Gatehouse Exterior Stair Repair, Townshend Lake, Townshend, VT
DEPT OF DEFENSE
Notice type
Solicitation
Solicitation #
W912WJ26QA122
NAICS
238110
PSC
Y1QA
Set-aside
Service-Disabled Veteran-Owned Small Business Set Aside
Posted
June 25, 2026
Response due
July 8, 2026
Description
TOWNSHEND LAKE DAM - GATEHOUSE EXTERIOR STAIR REPAIR
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 42 00 02/19, CHG 1: 08/23 SOURCES FOR REFERENCE PUBLICATIONS
DIVISION
02 41 00
02 - EXISTING
08/22
CONDITIONS
DEMOLITION
DIVISION
03 01 00
03 - CONCRETE
02/18 REHABILITATION OF CONCRETE
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 19 00 08/23 PENETRATING SEALER
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
-- 1 of 41 --
TOWNSHEND LAKE DAM - GATEHOUSE EXTERIOR STAIR REPAIR
SECTION 02 41 00 Page 2
PART 1 GENERAL
1.1 REFERENCES
DIVISION 02 - EXISTING CONDITIONS
SECTION 02 41 00
DEMOLITION
1.2 PROJECT DESCRIPTION
1.2.1 Definitions
1.2.1.1 Demolition
1.2.1.2 Deconstruction
1.2.1.3 Demolition Plan
1.2.1.4 Deconstruction Plan
1.2.2 Demolition Plan
1.2.3 General Requirements
1.3 ITEMS TO REMAIN IN PLACE
1.3.1 Existing Construction Limits and Protection
1.3.2 Facilities
1.4 BURNING
1.5 AVAILABILITY OF WORK AREAS
1.6 SUBMITTALS
1.7 QUALITY ASSURANCE
1.7.1 Dust and Debris Control
1.8 PROTECTION
1.8.1 Traffic Control Signs
1.8.2 Protection of Personnel
1.9 RELOCATIONS
1.10 VARIATIONS
1.10.1 Considering Variations
1.10.2 Proposing Variations
1.10.3 Warranting that Variations are Compatible
1.10.4 Review Schedule Extension
1.11 EXISTING CONDITIONS
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 EXISTING FACILITIES TO BE REMOVED
3.1.1 Structures
3.1.2 Utilities and Related Equipment
3.1.2.1 General Requirements
3.1.2.2 Disconnecting Existing Utilities
3.1.3 Concrete
3.1.4 Patching
3.2 DISPOSITION OF MATERIAL
3.2.1 Title to Materials
3.2.2 Unsalvageable and Non-Recyclable Material
3.3 CLEANUP
3.4 DISPOSAL OF REMOVED MATERIALS
3.4.1 Regulation of Removed Materials
3.4.2 Burning on Government Property
3.4.3 Removal from Government Property
-- End of Section Table of Contents --
-- 2 of 41 --
TOWNSHEND LAKE DAM - GATEHOUSE EXTERIOR STAIR REPAIR
SECTION 02 41 00 Page 3
SECTION 02 41 00
DEMOLITION
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the
extent referenced. The publications are referred to within the text by
the basic designation only.
AMERICAN SOCIETY OF SAFETY PROFESSIONALS (ASSP)
ASSP A10.6 (2006) Safety & Health Program
Requirements for Demolition Operations -
American National Standard for
Construction and Demolition Operations
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2024) Safety -- Safety and Health
Requirements Manual
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
40 CFR 61 National Emission Standards for Hazardous
Air Pollutants
1.2 PROJECT DESCRIPTION
This project consists of addressing distressed conditions of concrete on
the exterior concrete staircase at the Intake Tower. Repairs include
removing all unsound concrete substrate and repair with a polymer modified
concrete repair material. Along with concrete repairs a water repellent
penetrant will be intalled to all of the exterior stair concrete surfaces.
1.2.1 Definitions
1.2.1.1 Demolition
Demolition is the process of tearing apart and removing any feature of a
facility together with any related handling and disposal operations.
-- 3 of 41 --
TOWNSHEND LAKE DAM - GATEHOUSE EXTERIOR STAIR REPAIR
SECTION 02 41 00 Page 4
conduct
1.2.1.2 Deconstruction
Deconstruction is the process of taking apart a facility with the primary
goal of preserving the value of all useful building materials.
1.2.1.3 Demolition Plan
Demolition Plan is the planned steps and processes for managing demolition
activities and identifying the required sequencing activities and disposal
mechanisms.
1.2.1.4 Deconstruction Plan
Deconstruction Plan is the planned steps and processes for dismantling all
or portions of a structure or assembly, to include managing sequencing
activities, storage, re-installation activities, salvage and disposal
mechanisms.
1.2.2 Demolition Plan
Prepare a Demolition Plan and submit proposed demolition, and removal
procedures for approval before work is started. Include in the plan
procedures for careful removal and disposition of materials specified to
be salvaged, coordination with other work in progress. Coordinate Waste
Management and disposal with Technical Point of Contact . Provide procedures for
safe the work in accordance with EM 385-1-1. Plan must be approved by
Technical Point of Contact prior to work beginning.
1.2.3 General Requirements
Do not begin demolition or deconstruction until authorization is received
from the Technical Point of Contact . Remove rubbish and debris from
the project site; do not allow accumulations of debris within the work
area. The work
includes demolition and removal of resulting rubbish and debris. Remove
rubbish and debris from Government property daily, unless otherwise
directed. Store materials that cannot be removed daily in areas specified
by the Technical Point of Contact .In the interest of occupational
safety and health, perform the work in accordance with EM 385-1-1,
Section 23, Demolition, and other applicable Sections.
1.3 ITEMS TO REMAIN IN PLACE
Comply with FAR 52.236-9 to protect existing vegetation, structures,
equipment, utilities, and improvements. Coordinate the work of this
section with all other work indicated. Construct and maintain shoring,
bracing, and supports as required. Ensure that structural elements are
not overloaded. Increase structural supports or add new supports as may
be required as a result of any cutting, removal, deconstruction, or
demolition work performed under this contract. Do not overload structural
elements. Provide new supports and reinforcement for existing
construction weakened by demolition, deconstruction, or removal work.
Repairs, reinforcement, or structural replacement require approval by the
Technical Point of Contact prior to performing such work.
1.3.1 Existing Construction Limits and Protection
Do not disturb existing construction beyond the extent indicated or
n…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 238110)
Z--Demo & Install of ADA Ramp for Mescalero Agency
INTERIOR, DEPARTMENT OF THE · Solicitation · due July 29, 2026
Hart Bar Concrete Project
INTERIOR, DEPARTMENT OF THE · Solicitation · due August 10, 2026
Triadelphia - A&CC Concrete Project
LABOR, DEPARTMENT OF · Solicitation · due July 22, 2026
Hawaiian Humpback Whale NMS Concrete Entrance Berm
COMMERCE, DEPARTMENT OF · Combined Synopsis/Solicitation · due July 31, 2026
Decommission and Remove Lift
AGRICULTURE, DEPARTMENT OF · Combined Synopsis/Solicitation · due July 31, 2026
Loading Dock Repairs
AGRICULTURE, DEPARTMENT OF · Combined Synopsis/Solicitation · due August 14, 2026