Description
1
Performance Work Statement (PWS)
Leasing, Installation, Operation, and Maintenance of Heating, Ventilation and Air conditioning
(HVAC) Equipment to Support Military Working Dog (MWD) Kennels
Joint Base San Antonio-Lackland (JBSA-Lackland)
JBSA Lackland Buildings: 7634, 7638, 7640, 7642, 7599, 7600
1239 Knight St. 78236
10 JULY 2026
12 Month + 12 Month Option
1. DESCRIPTION OF SERVICES. The Contractor shall provide all equipment and tools
necessary to meet the mission requirement of installing, operating, and maintaining
temporary cooling and heating equipment for Military Working Dog (MWD) kennels, as a
means of climate control, to promote a consistently comfortable environment with kennel
temperatures ranging between 45 – 85°F.
1.1.1. Scope of Work. The contractor shall conduct surveys of the work scope, both before it
begins and after it is finished. These surveys will verify that the work adheres to all
HVAC industry standards, state and federal codes, and the environmental requirements
detailed in this contract. The Contractor shall furnish all equipment, labor, layouts of
work features, and supervision needed to lease, install, operate and maintain HVAC
equipment in the various locations as shown in Attachment A – Conceptual Framework.
The Contractor shall provide maintenance and servicing of generators, fuel, auxiliary
tanks, HVAC units, drywell for HVAC equipment condensate, and appurtenances such
as electrical conductors, plumbing, and temporary metal ductwork with liner.
The Contractor is responsible for enclosure of the kennel roof gable to aid in maintaining
temperatures. This contract also includes providing fuel and maintaining refueling
service for the generators as needed to maintain continuous operation of the HVAC units.
The Contractor shall provide maintenance services on equipment, including emergency
maintenance response times of no less than a 2-hour response time, 24 hours a day, 7
days a week. The Contractor will maintain and ensure all HVAC units and all Generators
are to 95% serviceability.
The Contractor is responsible for conducting a site visit prior to any work being
performed to assess exact site conditions. The Contractor is responsible for devising a
plan to install and maintain all lease equipment for the duration of the project, to include
maintaining fuel levels during the lease agreement. The Contractor shall haul, remove
equipment and restore site to original condition at the end of the rental lease agreement.
The Contractor shall provide a Work Plan Narrative detailing the Contractors approach,
prior to installation, for Government review. Work Plan Narrative shall be used during
the Technical Evaluation process. The Contractor shall procure and install all required
“turnkey” operational hardware, appurtenances, rodent resistant indoor/outdoor flexible
ductwork including electrical infrastructure to supply power to the HVAC equipment.
-- 1 of 12 --
2
The Contractor shall remove and dispose of and haul off all debris from the jobsite daily
and maintain the area around equipment to promote a safe environment. The Contractor
shall submit a work schedule as part of the Work Plan Narrative and will be used as part
of the Technical Evaluation. Contractor shall provide all necessary dumpsters required
to haul all refuse and for cleanup effort.
1.1.2. Building Description. The 6 kennels housing the military dogs are metal, carport-type
structures with a fixed roof and metal fencing around the structure, atop a concrete
foundation, approximately 40 ft x 150 ft each. The Kennels are used to house MWDs.
The area is occupied and MWD training may be occurring in the vicinity. Some areas
may require escorts to enter. Contractor shall maintain egress in and out of main
entrance to kennels, and access to kennels shall not be blocked. The contractor shall
coordinate with the COR for entry. There is no power available in the area and HVAC
equipment must run on generator power. Kennel structures are approximately 50 feet
from one another.
1.1.3. Environmental Requirements. Diesel powered generators must have and/or be fueled
from a double-walled aboveground storage tank. If fuel tank is not double walled, it
should be placed into Secondary Containment to protect it from fuel leaks and spills.
Contractor shall utilize a drip pan and/or containment during the refueling of the
generator fuel tanks, to ensure no spillage of fuel to the soils, grass or storm drains.
Contractor shall place fuel as far away as feasible from any storm water drains, storm
water inlets or inside stormwater swales. Contractors shall have a spill kit nearby with
absorbent pads, pillows, etc. Contractor shall post "No Smoking" signs and have a
portable fire extinguisher nearby. Contractors shall ensure fuel tanks have 5 feet of clear
space on all sides, away from buildings and above it to ensure adequate ventilation.
Contractors shall use grounding rods to ground equipment.
1.2. Lease Description. Provide a quantity of 12 - commercial-grade, no less than 10-ton
HVAC units with duct sock accessories on trailers (2 units per kennel). Provide the
manpower to place, install, maintain, and remove the equipment. Provide Work Plan
Narrative. Provide 24 hour/7 days per week service capability to equipment. Provide 6
generators with a maximum of 70 decibels range to supply sufficient power to the 12
HVAC equipment with accessories and wiring harnesses. Provide fuel and refueling for
generators. Provide temporary fencing and signage equipment for the duration of the
contract. Install all required wiring, switches, and circuit breakers to support the proper
function of the equipment. Contractors shall ensure all electrical wiring harnesses are
safely covered and do not present a tripping hazard.
1.2.1. Pre-Construction Site Assessment and Documentation. No later than (NLT) five (5)
calendar days after contract award, the Contractor shall visit the site and examine all
attachments and the Performance …
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 238220)
Air Conditioning Repair
JUSTICE, DEPARTMENT OF · Justification
Air Conditioning Maintenance
JUSTICE, DEPARTMENT OF · Justification
HVAC Cleaning and Insulation, JBPHH-HI, Hawaii Air National Guard
DEPT OF DEFENSE · Solicitation · due July 30, 2026
Water Treatment Service HVAC System
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due July 30, 2026
89 AW HQ Water Bottle Stations
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due August 4, 2026
Fire suppression system installation
AGRICULTURE, DEPARTMENT OF · Combined Synopsis/Solicitation · due August 7, 2026