Playground Zipline Demolition
DEPT OF DEFENSE
Notice type
Combined Synopsis/Solicitation
Solicitation #
FA521526Q0023
NAICS
238910
PSC
P400
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
July 13, 2026
Response due
July 22, 2026
Place of performance
Honolulu, HI
Description
Page 1 of 3
STATEMENT OF WORK
15th WG Hickam Field of Dreams Zip line Demolition
Joint Base Pearl Harbor Hickam
15 th Wing 20260413
-- 1 of 3 --
Page 2 of 3
1. Scope: This Statement of Work (SOW) defines the effort required to remove the zip line
adjacent to the "Field of Dreams" playground between Vickers and Worthington.
1.1. Background: This site is maintained by a Base Operations Support (BOS) contractor.
Should the prime contractor require support (e.g., labor, equipment) from the BOS contractor,
they may coordinate directly with them in accordance with (IAW) the applicable site support
letter. Any support provided by the BOS contractor shall be contracted directly between the
prime contractor and the BOS contractor; the Government is not responsible for these
arrangements.
2. Applicable Documents:
2.1. Installation Design Guide (IDG)
2.2. Consumer Product Safety Commission (CPSC) Public Playground Safety Handbook
3. Requirements:
3.1. General Requirements
3.1.1. Unless otherwise noted in writing by the Contracting Officer (CO), the CO is the only
person with the authority to change, modify, deny, or approve any part of the SOW, and has sole
authority for all aspects of the contract, contract changes, approvals, payments, and project
changes.
3.1.2. The Contractor shall provide all material, equipment, labor, supervision, and fuel required
to accomplish the requirements of this SOW.
3.1.3. The Contractor shall be responsible for all personnel and material transportation to and
from the job site, as well as any personnel housing/accommodations and food for the duration of
the project.
3.1.4. The Contractor shall adhere to all NFPA, OSHA, EPA, and all federal, state, and local
regulations while performing the requirements of this SOW.
3.1.5. The Contractor is responsible for ensuring the site complies with the Installation Design
Guide and the Consumer Product Safety Commission guidance on public playgrounds upon
project completion.
3.1.6. All demolished, scrap, and surplus materials used or generated in this project must be
removed from the installation and disposed of in accordance with site policy prior to final
inspection. This shall be completed at the Contractor's expense.
3.1.7. All work must be completed within 90 calendar days of contract award.
3.1.8. Prior to any digging, an AF Form 103 (Base Civil Engineering Work Clearance Request)
must be completed and approved.
-- 2 of 3 --
Page 3 of 3
3.1.9. Transportation: N/A
3.1.10. Third Party Support: N/A
3.1.11. Billeting: N/A
3.2. Specific Requirements:
The Contractor shall perform the following specific tasks:
3.2.1. Remove all zip line equipment.
3.2.2. Cut equipment at the top of the footer OR remove surface mount bolts and anchors.
3.2.3. Ensure concrete footers remain in place.
3.2.4. Ensure safety surfacing and curbing remain in place.
3.2.5. Reinstall foam/buffings underlayment as needed to restore site integrity.
3.2.6. Patch turf surfacing as needed to provide a smooth surface completely free of tripping and
fall hazards.
4. Submittals:
4.1. All project submittals must be accompanied by a completed AF Form 3000 (Material
Approval Submittal). All AF Form 3000s will be submitted to the CO for signature. If there is a
change in process or material that is different from what was proposed and awarded, the CO or
PM’s signature on the AF Form 3000 does not constitute an approved change order. Any
changes must be coordinated with the CO prior to submission of the AF Form 3000 for
signature.
4.2. The Contractor shall submit a Schedule Timeline to the Contracting Officer within 15 days
of award. This schedule must capture all major project milestones, including at a minimum:
material orders, shipments, construction start, and project completion.
4.2.1. The Contractor will provide an update to the schedule provided in 4.2 to the 766 ESS and
Project Program Manager if there are any significant changes (understood as changes that shift
the schedule by more than 5 business days).
4.3. The Contractor shall submit the project invoice in Wide Area Workflow (WAWF) through
the Procurement Integrated Enterprise Environment (PIEE) portal within 30 days of project
completion and inspection, IAW DFARS Clause 252.232-7006 of the awarded contract.
4.3.1. Project completion is defined as all work having been completed IAW the SOW, all
submittals required in Sections 4.1 and 4.2 above having been received and accepted by the
Government, and final inspection/acceptance having occurred.
5. Appendix: N/A
6. Attachments:
1. Playground layout
-- 3 of 3 --
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 238910)
Dry Dock Elevator Dismantle
DEPT OF DEFENSE · Sources Sought · due July 28, 2026
W569QE26QA007 Combined Synopsis Solicitation - T4 Demolition / Ft Bliss,TX
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due July 29, 2026
Former General Leonard Wood Army Community Hospital Demolition, Optical Fabrication Laboratory, with Site Improvements
DEPT OF DEFENSE · Sources Sought · due July 30, 2026
P--WV CANAAN VLY NWR BONNER HS DEMO
INTERIOR, DEPARTMENT OF THE · Solicitation · due July 23, 2026
Range Echo Berm Upgrade - Fort Devens, MA
DEPT OF DEFENSE · Solicitation · due July 27, 2026
B2A Demolition, NIST, Boulder, CO
COMMERCE, DEPARTMENT OF · Combined Synopsis/Solicitation · due August 12, 2026