the project design before construction begins. The overall objective is to establish a plan of action for defining and achieving desired results and goals. 3. REQUIREMENTS: Work is to be performed at Bldg. 1020 located in the Integrated Facility for Avionics Systems Test (IFAST) in Edwards, AFB and will require special secured space access with personnel having the ability to enter the Sensitive Compartmented Information Facilities. All work shall be in accordance with all applicable federal, state, and local rules and regulations (to include US Air Force/Edwards AFB requirements). Contractor(s) shall be responsible for obtaining required access for work on Edwards Air Force Base. Electgricity supply to the elevator shall submit to Lock-Out-Tag-Out (LOTO) procedure. Requirements statements in this section are organized using CSI/CSC Uni-Format for Building Construction. Contractor responsible for locating all utilities. The contractor shall accomplish the following: D10 CONVEYING SYSTEMS Base Bid: B1020 Freight Elevator D1010 Vertical Transportation System Controls D1010.01 Contractor shall furnish and install new elevator microprocessor controller for each individual elevator controller and for each group controller. Elevator controller data package shall include all hardware and software required for the installation, maintenance, testing, and service of the elevator, in its entirety. Elevator controller shall -- 3 of 19 -- 27 May 2026 4 be designed to automatically reestablish normal elevator operation following any temporary loss of power, regardless of duration. Remote Interaction Operation (RIO) is not permitted to be installed. D1010.02 Contractor shall furnish and install new elevator motor control with electronic, soft starter motor starter. D1010.03 Contractor shall provide signed certification, from manufacturer’s corporate headquarters, that guarantees that the microprocessor software and access system will not terminate the unlimited and unrestricted access at any future date. Hydraulic Power Unit/Drive System D1010.04 Contractor shall furnish and install new hydraulic elevator drive system, including pump unit, piping, cylinder/plunger assembly, and associated equipment, which will operate at a maximum working pressure of 500 psi or less. Provide complete elevator system that meets or exceeds the NEII-1 Ride Quality Standard, including elevator ride quality and noise levels in car and in elevator machine room and machinery space. D1010.05 Contractor shall furnish and install all new portions hydraulic oil supply line that are installed below ground, including portions encapsulated in concrete or covered by construction, with continuous, Schedule 80, PVC. D1010.06 Contractor shall furnish and install new intermittent-duty pump motor rated at 120 starts/hour and class F insulation. Motor shall be sized so that the motor amperage does not exceed the motor data tag amperage in any operating condition, exclusive of acceleration and deceleration. D1010.07 Contractor shall furnish and install new self-contained pump unit, including oil hydraulic elevator pump, electric motor, suction-line oil strainer, and structural steel outer base with tank supports and isolation pads. D1010.08 Contractor shall furnish and install new constant-velocity, down-speed regulated, control valve. D1010.09 Contractor shall furnish and install new control valve, overspeed safety valve, blowout-proof muffler, and hydraulic pump discharge strainer in the hydraulic oil supply line. Hydraulic oil supply line hall be equipped with two (one in the elevator hoistway pit and one in the elevator machine room or machinery space) ¼ turn, ball valve type manual shutoff valves. Door Operating Equipment D1010.10 Contractor shall furnish and install new power-operated vertical rising bi- parting hoistway door packages for front and rear. -- 4 of 19 -- 27 May 2026 5 D1010.11 Contractor shall furnish and install new vertical rising gate with power door operator for car doors. Button Fixtures (ADA & Fire) D1010.12 Contractor shall furnish and install new industry-standard, vandal resistant push buttons with positive-stop assembly design. D1010.13 Contractor shall furnish and install new hall station door-operating buttons, identical in size and design to hall call buttons, but not illuminating. D1010.14 Contractor shall furnish and install two (front and rear) new car operating panels that contain operation controls and communication devices. D1010.15 Contractor shall ensure that all new operator controls are exposed and accessible. In addition to ASME A17.1/CSA B44 requirements, the Contractor shall furnish and install at the minimum the following operating controls, identified as indicated: D1010.15a. LED Illuminating car-call buttons identified to correspond to landings served by the elevator. D1010.15b. "DOOR OPEN" and "DOOR CLOSE" buttons. For front and rear openings at the same floor, incl

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 238290)