Greenhouse Phase V Renovation (Fargo, ND)

AGRICULTURE, DEPARTMENT OF

Notice type
Combined Synopsis/Solicitation
Solicitation #
1232SA26Q0870
NAICS
236220
PSC
Z1JZ
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
July 10, 2026
Response due
July 30, 2026
Place of performance
Fargo, ND

What this opportunity is

The Department of Agriculture is buying construction services for the Greenhouse Phase V Renovation in Fargo, ND, which suits total small businesses. The project involves renovation, demolition, and hazardous material removal of a greenhouse range. As a Combined Synopsis/Solicitation notice, small businesses should track this opportunity closely to prepare for a potential bid.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

100% - Issued For Construction Greenhouse Renovation – Phase V Fargo, ND Specifications NORTHERN CROP SCIENCE LABORATORIES (NCSL) FARGO, ND A-E Contract No: 12805B23D0005 Task Order No: 1232SA26F0124 Submitted to: U.S. DEPARTMENT OF AGRICULTURAL RESEARCH SERVICE 2 June 2026 Submitted by: The Schemmer Associates Stantec -- 1 of 687 -- -- 2 of 687 -- USDA Greenhouse Renovation - Phase V 100% Submittal - Issued for Construction NCSL - Fargo, North Dakota 2 June 2026 Project Information 00-01-02 - Page 1 SECTION 00-01-02 - PROJECT INFORMATION PART 1 GENERAL 1.01 PROJECT IDENTIFICATION A. Project Name: USDA NCSL Greenhouse Renovation Ph V. B. Architect's Project Number: 09228.021. 1307 18th Street North. Fargo, North Dakota 58102. C. The Owner, hereinafter referred to as Owner: USDA Ag Research Service 1.02 PROJECT DESCRIPTION A. Summary Project Description: Project is to completely renovate one greenhouse range. Bid alternates are further explained on the Bid Form and Sheet G001. B. Contract Scope: Construction, demolition, renovation, and hazardous material removal. C. Fixed Contract Amount: 1.03 PROCUREMENT TIMETABLE A. The Owner reserves the right to change the schedule or terminate the entire procurement process at any time. 1.04 PROCUREMENT DOCUMENTS A. Documents may be viewed at SAM.gov. PART 2 PRODUCTS (NOT USED) PART 3 EXECUTION (NOT USED) END OF SECTION 00-01-02 -- 3 of 687 -- USDA Greenhouse Renovation – Phase V 100% Submittal – Issued for Construction NCSL - Fargo, North Dakota 2 June 2026 TABLE OF CONTENTS 00-01-10 - Page 1 TABLE OF CONTENTS DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 00-01-02 PROJECT INFORMATION 00-01-10 TABLE OF CONTENTS 00-31-00 AVALIABLE PROJECT INFORMATION 00-31-26 ASBESTOS-CONTAINING MATERIALS DIVISION 01 - GENERAL REQUIREMENTS 01-01-00 GENERAL REQUIREMENTS 01-01-00.01 GENERAL REQUIREMENT FORMS 01-10-00 SUMMARY 01-23-00 ALTERNATES 01-25-00 SUBSTITUTION PROCEDURES 01-25-00.01 SUBSTITUTION REQUEST FORM 01-30-00 ADMINISTRATIVE REQUIREMENTS 01-32-16 CONSTRUCTION PROGRESS SCHEDULE 01-40-00 QUALITY REQUIREMENTS 01-50-00 TEMPORARY FACILITIES AND CONTROLS 01-57-13 TEMPORARY EROSION AND SEDIMENT CONTROL 01-58-13 TEMPORARY PROJECT SIGNAGE 01-60-00 PRODUCT REQUIREMENTS 01-61-16 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS 01-70-00 EXECUTION AND CLOSEOUT REQUIREMENTS 01-78-00 CLOSEOUT SUBMITTALS 01-79-00 DEMONSTRATION AND TRAINING 01-91-13 COMMISSIONING REQUIREMENTS DIVISION 02 - EXISTING CONDITIONS 02-41-00 DEMOLITION 02-82-00 ASBESTOS REMEDIATION 02-82-00.01 HAZARDOUS MATERIAL INSPECTION REPORT DIVISION 03 - CONCRETE 03-30-00 CAST-IN-PLACE CONCRETE DIVISION 04 - MASONRY 04-20-00 UNIT MASONRY 