Solvent Storage Building Envelope & Steam Tunnel Repairs
AGRICULTURE, DEPARTMENT OF
Notice type
Combined Synopsis/Solicitation
Solicitation #
1232SA26Q0852
NAICS
238140
PSC
Z2JZ
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
July 9, 2026
Response due
August 14, 2026
Place of performance
PA
What this opportunity is
The Department of Agriculture is buying repairs to a solvent storage building envelope and steam tunnel. This total small business set-aside contract suits small businesses with a NAICS code of 238140. As a combined synopsis/solicitation, small businesses should track this opportunity closely to prepare for a potential bid.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
SPECIFICATIONS
100% SUBMITTAL
SOLVENT STORAGE BUILDING
& STEAM TUNNEL REPAIRS
USDA-ARS
Eastern Regional Research Center
600 Mermaid Lane
Wyndmoor, PA
Prepared For:
U.S. Department of Agriculture
Agricultural Research Service (ARS)
A-E Contract No.: 12305B21D0013
A-E Task Order No.: 1232SA25F0323
Prepared By:
The Johnson-McAdams Firm, P.A.
Greenwood, Mississippi
April 2, 2026
-- 1 of 513 --
Solvent Storage Building Envelope & Steam Tunnel Repairs 3525
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 00 01 01/20 WARRANTY OF CONSTRUCTION
01 00 11 06/20 GENERAL PARAGRAPHS
01 00 21 01/20 CONTRACTOR QUALITY CONTROL
01 01 00 8/10/22 GENERAL REQUIREMENTS
01 26 20 11/20, CHG 3: 02/23 WEATHER DELAYS
01 33 00 08/18 SUBMITTAL PROCEDURES
01 35 26 11/20, CHG 3: 02/22 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS
01 50 00 01/20 PROJECT CLOSEOUT
01 57 50 10/19 TEMPORARY ENVIRONMENTAL CONTROLS
01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
01 78 23 08/15 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 08/22 DECONSTRUCTION
DIVISION 03 - CONCRETE
03 01 00 02/18 REHABILITATION OF CONCRETE
03 30 53 05/14 MISCELLANEOUS CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 03 00 08/25 CONSERVATION TREATMENT FOR PERIOD
MASONRY
DIVISION 05 - METALS
05 50 13 08/24, CHG 1: 08/25 MISCELLANEOUS METAL FABRICATIONS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 08/16, CHG 3: 05/25 ROUGH CARPENTRY
06 73 01 08/23 FIBERGLASS REINFORCED PLASTIC (FRP)
GRATING
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 11 13 08/23 BITUMINOUS DAMPPROOFING
07 13 53 08/25 ELASTOMERIC SHEET WATERPROOFING
07 14 00 08/23 FLUID-APPLIED WATERPROOFING
07 17 00 08/25 BENTONITE WATERPROOFING
07 62 13 08/25 COPPER SHEET METAL FLASHING AND TRIM
07 92 00 08/23 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 08/20, CHG 1: 08/25 STEEL DOORS AND FRAMES
08 71 00 02/16, CHG 4: 02/22 DOOR HARDWARE
08 91 00 08/20 METAL DOOR LOUVERS
DIVISION 09 - FINISHES
PROJECT TABLE OF CONTENTS Page 1
-- 2 of 513 --
Solvent Storage Building Envelope & Steam Tunnel Repairs 3525
09 90 00 02/21 PAINTS AND COATINGS
09 96 00 11/14 HIGH-PERFORMANCE COATINGS
09 97 23.17 08/16, CHG 1: 11/16 CORROSION INHIBITOR COATING OF
CONCRETE SURFACES
DIVISION 22 - PLUMBING
22 00 00 05/24, CHG 1: 11/24 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 30 00 02/25 HVAC AIR DISTRIBUTION
DIVISION 26 - ELECTRICAL
26 20 00 05/25, CHG 1: 08/25 INTERIOR DISTRIBUTION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 08/23 EARTHWORK
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 11 23 05/22 AGGREGATE BASE COURSE FOR FLEXIBLE
PAVING
32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 2
-- 3 of 513 --
Solvent Storage Building Envelope & Steam Tunnel Repairs 3525
SECTION 01 00 01
WARRANTY OF CONSTRUCTION
01/20
PART 1 GENERAL
1.1 WARRANTY OF CONSTRUCTION
1.1.1 General
