REV-1(FO) Motor for No. One Refrigeration Plant Compressor; repair

DEPT OF DEFENSE

Notice type
Solicitation
Solicitation #
N6264926Q0473
NAICS
336611
PSC
J999
Set-aside
No Set aside used
Posted
July 15, 2026
Response due
August 10, 2026
Place of performance
Sasebo City, JP-42

Description

Ship/HULL NO. Ship/HULL NAME ICN: Rev: Key Op: ____LHA-7 USS TRIPOLI JON. 38DJA51 605 01 AOl TITLE: No.One Refrigeration Plant Compressor; repair Rev-I (FO)-Motor for No.One Refrigeration Plant Compressor; repair JOB SPECIFICATION Anticipated Award Date Production Completion Date: PREPARING ACTIVITY: SASEBO POP Start Date: POP End Date: PREPARED BY: S. NISHINO CODE E_Nl DATE 316/2026 APPROVED BY: S. MURAKAMI / 7 CODE S225 CONCURRED BY: A. OKA CODE S233 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ASSIST PLANNER'S NAME: CODE _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ASSIST PLANNER'S NAME: CODE ASSIST PLANNER'S NAME: CODE DESCRIPTION: JSN(S): EAO5-L063 CASREP # 26026. DTG: 060336ZFEB26. C-3 S/F CONTACT: THOMAS MMC I GREEAR CWP # CCNS # Approved by S3001S900 Date:t6'>V\4i€2 AvI: -6-At LWC: Work Completed S/Force: Ship Supt: Rate: Date: Date: SRF CONTROL NO.:____________________________ WORK CERTIFICATION SIGNATURES COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE: -- 1 of 3 -- Ship/HULL NO. Ship/HULL NAME ICN: Rev: Key Op: LHA-7 USS TRIPOLI JON. 38DJA51605 01 AOl TITLE: No.One Refrigeration Plant Compressor; repair Rev-1(FO)--Motor for No.One Refrigeration Plant Compressor; repair 1. SCOPE: 1.1 Title: No.One Refrigeration Plant Compressor; repair Rev -1(FO) -Motor for No.One Refrigeration Plant Compressor; repair 1.2 Location of Work: 1.2.1 Fire Pump and REFR MCHRY Room (6-45--0-E) 1.3 Identification: 1.3.1 Quantity (One HA) No.One Refrigeration Condensing Unit located in 1.2.1, APL: 32A060028 1.3.1.1 Quantity (One EA), Electric Motor for 1.3.1 Manufacture - General Electric CO. MFR DWG NO. - 225B7033 MFR ID - 5K326NS283H Horsepower - 50 HP Amps - 62.5 A Speed - 1800 RPM Volts - 440 VAC Frequency - 60 HZ Phase 3 Duty - CONTINUOUS INS CLASS - B APL - 175506438 2. REFERENCES: 2.1 Standard Items (FY26) 2.2 59516 -BX -MMA-010 Rev 5, Ships Stores Refrigeration Plant 5.5 Ton Capacity Operation and Maintenance 2.3 MFR DWG. 225B7033 Rev G, Alternating Current Motor 2.4 321-7564330 Rev C, Power System 60Hz Wiring Deck Plan lB FR 49 -FWD MDL 1 3. REQUIREMENTS: 3.1 Inspect the controller, cables and mounting hardware terminating in electric motor listed in 1.3.1.1 for previous damage and deterioration, using 2.2 through 2.4 for guidance. 3.1.1 Verify correct value of overload setting or size of heater coils based on motor nameplate full load running current. CV) "REPORT" 'A -- 2 of 3 -- Ship/HULL NO. Ship/HULL NAME ICN: Rev: Key Op: LHA-7 USS TRIPOLI JON. 38DJA51605 01 AOl TITLE: No.One Refrigeration Plant Compressor; repair Rev-I (FO)-Motor for No.One Refrigeration Plant Compressor; repair 3.1.2 Submit one legible copy of condition report listing results of the requirements of 3.1 and 3.1.1 to the SUPERVISOR. 3.2 Accomplish the requirements of 009-017 of 2.1 for the electric motor listed in 1.3.1.1, using 2.2 through 2.4 for guidance. 3.2.1 Accomplish the requirements of 009-032 of 2.1 for cleaning and preservation of motor housing, fan, interior and exterior of each end bell, and foundation. 3.2.2 Accomplish the requirements of 009-015 of 2.1 for balancing of each rotating assembly. 4. NOTES: 4.1 Initial Condition - During normal operation watch stander noted NR 1 reefer compressor overheating. Watch stander secured NR 1 reefer, during investigation watch stander noted freeze box temperature was 30 degrees. S/F conducted compressor oil change, investigated electric solenoids, and motor resistance all reading SAT. S/F conducted OPTEST of NR 1 reefer during OPTEST 52 amps were noted for compressor motor, S/F conducted a through visual inspection of refrigerant line on return line to NR 3 unit cooler located in the freeze box. S/F isolated NR 3 unit cooler. S/F believes overheating compressor caused by system contamination of air and moisture into refrigerant system. 4.2 SRF Tool Room will issue each gauge, dial indicator, and torque wrenches when required. 4.3 Ship's Force will issue Handheld Programmer (HHP) tester when required. 4.4 Removal, installation, and alignment of coupling will be conducted by JON 38DJA51605-H0l. 4.5 Operational test of the No.1 reefer compressor system will be conducted by JON 38DJA51605-HO1. 5. GOVERNNT FURNISHED MATERIAL (GFM): 5.1 GOVERNMENT FURNISHED MATERIALS. Symbol: M: Mndtcrv. ( rnnnzrr-', MT.¯ Mnr1,zI-,-z T.TTM ('1.. _ _ _ _ _ _ _ _ _ MATERIAL LIST .ii-ITEM PC REF I DESCRIPTION STOCK HAZ _ _ _ _ _ _ DOC QTY REQD _ _ _ _ PARA NO. NO. NO. NUMBER MAT NO. NO. _ _ . _ _ _ _ _ _ 901 BEARING, BALL, ANNULAR, _ _ _ _ 9B3110005299144 - N _ _ - 2IEA _ 3.2 PIN K55-0077 902 25 2.3 M GASKET, P/N 235A4560AJ2 9B 5330 012227968 N - 1/EA 3.2 -- 3 of 3 --

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 336611)