U.S. ARMY 63RD READINESS DIVISION MILCON ERCIP MICROGRID
DEPT OF DEFENSE
Notice type
Solicitation
Solicitation #
W9123826RA016
NAICS
237130
PSC
Y1MG
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
July 8, 2026
Response due
July 31, 2026
What this opportunity is
The U.S. Army 63rd Readiness Division is seeking a contractor to install a microgrid system, including a 750kWdc PV system, 750kWh battery energy storage system (BESS), and an 800kW generator system. This total small business set-aside opportunity is suitable for small businesses with experience in electrical construction, specifically in the NAICS code 237130. The solicitation notice indicates that bidders should track the opportunity, as it is not a formal bid solicitation.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
Specifications
Install Microgrid, 750kWdc PV, 750kWh
BESS, & 800kW Generator System
Contract No. W912DY19D0027
Task Order No. W912DY21F0044
US Army Reserve 63d
Readiness Division
Mountain View, CA
Final Design Submittal Draft
October 6, 2025
-- 1 of 1704 --
INSTALL MICROGRID, 750kW PV, 750kWh BESS, & 800kW GENERATOR
SYSTEM - US ARMY RESERVES 63D READINESS DIVISION
10/06/2025
Pages or sheets covered by this seal:
01 11 00, 01 14 00, 01 20 00,
01 30 00, 01 32 01.00 10, 01 33 00,
01 35 26,01 45 00, 01 45 00.15 10,
01 50 00, 01 57 19, 01 58 00,
01 74 19, 01 78 00, 01 78 23,
07 84 00
10/06/2025
Pages of sheets covered by this seal:
01 45 35, 03 30 00, 05 12 00,
05 50 13, 05 51 00, 05 52 00,
07 92 00
10/06/2025
Pages or sheets covered by this seal:
01 91 00.16, 26 37 13, 27 10 00,
33 82 00, 40 60 00
10/06/2025
Pages or sheets covered by this seal:
02 41 00, 03 42 13.00 10, 31 00 00,
31 11 00, 32 01 19.61, 32 11 20,
32 11 23, 32 12 13, 32 12 16.16,
32 13 13.06, 32 16 19, 32 31 13,
33 11 00, 33 40 00
-- 2 of 1704 --
INSTALL MICROGRID, 750kW PV, 750kWh BESS, & 800kW GENERATOR
SYSTEM - US ARMY RESERVES 63D READINESS DIVISION
10/06/2025
Pages or sheets covered by this seal:
09 97 13.17, 09 97 13.27, 13 48 73,
23 05 93, 33 01 50.31, 33 08 55,
33 09 52, 33 52 10, 33 52 23.15,
33 56 10, 33 57 55
10/06/2025
Pages or sheets covered by this seal:
25 05 11
10/06/2025
Pages or sheets covered by this seal:
26 05 19.00 10, 26 05 48, 26 05 73,
26 08 00, 26 12 19, 26 13 13,
26 13 14, 26 20 00, 26 31 00,
26 32 15, 26 33 57, 33 71 02
10/06/2025
Pages or sheets covered by this seal:
28 31 70
-- 3 of 1704 --
INSTALL MICROGRID, 750kW PV, 750kWh BESS, & 800kW GENERATOR
SYSTEM - US ARMY RESERVES 63D READINESS DIVISION
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 02/24 SUMMARY OF WORK
01 14 00 11/22, CHG 3: 08/24 WORK RESTRICTIONS
01 20 00 11/20, CHG 4: 08/24 PRICE AND PAYMENT PROCEDURES
01 30 00 11/20, CHG 4: 08/24 ADMINISTRATIVE REQUIREMENTS
01 32 01.00 10 08/23, CHG 1: 08/24 PROJECT SCHEDULE
01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES
01 35 26 05/24 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 05/24 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00 08/23, CHG 1: 05/24 QUALITY CONTROL
01 45 00.15 10 11/23 RESIDENT MANAGEMENT SYSTEM CONTRACTOR
MODE (RMS CM)
01 45 35 05/24 SPECIAL INSPECTIONS
01 50 00 11/20, CHG 3: 08/24 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19 08/22 TEMPORARY ENVIRONMENTAL CONTROLS
01 58 00 08/19, CHG 5: 08/22 PROJECT IDENTIFICATION
01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
01 78 00 05/19, CHG 1: 08/21 CLOSEOUT SUBMITTALS
01 78 23 05/23 OPERATION AND MAINTENANCE DATA
01 91 00.16 05/23 COMMISSIONING - MICROGRID
DIVISION 02 - EXISTING CONDITIONS
02 41 00 08/22 DEMOLITION
DIVISION 03 - CONCRETE
03 30 00 02/19, CHG 9: 08/24 CAST-IN-PLACE CONCRETE
03 42 13.00 10 05/16 PLANT-PRECAST CONCRETE PRODUCTS FOR
BELOW GRADE CONSTRUCTION
DIVISION 05 - METALS
