What this opportunity is
The USCG is seeking a small business to replace the existing audio system at the Coast Guard Yard Gymnasium in Maryland with a modern commercial-grade system. The new system must provide uniform audio coverage, improved speech intelligibility, Bluetooth and wireless microphone capabilities, and reliable operation. A mandatory site visit is required prior to submitting a quotation, during which the contractor must verify existing equipment, installation conditions, and work requirements. This opportunity is suitable for small businesses with experience in audio system installation and commercial-grade equipment.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
PR #: 31800PR260041642
STATEMENT OF WORK
LAST UPDATED: 07/10/2026 PAGE 1/8
STATEMENT OF WORK (SOW)
Audio System Upgrade
Coast Guard Yard Gymnasium
Building 144 Coast Guard Yard Baltimore, Maryland
1.0 GENERAL
1.1 BACKGROUND
The U.S. Coast Guard Yard Morale, Welfare, and Recreation (MWR) Program operates the Columbus
Recreation Center, which hosts official command functions, athletic events, training, ceremonies,
recreational activities, and community programs.
The existing public address (PA) audio system has exceeded its useful service life and no longer provides
reliable sound quality or adequate coverage throughout the gymnasium. The Government requires
replacement of the existing equipment with a modern commercial-grade audio system capable of
supporting voice announcements, music playback, athletic events, ceremonies, and special events.
1.2 SCOPE
The Contractor shall furnish and install a complete audio system including removal of obsolete
equipment, installation of new equipment, replacement of wiring, testing, commissioning, and operator
familiarization.
The Contractor shall perform all work necessary to provide a fully functional turnkey installation.
1.3 OBJECTIVE
Provide all labor, supervision, materials, equipment, tools, transportation, permits (if required), testing,
programming, and incidental services necessary to remove the existing audio equipment and furnish and
install a complete, fully operational commercial audio system at the Columbus Recreation Center.
The completed system shall provide:
• Uniform audio coverage throughout the gymnasium
• Improved speech intelligibility
• Bluetooth audio capability
• Wireless microphone capability
• Reliable commercial-grade operation
• Expandability for future system additions
2.0 REQUIREMENTS
2.1 Mandatory Site Visit
A site visit is mandatory prior to submitting a quotation.
-- 1 of 8 --
PR #: 31800PR260041642
STATEMENT OF WORK
LAST UPDATED: 07/10/2026 PAGE 2/8
The Contractor shall coordinate the visit with the Contracting Officer’s Representative (COR) to inspect
existing equipment, verify installation conditions, and confirm all work requirements.
The site visit shall include verification of:
• Existing speaker locations
• Existing wall-mounted hardware
• Equipment rack accessibility
• Existing amplifier and mixer location
• Existing wiring pathways
• Ceiling heights
• Electrical power availability
• Scissor lift requirements
• Cable routing
• Existing conduit utilization
• Mounting conditions
• Future speaker expansion routing
• Any field conditions affecting installation
Failure to attend the mandatory site visit may render the quotation ineligible for award.
Site visits shall be scheduled during normal Government business hours.
2.2. Existing Equipment Removal
The Contractor shall remove existing speakers, amplifier, mixer, microphone system, obsolete wiring, and
associated hardware as necessary to complete the installation.
Dispose of removed materials in accordance with applicable federal, state, and local regulations unless
otherwise directed by the Contracting Officer
2.3 Furnish and Install New Equipment
The Contractor shall furnish and install equipment meeting or exceeding the following minimum
specifications:
Speakers
• Four (4) JBL 15”-2 Way Full Range Loudspeakers
• Brand Name or Equal
Amplifier
-- 2 of 8 --
PR #: 31800PR260041642
STATEMENT OF WORK
LAST UPDATED: 07/10/2026 PAGE 3/8
• One (1) Origin Acoustics
• Four-Channel
• 750-Watt High-Power Amplifier
• Brand Name or Equal
Wireless Microphones
• One (1) Shure Dual Channel Wireless Vocal Microphone System
• Two handheld microphones
• Receiver
• Required accessories
Commercial Mixer
• One (1) JBL Professional CSM-28 8 input 2-Output Commercial Audio Mixer
• Brand Name or Equal
Bluetooth Receiver
• One (1) LFI USA Zen Air Bluetooth Receiver
Watt Box
• Eight Outlet
• 400 Series Power Conditioner
The Contractor shall provide all equipment required to install including a scissor lift if necessary. Any
rental costs shall be included in the contract price
2.4 Speaker Wiring
Replace all existing speaker wiring.
Install approximately 700 feet of 14/2 white direct burial speaker cable or approved equal.
All wiring shall be concealed where practical, properly supported, terminated, labeled, and tested.
2.5 Equipment Rack
Reuse the existing equipment rack.
2.6 Programming and System Configuration
Configure the complete system including:
• Wireless microphones
-- 3 of 8 --
PR #: 31800PR260041642
STATEMENT OF WORK
LAST UPDATED: 07/10/2026 PAGE 4/8
• Bluetooth receiver
• Mixer
• Amplifier
• Speaker balancing
• Equalization
• Gain structure
• Operational testing
2.7 Testing and Commissioning
The Contractor shall perform complete operational testing including:
• Speaker testing
• Microphone testing
• Bluetooth functionality
• Amplifier testing
• Mixer operation
• System balancing
• Audio quality verification
The Government shall witness final testing prior to acceptance.
2.8 Operator Training
Provide one hour of onsite training covering:
• System operation
• Wireless microphones
• Bluetooth operation
• Mixer controls
• Power conditioner
• Basic troubleshooting
2.9 Brand Name or Equal
Equipment identified in this Statement of Work establishes the Government's minimum requirements.
Equivalent products may be proposed provided they meet or exceed the specified performance,
functionality, durability, compatibility, and commercial quality requirements.
-- 4 of 8 --
PR #: 31800PR260041642
STATEMENT OF WORK
LAST UPDATED: 07/10/2026 PAGE 5/8
The Contractor shall submit manufacturer specifications for any proposed equivalent products.
2.10 QUALITY ASSURANCE
The Government reserves the right to inspect all work performed.
The COR shall review maintenance reports and may conduct random inspections to verify compliance
with contract requirements.
Unsatisfactory work shall be corrected by the contractor at no additional cost to the Government.
3.0 CONTRACTOR PERSONNEL
3.1 QUALIFIED P…