Inspection and Load Testing of Weight Handling Equipment, Base Elizabeth City
HOMELAND SECURITY, DEPARTMENT OF
Notice type
Solicitation
Solicitation #
70Z08126QELIZ0018
NAICS
541380
PSC
H
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
July 28, 2026
Response due
August 25, 2026
Place of performance
Elizabeth City, NC
Description
Scope of Work and Specifications
Inspection & Load Testing for
Cranes, Hoists, Vehicle Lifts, etc.
April 2026
Project COR
Name: Michael Barclift
Email: Michael.D.Barclift@uscg.mil
Facilities Engineering Department
-- 1 of 11 --
1. Scope:
The Contractor shall provide all necessary transportation, labor, equipment,
materials, weights, measures, testing materials, supervision, and perform all
operations in conjunction with load testing, inspecting, and reporting the condition
of equipment which includes bridge cranes, hoists, boat lifts, telehandler, mobile
cranes and vehicle lifts at the following locations:
• Building# 3 – Rescue Swimmer Training Facility
• Building# 6 – Aviation Technical Training Center (ATTC) Hangar & Shops
• Building# 21 – MTU Training Building
• Building# 43 – Pier @ Station # 43
• Building# 49 – Air Station (AIRSTA) Hangar/Ops
• Building# 55 – Air Station (AIRSTA) Hangar
• Building# 73 – Aviation Logistics Command (ALC) GSE Support Maintenance
• Building# 75 – Aviation Logistics Command (ALC) Hangar/Shops & Offices
• Building# 79 – Aviation Logistics Command (ALC) Hangar/Shops & Offices
• Building# 93 – Vehicle Maintenance Shop
• Building# 97 – Aviation Logistics Command (ALC) Machine Shop
• Building# 100 – Aviation Logistics Command (ALC) Engine Shop
• Building# 101 & 101A – Aviation Logistics Command (ALC) Transmission Shop
• Heavy Maintenance Facility (HMF) # 1
• Heavy Maintenance Facility (HMF) # 2
The base year shall be one (1) year from the time the written Notice to
Proceed is issued with an option to renew for a period of four (4) option years
at the discretion of the Contracting Officer.
2. Government Facilities and Utilities:
a. Electrical power is available on the site. The Contractor will be permitted to
utilize these utilities in performing the work, provided that the existing
systems are not overloaded.
b. Telephone services will not be available for use by the Contractor.
c. Building restroom facilities are available for use.
d. The Contractor, their employees, and any sub-contractors shall become
familiar with and obey all Base regulations. All personnel employed on the
project shall keep within the limits of the work area and shall not enter any
other area outside of the work site unless to do so in the performance of their
duties. Work site and execution must be arranged so as not to disrupt normal
operations in this area. There shall be No Smoking in any Coast Guard
building. All smoking must be done only in a designated smoking area.
-- 2 of 11 --
3. Materials and Locations:
a. Materials shall be delivered to the jobsite in their original unopened
packages, clearly marked with the manufacturer’s name, brand name, and
description of contents. Storage shall be in accordance with manufacturer’s
recommendations in a clean, dry, well-ventilated area. Stored materials shall
be protected from sunlight and kept away from excessive heat. Insulation
board shall not be exposed to flame or other ignition sources. The Contractor
shall not store any highly flammable materials in the work area. Sufficient
area for staging is available on site; storage areas will be pre-approved by the
Contracting Officer’s Representative (COR). Special precautions shall be
taken to ensure construction materials and debris does not enter the airfield,
runways, or taxiways.
b. Laydown areas will be approved by the COR with coordination from the Base
Environmental Compliance Office. Any damage to vegetated areas shall be
repaired and reseeded by the Contractor.
4. Labor Laws:
a. The applicable labor for this contract is: Service Contract Act.
5. Safety:
a. The Contractor is wholly responsible for work site safety. The Contractor
shall implement a safety program that protects the lives and health of
personnel in the construction area, prevents damage to property, and avoids
work interruptions. The Contractor shall provide appropriate safety
barricades, signs, signal lights, etc. as well as complying with the
requirements of all federal safety regulations as published by the
Occupational Health and Safety Administration, 29 CFR 1910 (series), 29
CFR 1926 (series), State and Local safety laws, rules, and regulations. Any
operation defined as “Hot Work” as per OSHA/NFPA requires a permit to be
issued by Base Elizabeth City Fire Department. This includes welding,
cutting, brazing, grinding or any work that could produce sparks or heat and
may initiate a fire.
6. Environmental Compliance:
a. Environmental Discharges
i. The Contractor shall ensure all discharges do not exhibit
contaminates contrary to Base Elizabeth City Non-Significant User
(Wastewater) Permit. Any flushes, backwashes and or slug loads shall
-- 3 of 11 --
be scheduled and reported to Base Environmental Compliance Office
Wastewater Permit Manager at least two weeks in advance.
Wastewater associated with any maintenance or repair shall be
quantified in a maintenance schedule. All work will be performed in
accordance with the Base Spill Prevention Control and
Countermeasures Plan, Clean Water Act and the Base Stormwater
Pollution Prevention Plan. All activation flushes of the system shall be
captured and disposed of IAW City of Elizabeth City Sewer Use
Ordinance and USCG Base Industrial User Wastewater Permit. All
storm drains within range of a potential discharge shall be
covered/sealed during installation and kept covered until the work has
been completed and the system has been deemed fully operational
and compliant with all applicable Coast Guard
policies/plans/permits/laws/ordinances. All storm drains and
waterways within range of a potential discharge shall be
covered/sealed or protected by silt fence. Nothing shall be discharged
to a storm drain at any time during the project. If an Erosion and
Sediment Control Plan is required, then these shall be preapproved by
Base Environmental Compliance Office. All spills shall be reported to
Base Environmental Compliance Office (Chris Dunn) at (252) 267-
9789 after cont…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 541380)
M1DZ--Tri-Annual Emergency Power Supply System (EPSS) Load Test, Las Vegas VA Medical Center
VETERANS AFFAIRS, DEPARTMENT OF · Special Notice · due August 3, 2026
B--IN - INDIANA ES FIELD OFFICE - BAT GENOMIC ASSESSM
INTERIOR, DEPARTMENT OF THE · Solicitation · due July 29, 2026
H299 - MICROBIOLOGICAL LABORATORY TESTING
VETERANS AFFAIRS, DEPARTMENT OF · Solicitation · due August 19, 2026
Reference Laboratory Testing Services at Naval Hospital, Guam
DEPT OF DEFENSE · Sources Sought · due August 4, 2026
UT FLAP GAR BURR(1) - Bullfrog Creek Bridge Drilling
TRANSPORTATION, DEPARTMENT OF · Combined Synopsis/Solicitation · due August 17, 2026
mRNA-sequencing and Methyl-Bisulfite sequencing from submitted leaf tissue samples
AGRICULTURE, DEPARTMENT OF · Combined Synopsis/Solicitation · due August 4, 2026