In addition to any other warranties set out elsewhere in this contract,
the Contractor warrants that work performed under this contract conforms
to the contract requirements and is free of any defect of equipment,
material or design furnished, or workmanship performed by the Contractor
or any of his subcontractors or suppliers at any tier. Such warranty
shall continue for a period of one year from the date of final acceptance
of the project. Under this warranty, the Contractor shall remedy at his
own expense any such failure to conform or any such defect. In addition,
the Contractor shall remedy at his own expense any damage to Government
owned or controlled real or personal property, when that damage is the
result of the Contractor's failure to conform to contract requirements or
any such defect of equipment, material, workmanship, or design. The
Contractor shall also restore any work damaged in fulfilling the terms of
this clause. The Contractor's warranty with respect to work repaired or
replaced hereunder will run for one year from the date of such repair or
replacement.
1.1.2 Notification and Compliance
The Government shall notify the Contractor in writing within a reasonable
time after the discovery of any failure, defect, or damage. Should the
Contractor fail to remedy any failure, defect, or damage described in
paragraph 1.1.1 above within a reasonable time after receipt of notice
thereof, the Government shall have the right to replace or repair and have
the cost billed to the Contractor.
1.2 EXPRESSED WARRANTY
In addition to the other rights and remedies provided by this clause, all
subcontractors', manufacturers', and suppliers' warranties expressed or
implied, respecting any work and materials shall, at the direction of the
Government, be enforced by the Contractor for the benefit of the
Government. In such case, if the Contractor's warranty under paragraph
1.1.1 above has expired, any suit directed by the Government to enforce a
subcontractor's, manufacturer's, or supplier's warranty shall be at the
expense of the Government. The Contractor shall obtain any warranties
which the subcontractors, manufacturers, or suppliers would give in normal
commercial practice. If so directed by the Contracting Officer, the
Contractor shall require any such warranties to be executed in writing to
the Government.
1.3 LATENT DEFECTS
The Warranty specified herein shall not limit the Government's rights with
respect to latent defects, gross mistake, or fraud.
SECTION 01 00 01 Page 1
-- 4 of 513 --
Solvent Storage Building Envelope & Steam Tunnel Repairs 3525
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 00 01 Page 2
-- 5 of 513 --
Solvent Storage Building Envelope & Steam Tunnel Repairs 3525
SECTION 01 00 11
GENERAL PARAGRAPHS
06/20
PART 1 GENERAL
1.1 DESCRIPTION OF WORK
1.1.1 Work To Be Done
The work to be done con…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 238140)
Z1AZ--Urgent Masonry Repairs - Tuckpointing at Dayton VAMC Bldg 411
VETERANS AFFAIRS, DEPARTMENT OF · Award Notice
Y1DZ--Repair Masonry / Structural Issues | 659-24-901
VETERANS AFFAIRS, DEPARTMENT OF · Solicitation · due August 13, 2026
Y1DZ--Repair Masonry / Structural Issues | 659-24-901
VETERANS AFFAIRS, DEPARTMENT OF · Solicitation · due August 13, 2026
Gatehouse Chimney Demolition and Reconstruction, Union Village Dam, East Thetford, VT
DEPT OF DEFENSE · Presolicitation
Z--Repaint & Repair Stucco
INTERIOR, DEPARTMENT OF THE · Presolicitation
Engraving Hampton VA
GENERAL SERVICES ADMINISTRATION · Solicitation · due July 20, 2026