J--Updated - ABQ CRP & EPZ HVAC Repairs
COMMERCE, DEPARTMENT OF
Notice type
Combined Synopsis/Solicitation
Solicitation #
1305M326Q0272
NAICS
238220
PSC
J041
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
July 13, 2026
Response due
July 27, 2026
Description
Statement of Work
ABQ CRP & EPZ HVAC Repairs
Albuquerque, NM
2341 Clark Carr, Loop SE
Albuquerque, NM 87106
CRP- Corpus Christi, TX
426 Pinson Drive
Corpus Christi, TX 78406
EPZ- Santa Teresa, NM
7955 Airport Rd.
Santa Teresa, NM 88008
June 12, 2026
Background:
This project is for the National Weather Service (NWS) Weather Surveillance Radar (WSR)
radar site in Albuquerque, NM (ABQ) and Weather Forecast Office(s) (WFOs) located in Corpus
Christi, TX (CRP) and Santa Teresa, NM (EPZ). Various systems at each site are in need of repair.
Scope:
Complete removal and replacement of ABQ WSR Bard air conditioners and repairs to CRP & EPZ
WFO AC units listed below. The NWS requires projects be accomplished by means that lessens
the impact to 24/ 7 operation and functions of the WFO and WSR. Coordination will need to meet
current weather forecasting and weather conditions.
-- 1 of 27 --
This will be a turn key project for removal, replacement and repairs from start to finish. It is
highly recommended that the contractor schedules a site visit for physical inspection of
existing conditions prior to submitting a quote.
Vendors who are interested in scheduling a site visit may coordinate with the PRIMARY point of
contact (POC), Jorge Negrete, and can include individual site POC’s as necessary:
POC’s:
Primary (All Sites):
Contracting Officer Representative (COR):
Jorge Negrete, Facilities Engineering Technician, 830-401-2055
jorge.negrete@noaa.gov
ABQ Secondary:
Pat Chando, Electronic Systems Analyst, 505-228-4638
pat.chando@noaa.gov
CRP Secondary:
Rich Martinez, Electronic Systems Analyst, 210-557-7479
richard.martinez@noaa.gov
EPZ Secondary:
David Beattie, Electronic Systems Analyst, 575-589-4088
david.beattie@noaa.gov
Tasks:
All Sites:
1. Provide all labor, tools, rigging, equipment, materials, testing, transportation, supervision,
management and state and local permits necessary for completion of this project.
2. Provide qualified technicians with current HVAC licenses.
3. Sign in with local NWS staff when arriving on site each day.
4. Ensure safe work practices and compliance with all safety regulations. (i.e. Personal
Protective Equipment PPE, Lock Out Tag Out LOTO etc.)
5. Test and ensure proper function of repaired or replaced equipment.
6. Restore the facility to its previous condition and remove all debris offsite.
-- 2 of 27 --
CLIN 0001 ABQ WSR Site:
1. Replace existing 2ea 6 ton wall-mounted Packaged Air Conditioner (PAC) units- Bard
Model#- W70A2-B09XX4XXX. Replace with brand name Bard or equal, based on
specifications, matching supply and return vent penetrations, existing bolt patterns, and
use of R454B refrigerant. Completely seal both supply and return vents and exterior
perimeter. (Note: interior supply duct may need to be removed to provide access.)
ABQ- Radar Shelter Bard Units 1 & 2
-- 3 of 27 --
ABQ- Inside Radar Shelter- Bard 1 & 2 supply and Return
SUBMITTALS- ABQ:
Submittal ID Description Type Due Date Approver
SUB-ABQ-0001
Packaged Air
Conditioner (PAC) Product Data & Specs
Within 5 Days
Post Award COR
-- 4 of 27 --
CLIN 0002 CRP WFO Site:
1. Replace Fan Motor Assembly and Pressure Transducer on existing Computer Room Air
Conditioner (CRAC) unit #2 condenser unit- Trane-TR-SCS-MC-056-SEC-O1. All parts
replaced shall be specific to the manufacturers specs and be functionally compatible with
the current existing system (form-fit-function replacements).
CRP- CRAC Condenser Unit-1
-- 5 of 27 --
2. Replace shorted AC-2 condenser compressor on existing unit- Trane-
TTA18044DAA01AS05. Perform system evacuation flushing to remove contaminated oil
and replace the filter drier. All parts replaced shall be specific to the manufacturers specs
and be functionally compatible with the current existing system (form-fit-function
replacements).
CRP- AC Condenser Unit- 2
-- 6 of 27 --
3. Clean all ducts and vents for AC-1, 2 & 3 units in the WFO. Work shall be performed in
accordance with National Air Duct Cleaners Association (NADCA) standards.
a. Clean HVAC system components from the point where air enters the system to each
point where air is discharged from the system.
b. Clean HVAC system components as indicated on Drawings.
c. Clean existing supply, return and exhaust air ducts in the building.
d. Clean supply and return air ducts serviced by Air handling Units (AHU)- AHU1, AHU2
and AHU3.
e. Clean registers, grilles, vents and diffusers.
f. Clean reheat coils and supply air ducts downstream of reheat coils.
g. Clean air handlers and associated existing return air ducts.
h. Clean building exhaust systems that service men’s and women’s restrooms.
i. Clean transfer fan unit between equipment and electrical rooms.
j. Clean air handler fan coil units, cabinets, coils, and blowers located within fan coil units.
CRP- Air Diffuser 1 (Typical)
-- 7 of 27 --
CRP- Air Diffuser 2 (Typical)
-- 8 of 27 --
CRP- Supply Air Duct at Air Handlers 1 & 2
-- 9 of 27 --
CRP- Supply Air Duct at Air Handlers 3)
-- 10 of 27 --
CRP- Return Air Duct at Air Handler 3
-- 11 of 27 --
SUBMITTALS- CRP:
Submittal ID Description Type Due Date Approver
SUB-CRP-0001
Condenser Fan
Unit Assembly
(Trane CRAC)
Product Data &
Specs
Within 5 Days
Post Award COR
SUB-CRP-0002
Pressure
Transducer
(Trane CRAC) Product Data
Within 5 Days
Post Award COR
SUB-CRP-0003
Compressor
(Trane AC-2) Product Data
Within 5 Days
Post Award COR
SUB-CRP-0004
Filter Drier
(Trane AC-2) Product Data
Within 5 Days
Post Award COR
CLIN 0003 EPZ WFO Site:
1. Replace Computer Room Air Conditioner (CRAC) unit #2 condenser Fan Motor
Assembly in existing unit- Liebert- MCM080E8ADM930. Parts replaced shall be
specific to the manufacturers specs and be functionally compatible with the current
existing system (form-fit-function replacements).
-- 12 of 27 --
EPZ- CRAC Condenser 2
2. Replace AC-3 condenser fan motor, head pressure controller, contactor, fan blade and fan
grille on existing unit- Trane- 38AUZA14A0A6. Parts replaced shall be sp…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 238220)
Air Conditioning Maintenance
JUSTICE, DEPARTMENT OF · Justification
Air Conditioning Repair
JUSTICE, DEPARTMENT OF · Justification
Replace EVAP Cooler in Greenhouses - St. Paul, MN
AGRICULTURE, DEPARTMENT OF · Combined Synopsis/Solicitation · due August 13, 2026
Boiler Maintenance & Repair
DEPT OF DEFENSE · Solicitation · due September 3, 2026
J--FY26 HIHW VC and LC HVAC Repair and Replacement
COMMERCE, DEPARTMENT OF · Combined Synopsis/Solicitation · due July 28, 2026
89 AW HQ Water Bottle Stations
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due August 4, 2026