Narragansett, RI - Diesel Generator & ATS Svc & Mx
COMMERCE, DEPARTMENT OF
Notice type
Solicitation
Solicitation #
1305M326Q0492
NAICS
238210
PSC
J059
Set-aside
Small Business Set Aside - Total
Posted
August 25, 2026
Response due
September 8, 2026
Description
STATEMENT OF WORK (SOW)
NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION (NOAA)
Backup Generator and Transfer Switch Recommissioning and Service
Narragansett, RI Facility
1.0 GENERAL
1.1 BACKGROUND
The current generator and automatic transfer switch are from 2004 and in need of a factory
recommissioning to meet original equipment manufacturer (OEM) specifications. The factory
recommission is a cost-effective measure to increase equipment lifespan rather than an
expensive replacement project. Narragansett, RI deals with frequent power outages due to high
winds, brown outs, and storms and relies on the generator to supply power to the campus.
Without emergency generator protection the lab is in violation of National Fire Protection
Association NFPA 110 - Standard for emergency and standby power systems.
1.2 SCOPE
This project involves factory recommissioning (1) Cummins DFAC-5569711 250KW Diesel
Generator and (1) Cummins BTPCD-5569631 Automatic Transfer Switch. The project also
involves a major preventative maintenance, load bank testing, generator starter condition test,
and fuel condition test.
1.3 OBJECTIVE
When Completed Testing will be done to ensure that the backup power systems seamlessly
start and take the full load of the facility as intended by manufacturer and original installation.
With service done to these systems the facility will be able to rely on backup generators for
power during the upcoming years, and the service life of these systems will be extended.
Without this work being accomplished power failure will endanger years of scientific research
and samples.Without emergency generator protection the lab is in violation of National Fire
Protection Association NFPA 110 - Standard for emergency and standby power systems.
1.4 APPLICABLE DOCUMENTS
1.4.1 Compliance Documents
The following documents provide specifications, standards, or guidelines that must be complied
with in order to meet the requirements of this contract.
1.4.2 Reference Documents
Reference documents are attached for the Cummins Diesel Generator DFAC-5569711 as well
as the Cummins Automatic Transfer Switch BTPCD-5569631.
2.0 SPECIFIC REQUIREMENTS/TASKS
2.1 TASK ONE - Major Preventative Maintenance - (1) Cummins Diesel Generator DFAC-
5569711 & (1) Cummins Automatic Transfer Switch BTPCD-5569631
2.1.1 The contractor shall perform major preventative maintenance on the diesel generator in
accordance with manufacturer's specifications, recommendations, and industry standards.
2.1.2 The contractor shall perform major preventative maintenance on the automatic transfer
switch in accordance with manufacturer's specifications, recommendations, and industry
standards.
2.1.3 The contractor shall safely dispose of all waste produced to include oil. The Contractor
shall provide their own waste disposal containers. The use of Government-owned dumpsters
or refuse receptacles is strictly prohibited.
2.2 TASK TWO - Factory Recommission (1) Cummins Diesel Generator DFAC-5569711
-- 1 of 9 --
Page 2 of 9
2.2.1 The contractor shall factory recommission Cummins Diesel Generator DFAC-5569711
in accordance with manufacturer's specifications.
2.2.2 The contractor shall provide a report to the COR to include test results, recommended
repairs, and recommended repairs.
2.3 TASK THREE - Factory Recommission (1) Cummins Automatic Transfer Switch
BTPCD-5569631
2.3.1 The contractor shall factory recommission Cummins Automatic Transfer Switch
BTPCD-5569631 in accordance with manufacturer's specifications.
2.3.2 The contractor shall provide a report to the COR to include test results, recommended
repairs, and recommended repairs.
2.4 TASK FOUR -Test functionality of the recommissioned Generator and Automatic
Transfer switch.
2.4.1 - Load Bank Test
1. The contractor shall perform a load bank test per manufacturer's specifications and
recommendations.
2. The contractor shall provide a report to the COR to include test results, recommended
repairs, and recommended repairs.
2.4.2 - Starter Condition Test
1. The contractor shall perform a starter condition test per manufacturer's specifications
and recommendations.
2. The contractor shall provide a report to the COR to include test results, recommended
repairs, and recommended repairs.
2.4.3 - Fuel Condition Test
1. The contractor shall test the condition of the fuel supplying the generator for any
impurities.
2. The contractor shall provide a report to the COR to include test results and
recommended repairs.
2.5 - FINAL ACCEPTANCE AND INSPECTIONS
1. Inspection of work to be performed by the NEFSC Facilities Operations Manager -
COR. Any corrective action required because of the inspection will be accomplished
prior to final billing.
2. The Contractor may be notified of deficiencies in performance in writing by the COR.
Oral deficiency notifications will be confirmed in writing. The Contractor shall take
prompt corrective action upon notice of deficiency.
3. The Contractor shall advise the Government when all work is completed. The
Government will not accept the work until it determines that all work has been
satisfactorily completed within the terms of the contract.
2.6.1 - OPTIONAL ITEM - up to 30 Day Generator Rental The contractor shall provide
pricing for up to 30-day generator rental installation as an optional contract line item.
2.6.2 OPTIONAL ITEM - Unexpected Repairs - LABOR - Set LABOR rate per hour for
unexpected repairs. Contractor shall provide pricing for set labor rates for optional line item.
2.6.3 OPTIONAL ITEM - Unexpected Repairs - MATERIALS - Set markup % over published
list prices for parts and materials required for unexpected repairs. Contractor shall provide set
materials mark-up % for optional line item.
-- 2 of 9 --
Page 3 of 9
3.0 CONTRACTOR PERSONNEL
3.1 QUALIFIED PERSONNEL
The Contractor shall provide qualified personnel to perform all requirements specified in this
SOW.
3.2 CONTINUITY OF SUPPORT
The Contractor shall ensure that the contractually…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 238210)
Fiber Optic Cabling Requirement Contract
DEPT OF DEFENSE · Solicitation · due September 4, 2026
Repair of CCTV Fiber Connection
DEPT OF DEFENSE · Sources Sought · due September 1, 2026
J--Replacement Maintenance Shop Fire Alarm Control Pa
INTERIOR, DEPARTMENT OF THE · Award Notice
Upgrade Electrical and HVAC Components, Classrooms Near B191000
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due August 28, 2026