Overhaul - Barrier Boat

DEPT OF DEFENSE

Notice type
Sources Sought
Solicitation #
N3904026Q5666
NAICS
336611
PSC
J019
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
June 26, 2026
Response due
July 14, 2026
Place of performance
Kittery, ME

What this opportunity is

The Department of Defense is seeking a contractor to overhaul a barrier boat, classified under NAICS code 336611 and PSC code J019. This opportunity is set aside for total small businesses, as per FAR 19.5. The work will be performed in Maine. As a Sources Sought notice, this is a preliminary step to identify potential bidders, so small businesses should track this opportunity rather than submitting a bid at this time.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

Page 1 of 48 STATEMENT OF WORK – DRAFT Contents STATEMENT OF WORK .................................................................................................................................. 2 ATTACHMENT 1 – Accountability of Manhour and Material Reservation................................................ 7 ATTACHMENT 2 – Transportation, Blocking, and Handling ...................................................................... 9 ATTACHMENT 3 – Hull Inspection........................................................................................................... 12 ATTACHMENT 4 - Fender ........................................................................................................................ 15 ATTACHMENT 5 – Propulsion Shaft, Propeller, and Rudder ................................................................... 16 ATTACHMENT 6 – Fuel System Maintenance ......................................................................................... 20 ATTACHMENT 7 – Electrical Power Generation and Distribution System Maintenance and Upgrade .. 23 ATTACHMENT 8 – Sea Water System ..................................................................................................... 25 ATTACHMENT 9 – Fire Suppression System Certification....................................................................... 27 ATTACHMENT 10 – Steering System Maintenance ................................................................................ 28 ATTACHMENT 11 – Propulsion System Upgrade and Maintenance ....................................................... 29 ATTACHMENT 12 - Outfitting .................................................................................................................. 32 ATTACHMENT 13 – Pilot House .............................................................................................................. 34 ATTACHMENT 14 – Hull Preservation ..................................................................................................... 36 ATTACHMENT 15 – Sea Trial ................................................................................................................... 38 ATTACHMENT 16 – Towing Service ........................................................................................................ 40 ATTACHMENT 17 – Temporary Service .................................................................................................. 42 ATTACHMENT 18 – Cleaning and Pumping............................................................................................. 44 ATTACHMENT 19 – Lift, Block, Feet, and Undock ................................................................................... 45 -- 1 of 48 -- Page 2 of 48 STATEMENT OF WORK 1. SCOPE 1.1. Title: Portsmouth Naval Shipyard is requesting overhaul service of a barrier boat listed in identification section 1.3. 1.2. Location of Work: 1.2.1. Portsmouth Naval Shipyard (PNSY), Kittery, Maine. 1.2.2. Contractor’s Facility 1.3. Identification: 30BB0701 with specific identified areas listed in the attachments. 1.4. Security Classification: a portion of this work will take place in a NAVSEA Controlled Industrial Area. 2. REFERENCES 2.1. See individual Attachments to this Statement of Work. 3. REQUIREMENTS 3.1. The Contractor shall complete all overhaul tasks in this Statement of Work and its Attachments, three (3) months from award and delivery of vessel to Contractor’s Facility. Any identified barriers that will impact this timeframe shall be communicated and accepted by TPOC/COR. 4. GENERAL 4.1. The information received in the consolidated final report of 3.6 will be used by the Contracting Officer in the issuance of one contract modification, which will be a final settlement for each reservation Work Items. 4.2. The reservations listed in the individual Work Items are not to be considered Time and Material or a Level of Effort. Once the scope of work for a task has been listed an mutually agreeable number of SHIP: 30BB0701 manhours or materials has been agreed to, neither party will be entitled to an adjustment based on actual manhours or material dollars required. 5. UNSCHEDULED & EMERGENCY REPAIRS 5.1. If replacement parts are necessary to perform PM or repairs, and these parts are not provided in the routine maintenance process, the contractor shall submit a Condition Found Report (CFR) (CDRL A020, B020, C020, D020, E020). The vendor shall not continue with the repairs identified on the CFR until authorization to perform the proposed work has been approved by the TPOC and the Contracting Officer. If the repair is approved, the replaced part shall be provided to Department of the Navy (DON) personnel for evaluation of the damaged part. -- 2 of 48 -- Page 3 of 48 5.2. Upon receipt of the documentation required by the vendor in paragraph 5.1 the Government will review the work request to verify the work is required and should not be covered under other line items covered on the contract. The Government will verify and approve that the corrective actions are appropriate. 5.3. Work on any unplanned repairs cannot commence until approval is granted by the Government. The Contractor shall receive authorization from to the Technical POC or COR prior to commencing any work or exceeding any established cost thresholds. 5.4. For any work exceeding the original request or outside the defined limitations, the contractor must obtain approval from the Government, in the same manner as paragraph 5.1, 5.2, and 5.3, before proceeding. 5.5. The COR will coordinate periodically with the Contracting Officer (KO) to monitor contract performance, ensure cost control, and prevent cost overruns beyond the authorized scope of work. 5.6. All work performed under this contract is subject to Government acceptance. 6. PRICING 6.1. Contractor shall provide fixed pricing for each year of maintenance for this contract, to include the base period and each subsequent option period. Pricing

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 336611)