05 12 00 08/18, CHG 2: 05/21 STRUCTURAL STEEL
05 50 13 08/24 MISCELLANEOUS METAL FABRICATIONS
05 51 00 08/23 METAL STAIRS
05 52 00 08/23 METAL RAILINGS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 84 00 05/10, CHG 1: 08/13 FIRESTOPPING
07 92 00 08/23 JOINT SEALANTS
DIVISION 09 - FINISHES
09 97 13.17 05/22 THREE COAT EPOXY INTERIOR COATING OF
WELDED STEEL PETROLEUM FUEL TANKS
09 97 13.27 02/21, CHG 1: 08/22 HIGH PERFORMANCE COATING FOR STEEL
STRUCTURES
DIVISION 13 - SPECIAL CONSTRUCTION
13 48 73 05/22 SEISMIC CONTROL FOR MISCELLANEOUS
EQUIPMENT
PROJECT TABLE OF CONTENTS Page 1
-- 4 of 1704 --
INSTALL MICROGRID, 750kW PV, 750kWh BESS, & 800kW GENERATOR
SYSTEM - US ARMY RESERVES 63D READINESS DIVISION
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR
HVAC
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11 08/24 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS
DIVISION 26 - ELECTRICAL
26 05 19.00 10 11/22 INSULATED WIRE AND CABLE
26 05 48 11/23 SEISMIC PROTECTION FOR ELECTRICAL
EQUIPMENT
26 05 73 08/23 POWER SYSTEM STUDIES
26 08 00 11/22 APPARATUS INSPECTION AND TESTING
26 12 19 05/24 PAD-MOUNTED, LIQUID-FILLED,
MEDIUM-VOLTAGE TRANSFORMERS
26 13 13 11/21 METAL-CLAD SWITCHGEAR
26 13 14 11/21 SWITCHGEAR HOUSE
26 20 00 08/23 INTERIOR DISTRIBUTION SYSTEM
26 31 00 11/21 FACILITY-SCALE SOLAR PHOTOVOLTAIC (PV)
SYSTEMS
26 32 15 05/24 ENGINE-GENERATOR SET STATIONARY
15-2500 KW, WITH AUXILIARIES
26 33 57 12/21 BATTERY ENERGY STORAGE SYSTEM (BESS)
26 37 13 02/24 MICROGRID CONTROL SYSTEM
DIVISION 27 - COMMUNICATIONS
27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING
SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 70 08/20 INTERIOR FIRE ALARM SYSTEM, ADDRESSABLE
DIVISION 31 - EARTHWORK
31 00 00 08/23 EARTHWORK
31 11 00 11/18 CLEARING AND GRUBBING
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19.61 11/19 SEALING OF JOINTS IN RIGID PAVEMENT
32 11 20 05/22 BASE COURSE FOR RIGID PAVING
32 11 23 05/22 AGGREGATE BASE COURSE
32 12 13 05/24 BITUMINOUS PRIME COATS
32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING
32 13 13.06 05/20 PORTLAND CEMENT CONCRETE PAVEMENT FOR
ROADS AND SITE FACILITIES
32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 31 13 11/21 CHAIN LINK FENCES AND GATES
DIVISION 33 - UTILITIES
33 01 50.31 02/20 LEAK DETECTION FOR FUELING SYSTEMS
PROJECT TABLE OF CONTENTS Page 2
-- 5 of 1704 --
INSTALL MICROGRID, 750kW PV, 750kWh BESS, & 800kW GENERATOR
SYSTEM - US ARMY RESERVES 63D READINESS DIVISION
33 08 55 08/19 FUEL DISTRIBUTION SYSTEM START-UP
(NON-HYDRANT)
33 09 52 11/18 FUEL PUMP CONTROL AND ANNUNCIATION
SYSTEM (NON-HYDRANT)
33 11 00 08/24 WATER UTILITY DISTRIBUTION PIPING
33 40 00 11/21 STORMWATER UTILITIES
33 52 10 11/18, CHG 1: 11/20 FUEL SYSTEMS PIPING (SERVICE STATION)
33 52 23.15 11/18 POL SERVICE PIPING WELDING
33 56 10 05/19, CHG 1: 11/20 FACTORY-FABRICATED FUEL STORAGE TANKS
33 57 55 11/…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 237130)
178th Wing Base Microgrid Construction
DEPT OF DEFENSE · Solicitation · due August 14, 2026
Nez Perce-Clearwater NF - Seed Orchard Disconnect and Electrical Life Safety Rehab
AGRICULTURE, DEPARTMENT OF · Combined Synopsis/Solicitation · due July 27, 2026
XUMU 20260001 OSP Oak Mountain Fiber Relocation
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due August 21, 2026
Nez Perce-Clearwater NF - Seed Orchard Disconnect and Electrical Life Safety Rehab
AGRICULTURE, DEPARTMENT OF · Combined Synopsis/Solicitation · due July 27, 2026
Eareckson Air Station Container Tower
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due July 25, 2026
New CS Fiber Optics Infrastructure Rehoming Project-156th WG PR ANG
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due August 5, 2026