What this opportunity is

The Department of Defense is seeking a contractor for the removal and replacement of the Installation Boundary Fence at Vance AFB in Enid, Oklahoma, under NAICS 238990. This opportunity is open to all businesses, as there is no set-aside. Interested contractors should note that the solicitation is a combined synopsis/solicitation, requiring frequent monitoring of SAM.gov for updates. Quotes must be submitted by July 15, 2026, and will be evaluated based on the Lowest-Price Technically Acceptable criteria, with funding availability being a critical factor for award.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

Design Percent Completion: 100% May 22, 2026 Statement of Work REPAIR INSTALLATION BOUNDARY FENCE, 7211 VANCE AIR FORCE BASE, OKLAHOMA FACILITY PROJECT ID 1024596, WORK TASK #: 18429975 PREPARED BY CHELSI MOOTZ & JOMARA ORTIZ -- 1 of 66 -- 400 Young Road Vance AFB, OK 73705 580.213.7174 FP1024596, WT#18429975 Page 1 of 14 Repair Installation SoW Version 4.0 Boundary Fence, F7211 INDEX PART 1 GENERAL ....................................................................................................................................... 2 1.01. PROJECT DESCRIPTION ..................................................................................................................... 2 1.02. INSTRUCTIONS TO BIDDERS ............................................................................................................. 2 1.03. LOCATION OF WORK ........................................................................................................................ 2 1.04. SCOPE OF WORK .............................................................................................................................. 2 1.05. CHANGES.......................................................................................................................................... 6 1.06. WARRANTY....................................................................................................................................... 6 1.07. SCHEDULE OF WORK ........................................................................................................................ 6 1.08. WORK RESTRICTIONS ....................................................................................................................... 7 1.09. CONTRACTOR’S REPRESENTATIVE ................................................................................................... 8 1.10. PROVIDED SERVICES AND UTILITIES ................................................................................................ 9 1.11. INSPECTION .................................................................................................................................... 10 1.12. EXCESS MATERIALS (EXCLUDING HAZARDOUS MATERIALS OR WASTE) ....................................... 10 1.13. SPECIAL MATERIALS ....................................................................................................................... 10 1.14. MATERIALS ..................................................................................................................................... 10 PART 2 EXECUTION.................................................................................................................................. 12 2.01. SITE SAFETY REQUIREMENTS ......................................................................................................... 12 2.02. INSTALLATION ................................................................................................................................ 12 PART 3 SITE INFORMATION..................................................................................................................... 13 PART 4 APPENDICES ................................................................................................................................ 14 4.01. APPENDIX A – SITE PHOTOS ........................................................................................................... 14 4.02. APPENDIX B – BID FORM................................................................................................................ 14 4.03. APPENDIX C – SPECIFICATIONS ...................................................................................................... 14 4.04. APPENDIX D – RECORD DRAWINGS ............................................................................................... 14 4.05. APPENDIX E – SCHEDULE E ............................................................................................................ 14 -- 2 of 66 -- 400 Young Road Vance AFB, OK 73705 580.213.7174 FP1024596, WT#18429975 Page 2 of 14 Repair Installation SoW Version 4.0 Boundary Fence, F7211 PART 1 GENERAL 1.01. PROJECT DESCRIPTION A. The work covered under this Statement of Work shall consist of repairing a section of the Installation’s boundary fence and any incidental work necessary to provide a complete and usable finished product. 1.02. INSTRUCTIONS TO BIDDERS A. As part of the bid package the Contractor shall submit a completed copy of APPENDIX B – BID FORM, along with all required documentation as stated in Sam.gov. B. Owner reserves the right to reject any bid which does not completely satisfy the Statement of Work. 1.03. LOCATION OF WORK A. Location of work to be accomplished under this statement of work is at Vance Air Force Base (AFB). Vance AFB is located three miles south of the City of Enid, Oklahoma. The portion of Facility 7211, the Perimeter Fence, to be replaced, is located on the south end of the Installation. 1.04. SCOPE OF WORK A. The Contractor shall furnish all supervision, labor, equipment, consumable materials, supplies, tools, and other items to complete the construction as listed in the Scope of Work. All quotes shall include all shipping charges for completion of the project. The contractor will coordinate all work with ASRC Federal Construction Management prior to execution. The list of items below are to be considered the general Scope of Work for the project. B. The Contractor shall field verify location of work, dimensions, and existing site conditions prior to commencing work. The Contractor shall contact ASRC Construction Management for any discrepancies with the Scope of Work. C. This project requires repair and restoration of the installation boundary fence to establish a continuous security barrier. All work shall match the existing configuration and comply with Unified Facilities Criteria (UFC) 4-022-03 standards, with the exception of the fabric hei

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 238990)