What this opportunity is
The Department of Veterans Affairs is seeking a contractor for HVAC and plumbing upgrade or repair services at the Omaha VAMC, with a performance period from August 15, 2026, to April 15, 2027. This opportunity is set aside for Service-Disabled Veteran-Owned Small Businesses, making it suitable for qualified small firms in this category. Interested bidders should note that this is a combined synopsis/solicitation, indicating the need to track the opportunity closely rather than submit a formal bid immediately. A site visit is scheduled for July 21, 2026, to discuss project details.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
HVAC & Plumbing Upgrade or Repair Service Contract
SITE VISIT
Tuesday July 21, 2026 at 10:00AM-12:00 PM CST
Location: Omaha VAMC, 4101 Woolworth Ave, Omaha, NE 68105. Engineering Office B618.
POC: Kyle Rotert
LOCATION OF SERVICES
Omaha VAMC, 4101 Woolworth Ave, Omaha, NE 68105
Facility Size: 813,984 sq. ft
Main Building (Building 1, Building 17)
Ambulatory Care Center (ACC)
PERFORMANCE WORK PERIOD OF PERFORMANCE
8/15/2026 - 4/15/2027
The contractor shall be prepared to complete the cooling system equipment installation first, followed by
the heating system equipment. This timeline and any questions regarding prioritization should be
discussed and clarified during the kickoff meeting.
CONTRACTING OFFICER REPRESENTATIVE / TECHNICAL REPRESENTATIVE
For the purposes of this contract, contracting officer representative (COR) and VA technical point of
contact (TPOC) may be used interchangeably to delineate an individual employee by the government at
the facilities where work will take place. CORs are located in the Engineering Department office, Room
B618.
Primary COR: Kyle Rotert, Kyle.Rotert@va.gov, 531-205-5343
Secondary/Alternate COR: Paul Karnish, Paul.Karnish@va.gov, 402-201-3756
Tertiary/Alternate COR: Griffin Walsh, Griffin.Walsh@va.gov, 531-232-9231
WORK HOURS & OWNER COORDINATION
The contractor shall limit all impacts to patients or staff by phasing work during or outside of normal
business hours accordingly. Normal business hours are 0700-1600. Should services provided not impact
patient or staff services, work can be done during normal business hours. Questions on local facility
impacts and work proposed by the contractor shall be directed to the contracting officer representative
(COR) for approval of work to be performed during or after hours.
If systems lack redundancy and impact climate parameters, work should be performed after hours. Due
to the continuous operations of the hospital and sensitive populations served, all equipment or utility
outages shall be communicated to the contracting officer, primary and alternate COR for VA approval 28
-- 1 of 31 --
calendar days prior to work proceeding. The contractor shall build time for the VA to receive adequate
approvals for such outages into their schedule and be prepared to work outside of normal business
hours to accomplish any outages to limit impact to the patients, staff and visitors of the NWIHCS.
Time is of the essence for all work improving cooling capabilities within this contract. The Contractor
shall coordinate and phase work to improve systems during “off” season where applicable.
KICKOFF MEETING
The general contractor shall schedule a kickoff meeting no later than 14 calendar days following award.
The contractor shall provide an agenda in preparation of the meeting, take meeting minutes, and shall
email these notes to all parties included in the meeting invite. At a minimum, the contractor shall
provide the general contractor contact information that can be reached 24/7 as well as subcontractors,
and any required onsite coordination for inspection, testing or deliveries during the duration of the
period of performance, any hazards expected, preconstruction risk assessments where applicable and
infection control risk assessments where applicable. At the discretion of the contracting officer (CO), the
action of establishing a time and place of the conference, agenda and summary may be delegated or
taken on by the contracting officer.
During the kickoff meeting the contractor shall provide a schedule and schedule of values to meet each
aspect covered within the contract scope. Changes to these documents shall be communicated to the
Contracting Officer, primary and alternate Contracting Officer Representatives (CORs) immediately.
A. Schedule shall be prepared to provide the below information meeting or exceeding the
contracted period of performance,
Contract start date: [Insert Date]
Estimated completion date: [Insert Date]
Key milestones:
Site survey and preparation: [Insert Date]
Procurement of materials: [Insert Date]
Removal of existing equipment/materials: [Insert Date]
Installation of new equipment/materials: [Insert Date]
Testing and commissioning: [Insert Date]
CERTIFICATIONS
It is the expectation that all contractors meet the below qualifications. If contracted employees change
from the proposal provided in the solicitation the general contractor shall provide credentials for VA
review and approval prior to work. During the proposal stage of the solicitation, each bidder shall
-- 2 of 31 --
provide copies (scanned or photographed) of the qualifications for the contractors performing the work,
as well as evidence of meeting the identified minimum qualifications.
General contractor shall provide one OSHA “Competent Person” (CP) to be physically present at all job
sites. This individual shall be directly employed by the general contractor with authority to speak on
behalf of the general contractor. This individual shall be capable of identifying existing and predictable
hazards in the surroundings and working conditions which are unsanitary, hazardous, or dangerous to
employees, and who has the authorization to take prompt corrective measures to eliminate them (see
29 CFR 1926.32(f)). The prime contractor(s) are responsible for informing their subcontractors of the
safety provisions under the terms of the contract and the penalties for noncompliance, coordinating the
work to prevent one craft from interfering with or creating hazardous working conditions for other crafts,
and inspecting subcontractor operations to ensure that mishap prevention responsibilities are being
carried out. This individual shall have a current OSHA 30 certification and provide no less than 3 years’
worth of job-related experience similar to that being asked in this contract.
The general contractor shall also provide NATE (North American Technician Excellence) certification staff
with current EPA 608 credentials and at least 2 years of e…