Repair Concrete Base-wide, 126 ARW, Scott AFB
DEPT OF DEFENSE
Notice type
Combined Synopsis/Solicitation
Solicitation #
W50S7S26Q0013
NAICS
236220
PSC
Z2AA
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
July 24, 2026
Response due
August 14, 2026
Place of performance
Scott Air Force Base, IL
What this opportunity is
The government is buying concrete repair services for Scott AFB in Illinois, which suits total small businesses. The NAICS code is 236220 and the set-aside is Total Small Business Set-Aside. As a Combined Synopsis/Solicitation notice, small businesses should track this opportunity closely as it may proceed directly to bid.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
PERFORMANCE WORK STATEMENT (PWS)
FOR
Repair, Concrete Basewide
VDYD 262008
SCOTT AIR FORCE BASE, ILLINOIS
29 May 2026
1. REQUIREMENT:
a. BACKGROUND: There are several locations on the grounds where concrete sidewalks
are cracked to an extent requiring removal and replacement. In the Vehicle Refueling
Building 5006, there are seven (7) trench drains that have damaged grates and cracked
and spalling concrete surrounding them. Additionally, in front of the POL Building 5036,
the concrete pad has damage from heaving resulting in a full depth crack across its width.
At the Vehicle Refueling Building 5006, the vehicle ramp immediately north of
thebuilding, has been pressed into the asphalt pavement from regular use bearing the
weight of vehicles during maintenance work,. There are four 2 IN to 3 IN deep
impressions where the 1FT X 1FT plates supporting the four stands bracing the level
section of the ramp have pressed into the pavement. Lastly, north of Building 5010 an
ADA Ramp is needed to transition between the parking lot to the adjacent sidewalk.
b. OBJECTIVES: The project objectives are as follows:
i. Correct existing cracked and failing concrete walkway paths by replacing damaged
concrete panels.
ii. Replace damaged trench drains with new approved trench drain systems connecting
to the existing drain piping.
iii. Replace concrete pad in front of Building 5036.
iv. Place new concrete foundation for the vehicle ramp immediately north of the Vehicle
Refueling Building 5006.
v. ADA Ramp added to parking lot north of Building 5010.
c. PROJECT LOCATION: All work will be within the 126th Air Refueling Wing (area).
Specific buildings where work will take place under this scope are Buildings 5006, 5008,
5010 and 5036 at Scott AFB, Illinois.
2. PROJECT ADMINISTRATION:
a. SITE VISIT: Contractor is responsible to verify all measurements and conditions pre-bid.
The Government intends to only hold one official site visit. Requests for additional site
access must go through the 126th Contracting Squadron (126 CONS) point of contact
(POC) listed in the Request for Proposal (RFP) letter. Any additional site access will be
-- 1 of 13 --
made available to all Contractors solicited for this project.
b. MEETINGS
i. Kick-Off Meeting/Project Schedule – Kick-off meeting to occur within one week of
NTP. Overall project schedule with milestone markers and 2-week look-ahead to be
completed at kick-off meeting.
ii. Contractor shall coordinate with the 126th Contracting Squadron (126 CONS) on bi-
weekly meetings once the construction phase begins. This meeting shall include the
review of an updated 2-week look ahead schedule. Contractor shall provide meeting
minutes within 24 hours of each meeting and allow the Government up to 24 hours to
accept or request changes to the minutes.
3. PROJECT SCOPE:
a. BASE BID CLIN 001: Sidewalk Repairs
i.
-- 2 of 13 --
ii. Contractor shall break and remove 350 SY total of concrete sidewalk. See
highlighted images above and table of estimated areas of sidewalk to be replaced
and repaired below.
Sidewalk
Restoration
Area
Area (SF) Area (SY)
1 93 0
4-0 85 9
4-1 85 9
4-2 275 31
4-3 317 35
4-4 75 8
4-5 175 19
4-6 108 12
4-8 76 8
4-9 231 26
12-5 441 49
13 324 36
14 74 8
iii. Sidewalk removal to include removal of existing base rock.
iv. The contractor shall prepare the subgrade to ensure a stable and compacted base
suitable for new concrete placement.
v. Contractor shall place base rock on subgrade. Ensure there are no soft spots, frozen
areas, or standing water. Contractor to place base rock so that the surface of the
rock is level providing positive drainage away from building structures. Add and
compact a minimum 4” aggregate base course (or match existing thickness if
greater).
vi. Contractor to install expansion joint material between existing concrete and newly
placed concrete.
vii. The contractor shall form, place, and finish new cast-in-place concrete sidewalk
butting up to the existing sidewalk. The completed work shall meet the following
requirements:
(a) Concrete: All new concrete shall have a minimum thickness of 4 inches and
a minimum 28-day compressive strength of 4,000 PSI. The surface shall
have a non-slip broom finish.
viii. Apply/spray concrete cure.
ix. Site Restoration
(1) Upon completion of the concrete work and after the required curing period, the
contractor shall remove all forms and construction materials. The contractor
shall restore all adjacent areas disturbed by construction activities to their
original condition. This includes, but is not limited to, grading and seeding any
damaged landscape areas.
-- 3 of 13 --
b. (CLIN 002): Replace Trench Drains and Surrounding Cracked Concrete
i. Conduct site inspection to verify site conditions. Contractor to coordinate all utility
locates and dig permits. See the marked-up plan sheet A9.1 Floor Pattern and
Equipment Plan in Exhibit A7.
ii. Contractor to perform flow test from trench drain connections to downstream
observation points including Oil and Gas or Paint separators to verify the discharge
pipes function properly prior to start of construction.
iii. Contractor shall sawcut at 1 ft offset from the perimeter of the trench drains.
iv. Contractor will remove the existing 8” thick concrete pavement around the trench
drains leaving the rebar in place
v. Contractor will remove the trench drain walls and floors as well as the anchors and
angle brackets for the existing trench drain grates.
vi. Existing drain pipes and hardware/fittings from the trench drains shall be protected
and repaired/replaced to maintain their function.
vii. Contractor shall be responsible for disposal of construction debris.
viii. Install new Neenah Foundry R-4996-A1 grated cover trench drains or approved
equal. Ensure the drains are sloped for proper drainage to existing discharge pipe
locations.
ix. Place the concrete for the removed pavement. Concrete shall be 4000 psi ILDOT
mix with a f…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 236220)
Matsushima JASDF Base Storage Shelter
DEPT OF DEFENSE · Sources Sought · due August 7, 2026
Y1DA--637-22-700 | EHRM Infrastructure Upgrades | Asheville, NC |
VETERANS AFFAIRS, DEPARTMENT OF · Solicitation · due August 7, 2026
NAF Outdoor Recreation/Equipment Rental Center, Kadena Air Base, Okinawa, Japan
DEPT OF DEFENSE · Solicitation · due July 24, 2026
NAF Outdoor Recreation/Equipment Rental Center, Kadena Air Base, Okinawa, Japan
DEPT OF DEFENSE · Solicitation · due July 24, 2026
MRR Korea
DEPT OF DEFENSE · Presolicitation · due August 3, 2026
Z2DA--589A4-25-102, Install Dedicated Pharmacy Air Handler
VETERANS AFFAIRS, DEPARTMENT OF · Presolicitation · due September 8, 2026