04-72-00 CAST STONE MASONRY -- 4 of 687 -- USDA Greenhouse Renovation – Phase V 100% Submittal – Issued for Construction NCSL - Fargo, North Dakota 2 June 2026 TABLE OF CONTENTS 00-01-10 - Page 2 DIVISION 07 - THERMAL AND MOISTURE PROTECTION 07-21-00 THERMAL INSULATION 07-27-00 AIR BARRIERS 07-62-00 SHEET METAL FLASHING AND TRIM 07-84-00 FIRESTOPPING 07-92-00 JOINT SEALANTS DIVISION 08 - OPENINGS 08-16-13 FIBERGLASS DOORS 08-71-00 DOOR HARDWARE 08-71-00.01 DOOR HARDWARE SCHEDULE 08-80-00 GLAZING DIVISION 09 - FINISHES 09-91-13 EXTERIOR PANTING 09-91-23 INTERIOR PAINTING DIVISION 11 - EQUIPMENT 11-53-60 GREENHOUSE EQUIPMENT DIVISION 13 - SPECIAL CONSTRUCTION 13-34-13 GREENHOUSES DIVISION 22 - PLUMBING 22-05-16 EXPANSION FITTINGS AND LOOPS FOR PLUMBING PIPING 22-05-17 SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING 22-05-23.12 BALL VALVES FOR PLUMBING PIPING 22-05-29 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 22-05-53 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT 22-07-19 PLUMBING PIPING INSULATION 22-11-16 DOMESTIC WATER PIPING 22-11-19 DOMESTIC WATER PIPING SPECIALTIES 22-13-16 SANITARY WASTE AND VENT PIPING 22-13-19 SANITARY WASTE PIPING SPECIALTIES 22-13-19.13 SANITARY DRAINS 22-15-13 GENERAL SERVICE COMPRESSED AIR PIPING DIVISION 23 – HEATING, VENTILATING, AND AIR-CONDITIONING 23-05-13 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT 23-05-17 SLEEVES AND SLEEVE SEALS FOR HVAC PIPING -- 5 of 687 -- USDA Greenhouse Renovation – Phase V 100% Submittal – Issued for Construction NCSL - Fargo, North Dakota 2 June 2026 TABLE OF CONTENTS 00-01-10 - Page 3 23-05-18 ESCUTCHEONS FOR HVAC PIPING 23-05-19 METERS AND GAUGES FOR HVAC PIPING 23-05-23.11 GLOBE VALVES FOR HVAC PIPING 23-05-23.12 BALL VALVES FOR HVAC PIPING 23-05-23.13 BUTTERFLY VALVES FOR HVAC PIPING 23-05-23.14 CHECK VALVES FOR HVAC PIPING 23-05-29 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT 23-05-48.13 VIBRATION CONTROLS FOR HVAC 23-05-53 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT 23-05-93 TESTING, ADJUSTING, AND BALACING FOR HVAC 23-07-13 DUCT INSULATION 23-07-19 HVAC PIPING INSULATION 23-08-00 COMMISSIONING OF HVAC 23-09-00 INSTRUMENTATION AND CONTROL FOR HVAC 23-21-13 HYDRONIC PIPING 23-21-16 HYDRONIC PIPING SPECIALTIES 23-31-13 METAL DUCTS 23-33-00 AIR DUCT ACCESSORIES 23-34-13 AXIAL HVAC FANS 23-34-16 CENTRIFUGAL HVAC FANS 23-76-00 EVAPORATIVE COOLING SYSTEMS 23-82-36 FINNED TUBE RADIATION HEATERS DIVISION 26 - ELECTRICAL 26-00-10 SUPPLEMENTAL REQUIREMENTS FOR ELECTRICAL 26-05-19 LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 26-05-26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS 26-05-29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 26 05 33.13 CONDUITS FOR ELECTRICAL SYSTEMS 26 05 33.16 BOXES AND COVERS FOR ELECTRICAL SYSTEMS 26-05-53 IDENTIFICATION FOR ELECTRICAL SYSTEMS 26-05-73.13 SHORT CIRCUIT STUDIES 26-05-73.16 COORDINATION STUDIES 26-05-73.19 ARC FLASH HAZARD ANALYSIS 26-08-00 COMMISSIONING OF ELECTRICAL SYSTEMS -- 6 of 687 -- USDA Greenhouse Renovation – Phase V 100% Submittal – Issued for Construction NCSL - Fargo, North Dakota 2 June 2026 TABLE OF CONTENTS 00-01-10 - Page 4 26-24-16 PANELBOARDS 26-27-26 WIRING DEVICES 26-41-13 LIGHTNING PROTECTION FOR STRUCTURES 26-51-19 LED INTERIOR LIGHTING 26-52-13 EMERGENCY AND EXIT LIGHTING DIVISION 28 – ELECTRONIC SAFETY

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 236220)