MRL Carrollton Phase III Storage Canopy
DEPT OF DEFENSE
Notice type
Solicitation
Solicitation #
W912P826BA082
NAICS
237990
PSC
Y1GD
Set-aside
Small Business Set Aside - Total
Posted
August 24, 2026
Response due
September 23, 2026
Place of performance
New Orleans, LA
Description
ED 25-017
W912P826BA082
US Army Corps
of Engineers
New Orleans District
Mississippi River And Tributaries Project (MR&T),
Orleans Levee District
Carrollton Phase III -
District Floodwall
Storage Shelter
Orleans Parish, Louisiana
Construction Solicitation
and Specifications
August 2026
-- 1 of 441 --
DEPARTMENT OF THE ARMY
U.S. ARMY CORPS OF ENGINEERS, NEW ORLEANS DISTRICT
7400 LEAKE AVENUE
NEW ORLEANS, LA 70118-3651
SOLICITATION: W912P826BA082 (Previous Solicitation No. W912P8BA080) 24 August 2026
FOR: East Bank, Mississippi River Floodwall, Mississippi River & Tributaries Project (MR&T), Orleans Levee
District, Carrollton Phase III – District Floodwall Storage Shelter, Orleans Parish, Louisiana (ED 25-017)
TO OPEN: 23 September 2026 at 11:00 a.m. Local Time
Prospective Contractors must register in the System for Award Management (SAM). See FAR Clause 52.204-7 for
required information. The website for SAM is https://www.sam.gov. As of April 4, 2022, the Federal Government
has stopped using the DUNS Number as a unique identifier for entities and switched to a Unique Entity ID generated
by SAM.gov. In addition, entities with DUNS Numbers but no SAM.gov registration have been able to get Unique
Entity IDs without registering in SAM.gov since October 2021.
NOTE: The DUNS Number is no longer used in SAM.gov, eSRS, FSRS, FPDS, CPARS, or FAPIIS.
BIDDERS MUST PROVIDE FULL, ACCURATE AND COMPLETE INFORMATION AS REQUIRED BY THIS
SOLICITATION AND ITS ATTACHMENTS. THE PENALTY FOR MAKING FALSE STATEMENTS IN BIDS
IS PRESCRIBED IN 18 U.S.C. 1001. (FAR 52.214-4 APR 1984)
DESCRIPTION AND MAGNITUDE OF WORK: The work consists of demolition, clearing and grubbing,
structural excavation and backfill, utility relocations, construction of a reinforced concrete slab and concrete
pavement, installation of a pre-engineered metal building, chain link fence and gate, and other related incidental
work.
The estimated magnitude of construction is between $1,000,000 and $5,000,000.
CAUTION TO BIDDERS: In delivery of hand-carried bids, bidders are cautioned to allow sufficient time for delays
which may be encountered as a result of frequent trains which are subject to block all access roads to place of bid
opening for various lengths of time and for visitor background checks by MVN security when entering the
installation at place of bid opening. Such delays DO NOT permit acceptance or consideration of late bids.
NOTE: ALL WORK UNDER THESE SPECIFICATIONS SHALL BE PERFORMED IN ACCORDANCE WITH
THE PROVISIONS OF EM 385-1-1 "CORPS OF ENGINEERS SAFETY AND HEALTH REQUIREMENTS
MANUAL", DATED 15 MARCH 2024.
ATTENTION: Contractors must complete, and submit with their bid, the provisions located in Section 00 45 00. A
bidder may also submit, in lieu of the completed Section 00 45 00, a complete copy of their Online Representations
and Certifications from SAM.gov with an expiration date on or after the date of award.
***NOTE: This solicitation, W912P826BA082, corresponds to the presolicitation notice previously issued under
W912P826BA080. The solicitation number changed due to recreation of the solicitation package in ACWS.***
-- 2 of 441 --
ALL INQUIRIES REGARDING THIS SOLICITATION
SHOULD BE MADE TO THE FOLLOWING:
FRANCESCA DEBOER
CONTRACT SPECIALIST
U.S. ARMY CORPS OF ENGINEERS, NEW ORLEANS DISTRICT
E-MAIL: FRANCESCA.E.DEBOER@USACE.ARMY.MIL
PHONE: (504) 862-1607
COLLECT CALLS NOT ACCEPTED
NOTE: FOR THE MOST PROMPT RESPONSE, PLEASE SEND ALL QUESTIONS VIA E-MAIL.
-- 3 of 441 --
PTC-i Ed 25-017
PROJECT TABLE OF CONTENTS
Division 00 – PROCUREMENT AND CONTRACTING
Solicitation, Offer and Award SF-1442
00 10 00 Bidding Schedule
00 21 00 Instructions
00 45 00 Representations and Certifications
00 70 00 Conditions of The Contract
00 72 00 General Conditions
Division 01 - GENERAL REQUIREMENTS
01 00 00 General Provisions
01 32 01.00 12 Project Schedule
01 33 00 Submittal Procedures
01 35 26 Governmental Safety Requirements
01 42 00 Sources for Reference Publications
01 45 00.15 10 Resident Management System Contractor Mode (RMS CM)
01 45 04.00 10 Contractor Quality Control
01 57 20.00 12 Environmental Protection
01 78 02.00 10 Closeout Submittals
Division 02 – EXISTING CONDITIONS
02 41 00 Demolition
Division 03 – CONCRETE
03 11 14.00 12 Formwork for Concrete
03 15 13.00 12 Expansion Joints In Concrete
03 21 00.00 12 Reinforcing Steel
03 31 00.00 12 Cast-In-Place Structural Concrete
Division13 – SPECIAL CONSTRUCTION
13 34 19 Metal Building Systems
Division 31 – EARTHWORK
31 11 00.00 12 Clearing and Grubbing
31 23 16.16 12 Structural Excavation and Backfill
-- 4 of 441 --
PTC-ii Ed 25-017
Division 32 – EXTERIOR IMPROVEMENTS
32 12 16.00 12 Asphaltic Pavement
32 13 13.06 Portland Cement Concrete Pavement for Roads and
Site Facilities
32 17 23.16 Parking Lot Pavement Markings
32 31 13 Chain Link Fences and Gates
Division 33 – UTILITIES
33 05 00.00 12 Modification to Existing Utilities
-- 5 of 441 --
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR
INFORMATION CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
CODE
6. PROJECT NUMBER
8. ADDRESS OFFER TO
4. CONTRACT NUMBER
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD F…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 237990)
Johnson Field Repair
DEPT OF DEFENSE · Solicitation · due September 14, 2026
San Rafael Creek and ATF FY26 Maintenance Dredging
DEPT OF DEFENSE · Solicitation · due September 2, 2026
CORINTH NATIONAL CEMETERY, 838CM3036 – GRAVESITE EXPANSION AND CEMETERY IMPROVEMENTS
VETERANS AFFAIRS, DEPARTMENT OF · Presolicitation
Z--Webster Dam Spillway Radial Gates Repair
INTERIOR, DEPARTMENT OF THE · Solicitation · due September 10, 2026