What this opportunity is
The Department of the Interior is seeking a contractor for the repair of spillway radial gates at Webster Dam in Kansas, specifically focusing on the rehabilitation of metalwork coatings and related components. This opportunity is set aside for small businesses, making it suitable for firms within the small business category. Interested contractors should note that this is a solicitation notice, indicating that they will need to prepare a bid rather than simply track the opportunity.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
Webster Dam
Spillway Radial Gates Repair
Table of Contents
00 01 10 - 1
SECTION C - DESCRIPTION / SPECIFICATIONS
TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 Summary of Work
01 14 10 Use of Site
01 14 20 Radial Gate Operation
01 33 00 Submittals
01 35 10 Safety Data Sheets
01 35 20 Safety and Health
01 35 30 Contractor’s Onsite Safety Personnel
01 42 10 Reference Standards
01 46 00 Quality Procedures
01 51 00 Temporary Utilities
01 55 00 Vehicular Access and Parking
01 55 20 Traffic Control
01 56 10 Protection of Existing Installations
01 56 15 Protection of Existing Utilities
01 57 20 Environmental Controls
01 57 30 Water Pollution Control
01 57 60 Protected Species
01 74 00 Cleaning and Waste Management
01 78 30 Project Record Documents
DIVISION 02 - EXISTING CONDITIONS
02 83 30 Removal and Disposal of Coatings Containing Heavy Metals
DIVISION 03 through DIVISION 06 – NOT USED
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
07 92 10 Sealants
DIVISION 08 – NOT USED
DIVISION 09 - FINISHES
09 96 20 Coatings
DIVISION 10 through DIVISION 34 – NOT USED
DIVISION 35 – WATERWAY AND MARINE CONSTRUCTION
35 23 51 Spillway Radial Gate Seal Replacement
DIVISION 36 though DIVISION 40 – NOT USED
DIVISION 41 – MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 31 Refurbishment of Spillway Radial Gate Hoists
-- 1 of 201 --
Webster Dam
Spillway Radial Gates Repair
Table of Contents
00 01 10 - 2
DIVISION 42 though DIVISION 50 – NOT USED
DIVISION 51 – INFORMATION AVAILABLE TO OFFERORS
51 00 00 Information Available to Offerors
51 02 83 Existing Coatings Analysis
51 09 96 Photographs
DIVISION 52 – DRAWINGS
52 00 00 Drawings
DIVISION 53 – NOT USED
END OF CONTENTS
-- 2 of 201 --
Webster Dam
Spillway Radial Gates Repair
Summary of Work
01 11 00 - 1
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.01 LOCATION
A. Work is located at Webster Dam approximately 8 miles west of Stockton, Kansas in
Rooks County. Refer to Figure 1, Site Map, for project location.
1.02 PRINCIPAL COMPONENTS OF WORK
A. Work under these specifications includes the rehabilitation of the metalwork coatings for
three spillway radial gates located at the Webster Dam Spillway:
1. External upstream, downstream and edges of gate surfaces, radial arm structural
steel members, trunnion assemblies and floatwell covers and frames on the inner
piers: removal of existing coating system including handling and disposal; sealing
crevasses between structural members; application of new coating system;
removal and replacement of bottom and side gate seals.
2. Internal structural steel, skin plates, cover openings surfaces, and gallery: removal
of existing coating system including handling and disposal and application of new
coating system.
3. Wire Rope and components replacement.
1.03 SPECIFICATIONS REQUIREMENTS
A. Requirements in Division 1, General Requirements, apply to Divisions 2 through 53.
B. Imperative statements in these specifications are Contractor requirements, unless
otherwise stated.
C. Where specifications are written in streamlined form, the words “shall be” are included
by inference where a colon (:) is used within the sentence or phrase.
1.04 DEFINITIONS
A. When the specifications use a word or term defined in the Federal Acquisition
Regulations (FAR), the definition of the word or term shall be in accordance with FAR
sections in effect at the time the solicitation was issued.
1.05 ACRONYMS
A. The following acronyms apply to specifications Divisions 1 through 53:
-- 3 of 201 --
Webster Dam
Spillway Radial Gates Repair
Summary of Work
01 11 00 - 2
1. CO: Contracting Officer
2. COR: Contracting Officer’s Representative
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
-- 4 of 201 --
Webster Dam
Spillway Radial Gates Repair
Summary of Work
01 11 00 - 3
FIGURE 1
Site Map
END OF SECTION
KS State Hwy258
To KS State Highway 24
To Benkelman, NE
Webster Dam
Stockton, KS
Webster Reservoir
N
Webster Dam Spillway
Webster Dam
Spillway
Radial Gates
Gravel access road to
upstream side of spillway
-- 5 of 201 --
Webster Dam
Spillway Radial Gates Repair
Summary of Work
01 11 00 - 4
This page intentionally left blank.
-- 6 of 201 --
Webster Dam
Spillway Radial Gates Repair
Use of Site
01 14 10 - 1
SECTION 01 14 10
USE OF SITE
PART 1 GENERAL
1.01 MEASUREMENT AND PAYMENT
A. Cost:
1. Include in prices offered in the Schedule for other items of work.
1.02 REFERENCE STANDARDS
A. Bureau of Reclamation (USBR)
1. USBR Cleaning Manual Inspection and Cleaning Manual for
Equipment and Vehicles to Prevent the
Spread of Invasive Species (Technical
memorandum No. 86-68220-07-05) 2010
Edition
Available online at:
http://www.usbr.gov/mussels/prevention
1.03 SUBMITTALS
A. Submit the following in accordance with Section 01 33 00 - Submittals.
B. RSN 01 14 10-1, Land Use and Landscape Rehabilitation Plan:
1. For each Contractor use site on Government land.
a. Show use location and extent of impact. Uses include but are not limited
to the following:
1) Buildings and service areas including offices, shops, warehouses,
storage areas, fuel and oil storage areas, and fabrication yards.
2) Parking areas, temporary roads, and haul routes.
3) Utilities including air, power, and water lines; fire hydrants; and
compressor station.
4) First-aid and medical facilities.
5) Areas for processing, storing, and disposing of waste materials
from construction operations.
6) Temporary fences.
b. Describe methods to preserve, protect, and repair if damaged, vegetation
(such as trees, shrubs, and grass) and other landscape features on or
adjacent to the jobsite, which are not to be removed and which do not
-- 7 of 201 --
Webster Dam
Spillway Radial Gates Repair
Use of Site
01 14 10 - 2
interfere with the work required under this contract. Include methods to
mark work area limits, protect disturbed areas, and prevent erosion.
c. Describe methods to protect, and repair if damaged, existing
improvements a…