TSC IIJA 8530 UNIVERSAL TEST FIXTURE
INTERIOR, DEPARTMENT OF THE
Notice type
Combined Synopsis/Solicitation
Solicitation #
140R4026Q0120
NAICS
332312
PSC
9640
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
July 21, 2026
Response due
July 31, 2026
Description
Statement of Work (SOW)
TSC IIJA 8530 Universal Test Fixture
1. Introduction
The Bureau of Reclamation (Reclamation or USBR) is a water management agency with 600 dams in the
17 western states. Reclamation is known for construction of dams, power plants, and canals, including
Hoover Dam on the Colorado River, Grand Coulee Dam on the Columbia River, and Folsom Dam on the
American River. Reclamation is the largest wholesaler of water in the country and second largest
producer of hydroelectric power in the western US.
2. Background
The Concrete and Structural Laboratory (CSL) utilize a Vibration Laboratory to perform unique structural
and material testing, such as dynamic load testing, multidirectional load testing, and vibration or
isolation load testing. Testing in this laboratory is commonly performed via a series of structural load
frames and reaction blocks to provide restraint.
Due to the unique and often random nature of set-ups that are needed to perform various tests, it is
often more efficient to utilize modular frames that can be configured in several orientations with as few
pieces as reasonably feasible.
The current frames allow only a limited number of configurations and when different configurations are
required, individual projects often face cost increases and schedule delays associated with procurement
of specific equipment. The purpose of the Universal Test Frame is to provide a modular frame enabling
faster and more efficient laboratory use on given projects, while simultaneously increasing testing
capabilities when paired with existing equipment.
3. Scope
Reclamation requires one (1) “Universal Test Fixture”. The fixture shall consist of multiple pieces that are
intended to assemble together in a variety of configurations. The fixture and constituent pieces shall be
fabricated based on these specifications and accompanying drawings.
Submit shop drawings for review and written approval prior to fabrication.
4. Salient Characteristics
CLIN 0010: One (1) Universal Test Frame: 12-foot Column-Girder Assembly
Requirements:
1. Frame sections and sizes as indicated on Drawings 0010-1 and 0010-2, to include the following:
a. Two (2) 12-foot columns with base plates
b. One (1) 6-foot girder/beam
c. Four (4) support angles
d. Hardware: bolts, nuts, and washers
-- 1 of 3 --
2. Steel Frame Material:
a. ASTM A36 steel
3. Hardware:
a. ASTM A325 steel, quantity and sizes as indicated on drawings
4. Coating:
a. All steel sections, except hardware, shall be coated.
b. Material: Sherwin Williams Steel Spec 3002 Universal Primer – Red Oxide, or equal
c. 2 coats
CLIN 0020: One (1) Universal Test Frame: 6-foot Column-Grirder Assembly
Requirements:
1. Frame sections and sizes as indicated on Drawings 0020-1 and 0020-2, to include the following:
a. Two (2) 6-foot columns with base plates
b. One (1) 6-foot girder/beam
c. Four (4) support angles
d. Hardware: bolts, nuts, and washers
2. Steel Frame Material:
a. ASTM A36 steel
3. Hardware:
a. ASTM A325 steel, quantity and sizes as indicated on drawings
4. Coating:
a. All steel sections, except hardware, shall be coated.
b. Material: Sherwin Williams Steel Spec 3002 Universal Primer – Red Oxide, or equal
c. 2 coats
CLIN 0030: One (1) Universal Test Frame: 6-foot Column Extension Assembly
Requirements:
1. Frame sections and sizes as indicated on Drawing 0030-1, to include the following:
a. Two (2) 6-foot column extensions
b. Four (4) splice plates
c. Hardware: bolts, nuts, and washers
2. Steel Frame Material:
a. ASTM A36 steel
3. Hardware:
a. ASTM A325 steel, quantity and sizes as indicated on drawings
4. Coating:
a. All steel sections, except hardware, shall be coated.
b. Material: Sherwin Williams Steel Spec 3002 Universal Primer – Red Oxide, or equal
c. 2 coats
5. Required Submittals
1. Submit shop drawings for review and written approval prior to fabrication.
-- 2 of 3 --
6. Point of Contact
Contracting Officer (CO): Connieann Tudela-Kately
Contract Specialist: Keith L. Singleton- keith_singleton@ios.doi.gov
Contracting Officer’s Representative (COR): Katelyn O’Quninn– koquinn@usbr.gov
Contract Authority Statement: Any changes, modifications, or obligations associated with this contract
must be approved in writing by the Contracting Officer. The Contracting Officer is the only individual
authorized to obligate the Government or make changes to the contract.
7. Delivery Requirements
The Contractor shall be responsible for all costs associated with shipping and delivery. Delivery shall be
Free on Board (FOB) Destination, with the Contractor bearing all costs and risks of transportation until
the equipment is delivered and accepted at the final destination:
Delivery Address:
Bureau of Reclamation
1 Denver Federal Center
Building 56, Entrance S-6
Denver, CO 80225
• The Contractor shall provide at least 48 hours’ advance notice of delivery.
• Deliveries shall be made Monday through Thursday, 8:00 AM to 2:00 PM Mountain Time.
• Deliveries outside these hours must receive prior written approval from the Contracting Officer or
designated point of contact.
• All equipment must be delivered in no more than one shipment per CLIN; partial CLIN shipments are
not acceptable.
• Delivery date shall be based on the vendor’s proposed timeline, as provided in their quote and
accepted by the Government.
8. Inspection and Acceptance
• Inspection and acceptance shall occur at the delivery destination by authorized Bureau of
Reclamation personnel.
• Acceptance is contingent upon verification that all equipment is complete, free from damage, and
meets all contract specifications.
• The Government reserves the right to reject and require replacement of any nonconforming items
at no additional cost.
9. Payment
This is a Firm-Fixed-Price (FFP) contract.
Payment is contingent upon:
• Contractor satisfying delivery responsibilities, including shipping costs.
• Product received at the agreed location.
• Product meeting o…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 332312)
EOU Sunshades Creech AFB
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due August 7, 2026
Outdoor Recreation - Mobile Bleachers
DEPT OF DEFENSE · Solicitation · due July 29, 2026
Outdoor Recreation - Mobile Bleachers
DEPT OF DEFENSE · Solicitation · due July 29, 2026
MEX-NEC SCAFFOLDING FOR COOLING TOWERS PREVENTIVE MAINTENANCE
STATE, DEPARTMENT OF · Presolicitation · due August 7, 2026
Outdoor Recreation - Mobile Bleachers
DEPT OF DEFENSE · Solicitation · due July 28, 2026
Full and Open Competition: Custom Machined Parts - CMMC Level 1- Request Access to Drawings through SAM. Provide CAGE Code when requesting access in SAM.
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due July 28, 2026