Fuel Tank Inspection, Test, Maintenance Services in Osan Air Base, Korea
DEPT OF DEFENSE
Notice type
Presolicitation
Solicitation #
F3J3CE6148A001-LCS
NAICS
811310
PSC
Z1NA
Posted
August 24, 2026
Response due
September 1, 2026
What this opportunity is
The Department of Defense is seeking services for fuel tank inspection, testing, maintenance, and repair at Osan Air Base in Korea, specifically for a fleet of 365 tanks. This presolicitation notice is suitable for small businesses under NAICS code 811310, which covers commercial and industrial machinery repair and maintenance. Interested vendors should note that this is a presolicitation, indicating they should track the opportunity for further details rather than submit bids at this stage.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
PERFORMANCE WORK STATEMENT (PWS)
(Includes associated Performance Requirements Summary (PRS))
FUEL STORAGE TANK MANAGEMENT, MONTHLY / ANNUAL
INSPECTION, MAINTENANCE
SERVICE CALL, AND REPAIR — OSAN AIR BASE, REPUBLIC OF
KOREA
Department of the Air Force · 51st Civil Engineer Squadron (51 CES)
Osan Air Base · Republic of Korea · USFK Area III
Date: 13 August 2026 (supersedes Rev. August 8 2026)
Tank Inventory Baseline: 365 tanks · Current As-of Date (CAD): August 2026
-- 1 of 47 --
2
Table of Contents
1. GENERAL.............................................................................................................................................................3
1.1. Description of Services ...................................................................................................................................3
1.2. Background .....................................................................................................................................................5
1.3. Objectives .......................................................................................................................................................5
1.4. Scope ..............................................................................................................................................................5
1.5. Initial Inspection Requirements ......................................................................................................................7
1.6. Period of Performance .................................................................................................................................. 10
1.7. Antiterrorism (AT) and Operations Security (OPSEC) ................................................................................ 10
1.8. General Information...................................................................................................................................... 11
2. ADDITIONAL GENERAL REQUIREMENTS ................................................................................................. 20
2.1. Korean Regulatory Framework Compliance ................................................................................................ 22
3. DEFINITIONS AND ACRONYMS ................................................................................................................... 22
3.1. Definitions .................................................................................................................................................... 22
3.2. Acronyms...................................................................................................................................................... 24
4. GOVERNMENT FURNISHED ITEMS AND SERVICES ................................................................................ 24
5. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES ................................................................. 25
6. SPECIFIC TASKS .............................................................................................................................................. 25
6.1. Initial Tank Inventory, STI Baseline Survey, and Pre-Inspection Service (Base Year Only) ...................... 25
6.2. Monthly Inspection with Preventive Maintenance (PM) & Annual Inspection with PM ............................. 25
6.3. Tank Cleaning Operations ............................................................................................................................ 34
6.4. Building 517 AAFES Gas Station — UST System Technical Inspections and Testing ............................... 37
7. SERVICE CALL ORDERS ................................................................................................................................ 39
8. TECHNICAL EXHIBITS ................................................................................................................................... 40
8.1. Technical Exhibit 1: Estimated Workload Data ........................................................................................... 40
8.2. Technical Exhibit 2: Performance Requirements Summary (PRS) .............................................................. 40
8.3. Technical Exhibit 3: Contract Data Requirements List (CDRL) .................................................................. 42
8.4. Technical Exhibit 4: Labor Allocation per Tank Inspection Index ............................................................... 43
8.5. Technical Exhibit 5: Osan Tank Inspection Checklists v4 ........................................................................... 44
9. APPLICABLE PUBLICATIONS ....................................................................................................................... 44
10. CONTINUATION OF ESSENTIAL DEPARTMENT OF DEFENSE (DOD) CONTRACTOR SERVICES
DURING CRISIS .................................................................................................................................................... 44
11. ORGANIZATIONAL CONFLICT OF INTEREST ......................................................................................... 44
12. ENVIRONMENTAL CONTROLS ................................................................................................................... 44
13. REFERENCES .................................................................................................................................................. 45
14. GENERAL PROVISIONS ................................................................................................................................ 46
ATTACHMENT/TECHNICAL EXHIBIT LIST .................................................................................................... 46
-- 2 of 47 --
3
1. GENERAL
The Contractor shall provide comprehensive fuel storage tank management, monthly and annual inspections, service
calls, and repair services for Aboveground Storage Tanks (ASTs), Undergroun…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.