NFSR 373 Aggregate Hauling

AGRICULTURE, DEPARTMENT OF

Notice type
Combined Synopsis/Solicitation
Solicitation #
12444126Q0038
NAICS
115310
PSC
Z1LB
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
June 25, 2026
Response due
July 2, 2026
Place of performance
Prescott, AZ

Description

1 | P a g e SOUTHWESTERN REGION 03 PRESCOTT NATIONAL FOREST NFSR 373 AGGREGATE HAULING NFSR 360 CATTLE GUARD REPLACEMENT STATEMENT OF WORK U.S. FOREST SERVICE 05/12/2026_Revision2 -- 1 of 27 -- 2 | P a g e TABLE OF CONTENTS 1.0 GENERAL INFORMATION.................................................................................................. 4 1.1 WORK SUMMARY .....................................................................................................................4 1.2 PROJECT LOCATION ...................................................................................................................4 1.2.1 NFSR 373 MATERIAL HAULING .................................................................................................... 4 1.2.2 NFSR 360 CATTLE GUARD REPLACEMENT ................................................................................... 4 1.3 PERFORMANCE PERIOD & WORK RESTRICTIONS ........................................................................5 1.4 POINTS OF CONTACT .................................................................................................................5 1.5 CONTRACTOR STAGING & STORAGE AREAS ...............................................................................5 1.6 UTILITIES & SANITATION SERVICES ............................................................................................5 1.7 USE OF PREMISES ......................................................................................................................5 1.8 GOVERNMENT FURNISHED ITEMS AND MATERIALS ...................................................................5 1.9 PROTECTION OF NATURAL RESOURCES......................................................................................6 1.10 COORDINATION OF RESOURCES ..............................................................................................6 1.11 SUBMITTALS ...........................................................................................................................6 2.0 PROJECT SCOPE ............................................................................................................... 7 2.1 SCOPE .......................................................................................................................................7 2.2 BASE BID LINE ITEMS .................................................................................................................7 2.2.1 MOBILIZATION AND DEMOBILIZATION........................................................................................ 7 2.2.2 LOADER WITH OPERATOR ............................................................................................................ 7 2.2.3 DUMP TRUCK WITH OPERATOR................................................................................................... 7 2.2.4 VIBRATORY SMOOTH DRUM ROLLER WITH OPERATOR .............................................................. 7 2.2.5 WATER TENDER WITH OPERATOR ............................................................................................... 8 2.2.6 AGGREGATE MATERIAL PURCHASE ............................................................................................. 8 Table 1, FP-24, Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, Section 703.05 Subbase, Base, and Surface Course Aggregate ............................................. 9 2.2.7 AGGREGATE MATERIAL HAULING AND DELIVERY ....................................................................... 9 2.3 OPTION BID LINE ITEMS ..........................................................................................................10 2.3.1 ROAD GRADER WITH OPERATOR ............................................................................................... 10 2.3.2 NFSR 360 CATTLE GUARD REPLACEMENT ................................................................................. 10 2.4 SCOPE ATTACHMENTS .............................................................................................................11 ATTACHMENT A – PROJECT MAP, NFSR 373 AND STOCKPILE LOCATION ............................... 12 ATTACHMENT B – PROJECT MAP, STOCKPILE LOCATION, WILLOW WORK CENTER................ 13 -- 2 of 27 -- 3 | P a g e ATTACHMENT C – AGGREGATE STOCKPILE PICTURES ........................................................... 14 ATTACHMENT D – PROJECT MAP, NFSR 360 CATTLE GUARD & VERDE RANGER STATION ...... 15 ATTACHMENT E – PROJECT MAP, NFSR 360 CATTLE GUARD ................................................. 16 ATTACHMENT F – EXISTING CATTLE GUARD PICTURES ......................................................... 17 ATTACHMENT G – GOVERNMENT-FURNISHED CATTLE GUARD SUPPLIES .............................. 19 ATTACHMENT H – WARNING SIGN INSTALLATION GUIDELINES ............................................ 21 ATTACHMENT I – TYPE 3 OBJECT MARKER INSTALLATION GUIDELINES ................................. 24 ATTACHMENT J – TYPICAL ROADWAY SECTIONS, AGGREGATE SURFACED ............................ 25 ATTACHMENT K – COMPACTION SPECIFICATIONS, FP-24 ..................................................... 26 -- 3 of 27 -- 4 | P a g e 1.0 GENERAL INFORMATION 1.1 WORK SUMMARY Load and haul MAG ABC aggregate from Prescott National Forest stockpile location at Willow Work Center to National Forest System Road (NFSR) 373, Thumb Butte Road. 1.2 PROJECT LOCATION 1.2.1 NFSR 373 MATERIAL HAULING The existing stockpile is located at LAT 34.594533° / LONG -112.511707° at the Willow Work Center in Yavapai County, Arizona, within Prescott city limits. From the Bradshaw Office (344 S. Cortez, Prescott, AZ, 86303), drive west on Aubrey Street, then turn right on S. Montezuma Road. Drive 1.5 miles, then the road turns curves to form Whipple Street. Drive 0.7 miles, then continue straight through the intersection, where the road turns into W. Iron Springs Road. Drive 1.4 miles, then turn right onto Williamson Valley Road. Contin

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 115310)