Description
Statement of Work (SOW)
INDUSTRIAL PLANT EQUIPMENT
U.S Air Force
309TH MAINTENANCE SUPPORT GROUP (MXSG)
[Version #2]
10/21/2025
Table of Contents
309TH MAINTENANCE SUPPORT GROUP (MXSG) i
1 SCOPE 1
2 EQUIPMENT INSTALLATION, RELOCATION, REPAIR, OR MODIFICATIONS 2
3 CONTRACT DATA REQUIREMENTS LIST (CDRL) 3
4 ADDITIONAL REQUIREMENTS 4
5 SECURITY: 5
6 GENERAL INFORMATION 14
Appendix A – ACRONYMS AND ABBREVIATIONS 19
Appendix B – SAFETY 20
SCOPE
This Statement of Work (SOW) is designed to define the expectations and deliverables for those individuals and companies that will assist the 309 Maintenance Support Group (309 MXSG) with equipment installation, relocation, repair, or modification. Depending upon the specific call requirements of each individual action, all or part of this document will apply.
For the purpose of this SOW, equipment refers to equipment and control/monitoring systems installed for 309 MXSG. Examples of equipment installation, relocation, repair, or modifications may include but not limited to the following:
Air Compressors
Associated Duct Work
Audio/Visual Equipment
Backflow water systems
Battery Charging Equipment
Bead Blasting Machines and Associated Systems
Bench Lighting Fixtures
Booth Painting Equipment
Chillers
CNC Boring Machine
CNC Machining Center 4-Axis
CNC Power Metal Shear or Press
CNC Robotic Polisher
CNC Turning Center
CNC Vertical Machining Center
Collectors, Dust
Cranes (Lifting Devices)
Cutting
Drill Press
Electrical Controls (AC/DC Electrical Components)
Emergency Lighting 10 ft and below
Exit Lighting
Fuel Systems
Fall Protection
Fencing
Grinders, belt driven
Grinders, cylindrical
Grinder, gap
Grinder, horizontal
Grinder, jig
Grinder, planetary
Grinder, universal
Hoist, Bridge
Hoist, Jib
Hoist, Monorail
Hush houses
Hydraulic systems
HVAC controls
HVAC units (climate control of clean rooms & equipment)
Jig Boring Machines
Lasers, Fixed and Portable
Lathes, Bench
Lathes CNC 4 Axis Turret
Lathe CNC Wheel
Lathe, Engine
Lathe, Swing
Lathe, Tool
Lathe, Turret
Milling Machine CNC
Milling Machine Horizontal
Milling Machine Tracer
Milling Machine Vertical
Modular Office Furniture
Ovens, Drying
Ovens, Heat Treat
Parts Cleaners
Pneumatic Controlled Equipment
Portable Offices
Press Brake
Refrigeration Units
Robotic Equipment and Controls
Roof Mounted HVAC
Saw, Band
Saw, Horizontal
Saw, Table
Sound Barriers
Tanks, Degreasing
Tanks, Dip
Tanks, Etching
Tanks, Plating
Test Stands (Hydraulic, Pneudraulic, and electronic)
UPS, Emergency Lighting
Washers, Parts
Water Treatment Systems
Welders
X-Ray Equipment
EQUIPMENT INSTALLATION, RELOCATION, REPAIR, OR MODIFICATIONS
For each new project, 309 MXSG will develop a detailed SOW that includes all project requirements, specifications, drawings, safety information, and other necessary details. This SOW will also be presented to the contractor at the time of bidding.
To ensure fair and consistent evaluation of all bids, the contractor shall submit a quote to the Point of Contact (POC) listed on the Request for Quote (RFQ), addressing all requirements outlined in the SOW, using the prescribed format detailed in this section; this standardized format is mandatory for all submissions, and any deviations may result in disqualification. The quote must demonstrate understanding of the required work through inclusion of preliminary drawings, schematics, parts lists, or technical data, and if subcontracting is used, the associated indirect costs/fees must be clearly identified; quotes shall include a breakdown of line items referencing hourly rates from the submitted BPA pricelists or relevant subcontracting information.
Project Information
MXSG Project/Work Order Number
Project Summary
Location of Performance
Quote Date
Quote Expiration Date
Cost Breakdown
Materials (Description, Quantity, Unit Price, Total)
Labor (Labor Category, Hours, Hourly Rate (pricelist), Total)
Subcontractor Costs (Subcontractor Name, Description of Work, Cost + Fee + Profit = Total)
Training (if required) (Description, Cost)
Rental equipment (Description, Cost)
Fees (Description, Cost)
Overhead (Calculated Percentage or Fixed Amount)
Other Direct Costs (Description, Cost)
Total Quote Price (The sum of all cost categories listed above.)
After receiving the quote from the contractor, 309 MXSG will evaluate each quote based upon cost, and how well the quote addresses the customer’s requirements.
Upon acceptance of quote by 309 MXSG, the contractor will be contacted by an authorized GPC cardholder, or individual on the authorized BPA caller list. The authorized individual will initiate all work by giving the contractor GPC purchase information and the BPA call number.
Interim Review: the contractor shall provide status reports as requested at the call level, to the project engineer/manager on the progress of each awarded project, as well as estimated completion dates. (CDRL A001)
Final Project Report: upon completion of a project the contractor shall complete the project report and submit copies of documentation to the project engineer/manager for review. The required documentation for the project report will be provided at the call level but could include the following: (CDRL A002)
As required, complete fabrication drawings shall include assembly drawings, fully dimensioned part drawings, schematics, bills of materials, etc.
As required, complete source code. This may include PLC, Wonder Ware, or Lab View Source Code in electronic format.
As required, set up instructions, operation instructions, maintenance recommendations etc.
As required, recommended spare parts list for those critical or hard to acquire parts that may improve cycle time for future repair or maintenance.
The contractor shall provide onsite/ hands-on training for operators and maintenance personnel, if necessary, upon completion…