STATEMENT OF WORK FOR
Design-Build Merletti /Multi-
Function Expansion
Project Background and Requirements
A. Project Background
1) The James J. Rowley Training Center (JJRTC) is the primary training facility for
the United States Secret Service (USSS). The campus is located at 9200 Powder
Mill Road in Laurel, Maryland, approximately 490 acres. The United States
Secret Service, James J. Rowley Training Center (JJRTC) is the main training
facility for USSS personnel. The facility consists of multiple buildings including
classrooms, offices, and tactical training venues spread over the campus. JJRTC
must provide the best training environment to USSS law enforcement Agents,
Officers and civilian support personnel.
2) The purpose of this project is to provide turn-key design build services to
construct a Multifunction Auditorium annex. The annex shall be fitted out with
advanced state of the art technology and systems, to the north side of the Merletti
Facility located at the James J. Rowley Training Center in Laurel Maryland.
Reference and utilize the Government provided 100% final construction
documents created under General Services Administration (GSA) contract
number GS-11P-02YTD-0283 and A/E task number P-11-05-ZG-0041 by
ADTEK Engineering Incorporated dated August 28, 2009, to create revised and
updated 100% Sealed construction documents using the Imperial system as the
unit of measure. The documents shall be in accordance with all applicable local,
state and federal codes, regulations, guidelines, procedures, industry standards &
best practices, specifications and ABA/ADA compliance. The venue shall
accommodate seating for approximately 250 individuals along with an adaptable
stage with the ability to accommodate an executive conference table, chairs and
technology for approximately eighteen (18) people. In addition to the
United States Secret Service
James J. Rowley Training Center
-- 1 of 54 --
2 | P a g e
construction documents provided, the venue shall include an advanced lighting
technology system with above ceiling Catwalk for direct access to lighting and
other maintenance necessities. The primary seating area shall be designed with a
riser floor system approach. As a minimum, the facility shall include a
mechanical room, two (2) equipment storage rooms, integrated control systems,
electrical room, audio visual (A/V) controls room, central equipment room
(CER), four (4) hands free filtered bottle filling stations with versatile bi-level
drinking fountain, green room, office, retail store with storage, men’s & women’s
restroom, with the women’s restroom having at least six (6) each water closets
and lavatories. Moreover, a state-of-the-art large scale Planar Directlight Ultra
Series video wall system with 0.7mm or less pixel pitches shall be included; it
shall be installed and visible from the front and on angle-aligned walls so that all
venue participants can clearly view the display. An 8K audio system with
superior acoustics & equipment shall be integrated as part of the A/V system,
high-definition 98” Planar systems UltraRes Series Commercial monitors, or
COR approved equivalent, shall be installed throughout the venue, and any other
components/services necessary to meet the intended use of the facility. The
contractor shall maintain full access to the Merletti building and adjacent
facilities throughout all construction activities
B. Period of Performance - The period of performance for this task order is 365
calendar days from date of ‘Notice to Proceed’ (NTP).
C. Project Requirements
1) Key Contact Entities
a. This contract shall be administered by USSS Procurement with
construction management by USSS RTC Facility Branch. For this
statement of work, “Government” refers to the KO, the CS, or the COR:
and “Contractor” refers to the Design/Build Contractor.
2) The contractor shall provide all personnel, equipment, supplies, facilities,
transportation, tools, materials, supervision, testing, programming and any
other resource (s) necessary to meet project requirements and intent. Other
requirements shall include but not limited to:
a. All aspects of the contract and project requirements including options shall be Turn-key efforts.
b. The new annex and mezzanine shall have at least 12,000 usable square feet.
c. All exterior facade features and colors of the new annex shall match the exterior facade features and
colors of the existing Merletti Facility.
d. The contractor is responsible for mitigable runoff, drainage and site preparation and work in and
around the project site and as required by the Maryland Department of Environment.
e. Demolish and/or relocate existing sidewalks, utilities, and other infrastructure as needed for site
location.
f. The seating area shall be continental seating arrangement and designed with a riser floor system
approach. The seating system shall be flexible so that the area can be easily reconfigured for various
event and with aisle lighting. The seating sight lines shall be designed and constructed to ensure every
seat offers an unobstructed view of the entire stage, screens, and monitors. The seating chairs shall
have ample clear passage to allow a participant to pass without having to stand up. The ergonomic
fully enveloped chairs shall be constructed with a heavy-duty frame and proper fire-retardant foam
-- 2 of 54 --
3 | P a g e
density based on a 5-hour duration event. Further, the chairs shall deliver high comfort and made with
premium commercial grade upholstery with bottom & back contoured cushions. Each seat shall have
a foldable scribe writing tablet arm, large cup holder, USB A & C ports, and power source to charge
laptops. The writing tablet shall require only one movement to store, mechanically dampened to
control the folding motion, writing surface constructed from at least ½" thermoset resin & 124 square
inches of writing area (not including the forearm), and be an armrest when the tablet is folded.
…
Source: SAM.gov, as posted. Verify the current solicitation before responding.