Troubleshoot, Repair, and Replace Complete Auxiliary Panel on the Stratasys F900E Large Industrial Fused Deposition Modeling (FDM) 3D Printer
HOMELAND SECURITY, DEPARTMENT OF
Notice type
Combined Synopsis/Solicitation
Solicitation #
70Z03826QK0000021
NAICS
811310
PSC
J036
Set-aside
No Set aside used
Posted
August 24, 2026
Response due
August 26, 2026
Place of performance
Elizabeth City, NC
Description
Attachment 1
Solicitation 70Z03821QK0000021
Statement of Work (SOW)
1.0 General
The United States Coast Guard (USCG), Aviation Logistics Center (ALC) has a requirement for repair
of Stratasys 3D printer (L2262-900) in accordance with (IAW) the original equipment manufacturer
(OEM) specifications.
2.0 Requirements
Performance under this Purchase Order shall be performed at:
USCG ALC (IOD)
1664 Weeksville Rd.
Building 100 Shop 103
Elizabeth City, NC 27909
Due to a failure in the primary HMF facility air system, water and oil contamination bypassed the
facility air dryer and entered the Fortus 900 printer. This contamination fouled the printer's onboard air
dryer, causing a critical system fault. The equipment warranty mandates a waterless and oilless air
supply. Because the Fortus 900 is a commercial-grade system, Stratasys restricts the distribution of new,
original parts to outside vendors. Therefore, OEM-certified field service engineers must perform the
repair directly.
The Contractor’s technical point of contact (POC) for this effort is Derek Blackford. His contact
information is: Phone 252-455-5437, or by email Derek.A.Blackford@uscg.mil
2.1 Over and Above Hardware and/or Repairs
If the Contractor determines that the Stratasys L2262-F900 System requires a replacement of parts,
and/or additional labor hours, not already covered under this order, the Contractor shall provide a
separate quote for this work. The quotation shall include a description of repairs, itemized pricing of
replacement parts, hardware, and the number of labor hours required to complete the repairs. No work
shall be performed until an executed modification is in place.
The Contracting Officer will be responsible for reviewing the quotation. Every effort will be made to
provide approval in time to allow the Contractor to complete the repair while in their custody. If this is
not possible, the Contracting Officer will respond to the quotation no later than 30 days after receipt.
Additional work shall not be performed until the quotation is accepted and a modification is provided by
the Contracting Officer.
The USCG shall not be liable for any amount expended by the Contractor in excess of the applicable
firm fixed price reflected in the schedule unless prior written authorization has been given by the
Contracting Officer.
2.2 Replacement Parts
Parts of the Stratasys 3D printer found to be in a serviceable condition as a result of functional testing
shall be reused. Missing parts and parts found to be defective or that require replacement according to
the OEM’s recommendations shall be replaced with parts meeting the OEM’s specifications and
drawings. Replacement parts shall be new.
-- 1 of 2 --
Attachment 1
Solicitation 70Z03821QK0000021
Statement of Work (SOW)
3.0 Contractor Personnel
3.1 Qualified Personnel
The Contractor shall provide personnel qualified to perform all requirements specified in this SOW.
Qualified personnel shall have been trained and authorized by the OEM to perform these services.
4.0 Environmental, Safety, And Occupational Health
The Contractor is solely responsible for compliance with all federal, state and local laws, including but
not limited to the Occupational, Safety and Health Act (OSHA) (Public Law 91-596) and the resulting
standards, OSHA Standard 29 CFR 1910 and any ALC Instructions as applicable, and the protection of
their employees. Note: ALC Instructions are annotated because many of the USCG/ALC standards
exceed the OSHA standard criteria. If a conflict is noted, the most stringent requirement takes
precedence. The USCG shall assume no liability or responsibility for the Contractor's compliance or
non-compliance with such requirements. In addition, the Contractor is required to flow down the safety
requirements/specifications to all subcontracts/subcontractors. Safety requirements listed herein that do
not concern Contractor’s operations or services shall be considered self-deleting as mutually agreed by
the Contracting Officer and the Contractor.
-- 2 of 2 --
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