Maintenance, Repair, and Preservation of YRBM-50

DEPT OF DEFENSE

Notice type
Sources Sought
Solicitation #
N4523A26R1002
NAICS
336611
PSC
J019
Posted
June 30, 2026
Response due
July 10, 2026
Place of performance
WA

What this opportunity is

The Department of Defense is seeking maintenance, repair, and preservation services for the YRBM-50 vessel, as indicated by the Sources Sought notice. This opportunity is suitable for small businesses under NAICS 336611, which pertains to shipbuilding and repairing. Interested vendors should note that this is a Sources Sought notice, meaning it is primarily for market research rather than an immediate solicitation, so tracking the opportunity is essential for future bidding.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

1 YRBM-50 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - COVER SHEET – STATEMENT OF WORK (SOW) - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - N4523A26R1002 SOLICITATION COPY Date Prepared: Version: Rev 1 June 23, 2026 DRAFT -- 1 of 80 -- 2 Table of Contents Paragraph / Section Page Number 1.0 GENERAL REQUIREMENTS 1.1 Vessel Characteristics 4 1.2 Scope Overview 4/5 1.3 Definitions 5/7 1.4 Arrival Conference 7 1.5 Required Documents 7/8 1.6 Progress Meetings 8/9 1.7 Availability Requirements 9/12 1.8 Care of Vessel 12 1.9 Workmanship 13 1.10 Corrective Action Request (CAR) 15 1.11 Condition Found/Inspection Discrepancy Report (CFR/IDR) 15/17 1.12 Interferences 18 1.13 Safety Requirements 18/19 1.14 Hot Work/Welding 19/20 1.15 Threaded Fasteners 20/21 1.16 Preservation 21/23 1.17 Environmental and Hazardous Waste Management 23/24 1.18 Materials 24 1.19 Weight Control 25 1.20 Label Plates 25 1.21 Integrated Logistic Support 25 1.22 Gas Free 26 1.23 General Requirements for Testing 26/30 1.24 Process Control Procedure (PCP) Requirements 30/32 1.25 Compartment Arrival / Closeout inspections 32 1.26 Technical Representative 33/34 1.27 Heavy Weather Plan 34/37 1.28 Foreign Material Exclusion 38 DRAFT -- 2 of 80 -- 3 2.0 REFERENCES 2.1 Order of Precedence 39 2.2 Discrepancies 39 Consolidated List of References 40/43 3.0 WORK REQUIREMENTS 3.1 Docking and Undocking the Vessel 44/48 3.2 Hull Repairs 48/55 3.3 Structural Repairs 55/56 3.4 Tanks/Voids 56/61 3.5 Exterior Deck Repairs 61/66 3.6 Superstructure 66/69 3.7 Main Propulsion Repairs 69 3.8 Steering System Repairs 69 3.9 Machinery Systems 69 3.10 Electrical Systems 69 3.11 Piping Systems 69/70 3.12 Weight Handling Systems 70 3.13 Shipalt YRBM-1134D Hot Water Heater Installation 70 3.14 ShipAlt YRBM-1102D Awning Replacement 71 3.15 ShipAlt YRBM-1120D CCTV Upgrade 71/72 3.16 ShipAlt YRBM-1191D A/C Plant Replacement and Backup Systems 72/73 3.17 ShipAlt YRBM-1098D Switchboard Upgrade 74 3.18 ShipAlt YRBM-1061D 1MC Replacement and Phone System Upgrades 74/76 3.19 Dock And Sea Trials 76/7 4.0 GOVERNMENT FURNISHED MATERIAL (GFM) 77 5.0 DATA SUBMISSION LIST: 77/80 w DRAFT -- 3 of 80 -- 4 Statement of Work (SOW) 1.0 GENERAL REQUIREMENTS: This document invokes the requirements applicable to the docking and maintenance work to be performed on YRBM-50. Work performed and accomplished shall be in accordance with the highest quality workmanship standards and practices commonly accepted in the commercial marine industry and the technical references listed herein. The Contractor is responsible for understanding and complying with all requirements specified herein. The requirements listed herein work in conjunction with the technical drawings and other references to describe the essential features, functions, and requirements of the work performed. 1.1 Vessel Characteristics: YRBM-50 Built by: Naval Shipyard Mare Island Length: 153 FT Draft: 6 FT Width: 43FT – IN Full Displacement: 900 L Tons Age: 82 YRS Light Load 427 L Tons Hull Type: Steel 1.2 Scope Overview: Coordinate with the Contracting Officer, via the SUPERVISOR to deliver the vessel to the Contractor’s facility. Upon docking vessel, wash, and clean vessel. Accomplish required inspections and fender repairs. Remove existing and install new zinc anodes. Hull, freeboard and exterior decks require ultrasonic measurement of plating thickness and repair of areas below minimum thickness as needed. Accomplish blast and paint preservation of hull, freeboard, exterior decks and superstructure. Vessel requires inspection for damage and deterioration (hull, exterior decks, and tanks/voids– plating and framing). Apply new non-skid system to exterior decks. Open, clean, ventilate, inspect, test, and maintain dry each tank/void. Accomplish partial preservation of QTY (24 EA) ballast tanks/voids. Accomplish access cover and watertight hatch and door repairs. Disinfect and certify potable water system. Pump and clean the interior surfaces of the CHT tank. Accomplish main deck repairs, hawse hole bull’s eye and bolster repairs, and hull fendering system modifications. Accomplish the following modifications: hot water heater installation, awning replacement, A/C plant replacement and backup systems, switchboard upgrades, 1MC replacement and phone system upgrades, and CCTV upgrades. Undock the vessel. Verify vessel drawings and provide redline drawings to reflect actual conditions of the vessel. Conduct dock trials. Coordinate with the SUPERVISOR to support and accomplish all contract DRAFT -- 4 of 80 -- 5 requirements prior to the availability end date. Arrange and coordinate the delivery of the vessel back to the Government with the Contracting Officer via the SUPERVISOR. Specific details of all work items and tasks required by this Statement of Work described in this Scope Overview are included in Section 3.0 of this Statement of Work. 1.3 Definitions: As used throughout this Specification, the following definitions and terms have meanings as indicated: 1.3.1 Unless otherwise stated, “as shown”, “as indicated”, “as detailed”, or other words of similar import refer to the contractual documents including reference documents and publications. 1.3.2 The words “as directed”, “as approved”, “when authorized” or words of similar import refer to the direction, requirements, permission, approval, or acceptance by the Contracting Officer. 1.3.3 The term “Objective Quality Evidence” (OQE) shall mean current, accurate, and complete objective documentation and information submitted together as a complete data package sufficient that a qualified and disinterested third party could analyze and evaluate whether technical requirements were achieved. 1.3.4 Where “in accordance with regulatory body requirements” is stated, the industrial efforts shall be in accordance with the appropriat

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 336611)