LOLO NATIONAL FOREST Roof & Foundation Repair at Savenac Historic Site

AGRICULTURE, DEPARTMENT OF

Notice type
Combined Synopsis/Solicitation
Solicitation #
1240LU26Q0100
NAICS
238160
PSC
Z1AZ
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
July 7, 2026
Response due
July 21, 2026
Place of performance
Haugan, MT

What this opportunity is

The Department of Agriculture is buying roof and foundation repairs at the Savenac Historic Site in Montana. This total small business set-aside suits small businesses classified under NAICS 238160. As a combined synopsis/solicitation, small businesses should be prepared to bid on this opportunity rather than just tracking it for potential future awards.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

1 US Department of Agriculture (USDA) Statement of Work Historic Savenac Repairs -- 1 of 4 -- 2 Contents Project .................................................................................................................................................................... 3 General Information ................................................................................................................................................. 3 1.0 Scope of Work ................................................................................................................................................ 3 Contractor Requirements .......................................................................................................................................... 3 3.0 Technical Requirements / Tasks ....................................................................................................................... 3 4.0 Government Furnished .................................................................................................................................... 3 5.0 Deliverables / Schedule ................................................................................................................................... 3 6.0 Cleanup and Disposal ...................................................................................................................................... 4 9.0 Security Requirements .................................................................................................................................... 4 Attachments ........................................................................................................................................................ 4 -- 2 of 4 -- 3 Project Historic Savenac Repairs The Historic Savenac on the Lolo National Forest, Superior Ranger District near Haugan, MT 59867. General Information 1.0 Scope of Work The intent of this project is to repair damage to the roof of the administrative building caused recent wind storm and repair the rotting foundation of the East Cottage caused by moisture and poor drainage. Contractor Requirements 2.0 Technical Requirements / Tasks The work on the administrative building shall include repairing the damaged area shown on the plans. Work shall include but is not limited to removing all damaged material, repairing damaged rafters, repairing and replacing damaged sheathing, installing new underlayment material, and installing Government Furnishing metal shingles. All work shall match the historic character of the building. The work on the east cottage shall include but is not limited to removing and replacing rotten sill log, removing and repairing concrete patio as necessary to complete sill log replacement, and repairing and replacing siding. Contractor is responsible for the means and methods for achieving this work. Contractor is responsible for replacing incidental material tear-off to match existing historic quality. The precise details of performing the work are not stipulated, except as considered essential for the successful completion of the work. Furnish all labor, material, equipment, tools, transportation, and supplies necessary to complete the work according to the contract. All work shall be completed in accordance with the content of this scope of work, specifications, and attached drawings. The Contractor shall be responsible for verifying all measurements to determine necessary quantities and sizes of materials to be furnished. 3.0 Government Furnished Roof Shingles, aggregate source and east cottage siding 4.0 Deliverables / Schedule All written deliverables shall be phrased in layperson language. Statistical and other technical terminology shall not be used without providing a glossary of terms. It is the Contractor’s responsibility to submit all items prior to beginning work. The Contractor shall allow 10-days for processing of submittals by the Government. Approvals must be obtained before starting work. Submittals are required for the following: • Roof sheathing • Roof paper • Sill Log lumber • Concrete mix • Wall vapor barrier • Construction Sequence • Construction Schedule -- 3 of 4 -- 4 Price Range – Between $25,000 and $100,000 Pre-bid Tour – Pre bid tour will be scheduled during the biding period and will be scheduled by the CO. Start Work - It is estimated that work will begin in July 2026. Period of Performance – Contract to be completed in 90 calendar days from the notice to proceed and no later the October 1 st , 2026. Contractor may, upon approval of CO, opt to work over weekends. If contractor would like to exercise this option, provide work schedule, and discuss with CO. Disturbances – Contractor shall not block or inhibit access to this building or egress through hallways. Staging Area – The Contractor shall coordinate with the CO on a staging area location. The Contractor shall operate all equipment and store, transport, and handle materials in a manner that will not damage the existing roads, parking lots, and landscaping. Potable Water – The contractor may use the water on-site from location approved by the CO. Wastewater Facilities –Wastewater facilities will be provided on site and designated by the CO. Electrical – The Contractor may use on-site electrical service. 5.0 Cleanup and Disposal The Contractor shall be responsible for solid waste disposal. The Contractor shall always keep the area in a clean, neat, and orderly condition. Construction related debris, including but not limited to used motor oil, oil cans, grease cartridges and refuse shall be removed promptly from the site and disposed of in a lawful manner off National Forest System lands. Fees for the use of landfills or transfer stations shall be paid for by the Contractor if there is a charge. 6.0 Security Requirements Security is the responsibility of the Contractor. The Contractor shall be responsible for protecting all equipment and supplies for

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 238160)