USCGC ELM (WLB 204) FY26 Dockside Availability

HOMELAND SECURITY, DEPARTMENT OF

Notice type
Combined Synopsis/Solicitation
Solicitation #
70Z08526QIBCT0055
NAICS
336611
PSC
J999
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
July 15, 2026
Response due
August 11, 2026

What this opportunity is

The Department of Homeland Security is buying dockside repairs for the USCGC ELM, which suits total small businesses due to the set-aside. The required work includes various maintenance tasks such as fire prevention, cargo hatch servicing, and exhaust piping cleaning. As a Combined Synopsis/Solicitation notice, this means that the government is both announcing the opportunity and soliciting bids at the same time, so interested small businesses should track and prepare to bid accordingly.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

USCGC ELM (WLB 204) SPECIFICATION FOR DOCKSIDE REPAIRS FY2026 Developed By: Keith A Hoefer (Rev-0, 13 February 2026) -- 1 of 185 -- USCGC ELM (WLB-225A) DOCKSIDE AVAILABILITY FY2026 ii (Rev-0) TABLE OF CONTENTS Revisions Record ......................................................................................................................................... iii Consolidated List of References ...................................................................................................................iv Consolidated List of Government-furnished Property .................................................................................ix Consolidated List of Critical Inspection Items ........................................................................................... xii Principal Characteristics ............................................................................................................................ xiii General Requirements ................................................................................................................................... 1 WORK ITEM 1: Fire Prevention Requirements ......................................................................................... 14 WORK ITEM 2: Hydraulically Operated Cargo Hatch, Inspect and Service ............................................. 18 WORK ITEM 3: Main Diesel Engine, MDE, Exhaust Piping, Commercial Clean ....................................22 WORK ITEM 4: Ship Service Diesel Generator, SSDG, Exhaust Piping, Commercial Clean .................. 25 WORK ITEM 5: Vent Ducts, Engine And Motor Room, All, Commercial Cleaning ................................29 WORK ITEM 6: Vent Ducts, Galley and Pantry Room, All, Commercial Cleaning .................................32 WORK ITEM 7: Vent Ducts, Laundry Exhaust, Commercial Cleaning.....................................................35 WORK ITEM 8: Vent Ducts, All Other, Commercial Cleaning .................................................................38 WORK ITEM 9: Compressed Air Receivers and System Valves, All, Clean, Inspect, Hydro and Lift ..... 41 WORK ITEM 10: Hydraulic Chain Stoppers, Inspect And Service ...........................................................48 WORK ITEM 11: Crossdeck Winches, Inspect and Service ......................................................................52 WORK ITEM 12: Hydraulic Inhaul Winch, Inspect And Service ..............................................................58 WORK ITEM 13: Mechanical Chain Stoppers, Inspect and Service .......................................................... 67 WORK ITEM 14: Warping Capstan, Inspect and Service ..........................................................................70 WORK ITEM 15: Hull Fittings (Mooring and Towing), Inspect and Test ................................................. 73 WORK ITEM 16: Single Point Davit, Inspect and Service ........................................................................76 WORK ITEM 17: Buoy Crane, Appleton EB600-60-40, Inspect and Service ........................................... 80 WORK ITEM 18: Grey Water Holding Tanks, Clean and Inspect .............................................................86 WORK ITEM 19: Sewage Holding Tanks, Clean and Inspect ...................................................................90 WORK ITEM 20: Grey Water Piping, Clean and Flush .............................................................................94 WORK ITEM 21: Sewage Piping, Clean and Flush ................................................................................... 98 WORK ITEM 22: Tanks, Grey Water Holding, Preserve, Partial ............................................................102 WORK ITEM 23: Tanks (Sewage Holding), Preserve, Partial ................................................................. 105 WORK ITEM 24: SORS Cargo Rail Remove ..........................................................................................108 WORK ITEM 25: Decks - Exterior, Preserve, Non-Skid Broadcast Grit System ....................................111 WORK ITEM 26: Superstructure, Preserve, 100 Percent .........................................................................114 WORK ITEM 27: Temporary Services, Provide - Cutter .........................................................................119 WORK ITEM 28: Bow Thruster Machinery Room, Inspect Piping and Preserve Surfaces .....................122 WORK ITEM 29: Watertight Doors and Scuttles, External, Renew ........................................................125 WORK ITEM 30: Circuit Breakers, Inspect, Maintain & Test .................................................................129 WORK ITEM 31: Deck Covering and Ventilation Renew ....................................................................... 138 WORK ITEM 32: Pilot House Windows and Frame, Repair and Reseal .................................................141 WORK ITEM 33: Air Escape (AE) Piping & Cofferdam, Renew & Preserve .........................................145 WORK ITEM 34: Cargo Hatch Drain Piping, Renew ..............................................................................149 WORK ITEM 35: Directional Control Valve, Upgrade............................................................................151 WORK ITEM 36: Steering Gear Heat Exchanger, Modify ......................................................................159 WORK ITEM 37: Vent Fans and Motors, Non-Machinery Spaces, Overhaul ......................................... 162 WORK ITEM 38: Bridge Windows, Renew .............................................................................................165 WORK ITEM 39: Pilothouse Exterior Safety Rail, Renew ......................................................................168 WORK ITEM 40: Tenting, Provide ..........................................................................................................170 -- 2 of 185 --

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 336611)